
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Conditional SWPPP approval for Tree Felling
Typology: Summaries
1 / 1
This page cannot be seen from the preview
Don't miss anything!

Conditional SWPPP Example Narrative CONTRACTOR would like to start clearing trees from the work sites to prepare them for construction activity. We intend on cutting down the trees and leaving them in place until a later date. The trees will be cut with chain saws fueled with gasoline. Vehicles fueled with either gasoline or diesel will be used to access the locations but will be parked at the peripheries of the work sites to minimize soil disturbance. Access to the individual tree locations will be via foot. Drainage conveyances will be avoided during the tree falling operation. Tree falling activities will not result in blocked drainage pathways and drainage inlets. Portable toilets will be towed to the sites via truck. They will remain hitched to the truck for the duration of each work day and towed off the site at the end of shift. Equipment/Tools Trucks (gasoline or diesel) Chain Saws (gasoline) Hand saws Axes Support Facilities Portable toilets (mobilized and demobilized daily) BMPs SS-01 Scheduling SS-02 Preservation of Existing Vegetation SC-04 Check Dams SC-06 Gravel Bag Berm NS-09 and -10 Vehicle/Equip Fueling and Maintenance SC-07 Street Sweeping WM-04 Spill Prevent/Control WM-09 Sanitary/Septic CONTRACTOR SIGNATURE, DATE