Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
terms Class: IST 445 - Managing Information Systems Projects; Subject: Information Studies; University: Syracuse University; Term: Spring 2010;
Typology: Quizzes
1 / 5
This page cannot be seen from the preview
Don't miss anything!




creating a WBS by using a similar project's WBS as a starting point TERM 2
DEFINITION 2 creating a WBS by having a team members identify as many specific tasks related to the project as possible and then grouping them into higher level categories. TERM 3
DEFINITION 3 subdividing project deliverables into smaller pieces TERM 4
DEFINITION 4 a product, such as a report or segment of software code, produced as part of a project TERM 5
DEFINITION 5 using highly organized and intensive workshops to bring together project stakeholders - the sponsor, users, business analysis, programmers, and so on - to jointly define and design information systems
the processes involved in defining and controlling what work is or is not included in a project TERM 7
DEFINITION 7 a document that includes, at a minimum, a description of the project, including its overall objectives and justification, detailed descriptions of all project deliverables, and the characteristics and requirements of products and services products as part of the project. TERM 8
DEFINITION 8 developing a working replica of the system or some aspect of the system to help define user requirements TERM 9
DEFINITION 9 a condition or capability that must be met or possessed by a system, product, service, result , or component to satisfy a contract, standard, specification, or other formal document TERM 10
DEFINITION 10 a plan that describes how project requirements will be analyzed, documented, and managed
a process for identifying and modeling business events, who initiated them, and how the system should respond to them. TERM 17
DEFINITION 17 the difference between planned and actual performance TERM 18
DEFINITION 18 a document that describes detailed information about each WBS item TERM 19
DEFINITION 19 a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project TERM 20
DEFINITION 20 a task at the lowest level of the WBS