Request Proposal for Central Data Center in Municipality Of
Pateros
Background
Pateros, officially the Municipality of Pateros, is the lone and 1st class municipality in
Metropolitan Manila, Philippines. According to the 2015 census, it has a population of
63,643 people.
This municipality is famous for its duck-raising industry and especially for producing
balut, a Filipino delicacy, which is a boiled, fertilised duck egg. Pateros is also known for
the production of red salty eggs and "inutak", a local rice cake. Moreover, the town is
known for manufacturing of "alfombra", a locally-made footwear with a carpet-like fabric
on its top surface. Pateros is bordered by the following highly urbanized cities of Pasig
to the north, Makati to the west, and Taguig to the south.
Pateros is the only municipality and the smallest, both in population and in land area, in
Metro Manila, but it is the second most densely populated at around 29,000 people per
square kilometer after Manila.
Purposed
We would like to innovate Municipality Hall of Pateros by Building a Central Data Center
to built with a single resource tier containing all of the server and storage resources
needed to power any application or workload. This improves scalability without the need
to spend more on additional hardware or high-speed, dedicated networking equipment.
1. Proposed property location and facility characteristics: The Offeror shall
provide a facility that is fully concurrently maintainable and comply with Tier III
standards and be able to withstand natural disasters such as Category 3 storms,
typhoons, and floods. The provided space should be contiguous and securely
segregated from the other clients’ space.
2. Security and access control: For Virtual and Physical security
pf3
pf4
pf5

Partial preview of the text

Download Central data center proposal and more Papers Systems Design in PDF only on Docsity!

Request Proposal for Central Data Center in Municipality Of

Pateros

Background

Pateros, officially the Municipality of Pateros, is the lone and 1st class municipality in Metropolitan Manila, Philippines. According to the 2015 census, it has a population of 63,643 people. This municipality is famous for its duck-raising industry and especially for producing balut, a Filipino delicacy, which is a boiled, fertilised duck egg. Pateros is also known for the production of red salty eggs and "inutak", a local rice cake. Moreover, the town is known for manufacturing of "alfombra", a locally-made footwear with a carpet-like fabric on its top surface. Pateros is bordered by the following highly urbanized cities of Pasig to the north, Makati to the west, and Taguig to the south. Pateros is the only municipality and the smallest, both in population and in land area, in Metro Manila, but it is the second most densely populated at around 29,000 people per square kilometer after Manila. Purposed We would like to innovate Municipality Hall of Pateros by Building a Central Data Center to built with a single resource tier containing all of the server and storage resources needed to power any application or workload. This improves scalability without the need to spend more on additional hardware or high-speed, dedicated networking equipment.

  1. Proposed property location and facility characteristics: The Offeror shall provide a facility that is fully concurrently maintainable and comply with Tier III standards and be able to withstand natural disasters such as Category 3 storms, typhoons, and floods. The provided space should be contiguous and securely segregated from the other clients’ space.
  2. Security and access control: For Virtual and Physical security

Physical Security:  CCTV security network: locations and access points with 90-day video retention.  on-site security guards,  Network operations center (NOC) Services and technical team  Anti-tailgating/Anti-pass-back turnstile gate. Only permits one person to pass through after authentication.  Single entry point into co-location facility.  Minimization of traffic through dedicated data halls, suites, and cages.  Further access restriction to private cages  Three-factor authentication  SSAE 16 compliant facilities.  Checking the provenance and design of hardware in use  Reducing insider risk by monitoring activities and keeping their credentials safe[26]  Monitoring of temperature and humidity  Fire prevention with zoned dry-pipe sprinkler  Natural disaster risk-free locations. Virtual Security:  Heavy data encryption during transfer or not: 256-bit SSL encryption for web applications.1024-bit RSA public keys for data transfers. AES 256-bit encryption for files and databases.  Logs auditing activities of all users.  Secured usernames and passwords: Encrypted via 256-bit SSL, requirements for complex passwords, set up of scheduled expirations, prevention of password reuse.  Access based on the level of clearance.  AD/LDAP integration.  Control based on IP addresses.  Encryption of session ID cookies in order to identify each unique user.  Two-factor authentication availability.  Third party penetration testing performed annually  Malware prevention through firewalls and automated scanned

  1. Racks And Cabinets:

4.) Infinity free server: the facility must have a server free and unlimited web hosting with PHP and MySQL. It can access information on a device, such process personal data, such as unique identifiers and standard information sent by a device for personalised ads and content, ad and content measurement, and audience insights, as well as to develop and improve products. 5.) Network and cabling infrastructure: The facility must be carrier neutral and host a minimum of 5 different carriers and/or access providers. The facility is required to have 10G high-speed, redundant inter-colocation network connecting to Equinix Ashburn primary MMR. The latency must be at or below 2ms between the 2 locations. The network shall achieve 99.95% availability SLA. In addition, the WBG has adopted a “Cloud First” policy and therefore is seeking a facility that has 1G to 10G high speed connectivity to AWS Direct Connect and Azure ExpressRoute.

FLOOR PLAN