Sample Flow of Construction Activities: 2-Storey Structure
5 C L E A R I N G & G R U B I N G 6 E X C A V A T I O N 7 D E W A T E R I N G ( i f a n y ) Clearing is the removal and disposal of all vegetation, rubbish, and surface boulders embedded in the ground. While grubbing, is the uprooting and removal of roots and stumps. Excavation is the process of moving things like earth, rock, or other materials with tools, equipment, or explosives. In construction, excavation is used to create building foundations, reservoirs, and roads. The action of removing groundwater or surface water from a construction site. It is usually done before excavation for footings and will help to lower the water table that might cause problems during excavations.
8 SOIL POISONING
It is considered as the control measure for subterranean termites Installation of reinforcing bars of concrete hollow block. Installation of starter bars of columns.
Installation of reinforcing bars for girder & beams and electrical conduits inside the columns (if any)
P R E P A R A T I O N O F S H O R I N G S & F O R M W O R K S F O R S U S P E N D E D S L A B
(^28) R O O F S H E E T S I N S T A L L A T I O N
Wear proper PPE.
30 P A I N T I N G W O R K S^ Wear proper PPE.
At the completion of the electrical installation works, the entire installation shall be subject to the test before final placing in service under the full responsibility of the contractor.
(^35) O C C U P A N C Y P E R M I T An occupancy permit is required before any building/structure is used or occupied. It is usually secured after the completion of a structure. It is also required if there is any change in the existing use or occupancy classification of a building, structure or any portion thereof. 36 D E M O B I L I Z A T I O N 37 1 Y R. W A R R A N T Y This one-year correction period has become known in the construction industry as a “one-year warranty.” Both owners and contractors point to this provision as a contractual limit on the contractor's obligation to correct defective work discovered more than one year after completion of the construction. Demobilization means removal from the Site of all of Contractor's, Subcontractors' and Sub-subcontractor's personnel, supplies, materials, rubbish, temporary facilities and construction equipment. For illustration purposes only.
DISCLAIMER: IMAGES SHOWN IS FOR ILLUSTRATION ONLY TO GIVE OVERVIEW. CREDITS TO THE OWNER.