
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Various risks associated with the tune source project and proposes solutions to mitigate them. Risks include unclear project scope and objectives, contractual issues, poorly defined project schedule, user resistance, bad timing, incorrect budget estimation, and poor code quality. Strategies to address these risks include arranging specialized tasks, cooperating on contract terms, holding scheduling workshops, user testing, applying agile methodologies, maintaining budget control, and correcting technical tools. (chien, 2020; kononenko, 2020)
Typology: Assignments
1 / 1
This page cannot be seen from the preview
Don't miss anything!

Risk management for Tune Source project Risk description Severity Solution The scope and objective of the project is not well-defined Medium Arrange and organize specialized tasks. Set specific, brief, and simple goals for the project, and ensure the purpose is well defined There is a chance that the project will be misaligned in terms of both the general contractual terms and conditions. High Must be aware of all contracts in which both parties are involved. Cooperate and come to an agreement on the terms of participation in the project, as well as the project's objectives. The project schedule is not clearly defined Low Hold scheduling workshops with the project team to ensure that everyone is on board with the plan and that no tasks are forgotten. Product is released to the market but the users are resistant to change, or there is a conflict between users. Medium Some possible mitigation strategies for this risk include User testing and surveys, Frequent releases, and Beta testing. (Chien,
Bad timing - the time for the project was initially incorrectly calculated and set. Medium Apply agile methodologies, ensure the maximum involvement of all team members in planning and estimating, receive feedback at all stages, starting from the earliest ones. (Kononenko, 2020) Incorrect Budget Estimation Medium It is necessary to maintain constant control of the budget and development process. When introducing additional functions โ or the need for any changes โ calculate their cost at the discussion stage. (Kononenko,
Poor code quality and technical risks High Attempt to correct the tools and technical solutions so that we can complete the project on time and without any technical risks. Poor productivity Low Using agile methodologies allows maintaining the productivity and motivation of all team members throughout the project since the processes are divided into shorter periods of time. (Kononenko,