CTQP FINAL ESTIMATES LEVEL 2 TEST EXAM QUESTIONS AND ANSWERS VERIFIED 100% CORRECT
Typology: Exams
1 / 14
This page cannot be seen from the preview
Don't miss anything!









CTQP Final Estimates Level 2, FINAL ESTIMATES LEVEL 2 TEST QUESTIONS AND ANSWERS What are the three approved ways to modify contract documents after execution? Answer: Supplemental Agreement, Work Order, Unilateral Payment. Explanation: These are the only valid post-execution modification methods under FDOT rules. What is the correct order of document precedence in FDOT contracts? Answer: Special Provision, Technical Special Provision, Plans, Standard Plans, Developmental Specifications, Supplemental Specifications, Standard Specifications. Explanation: This hierarchy ensures consistency in interpreting contract requirements. What is a contractor’s monthly payment based on? Answer: Monthly progress estimates. Explanation: Payments reflect the work completed during each estimate period. When is retainage withheld? Answer: When percent of allowable contract used > 75% and difference between contract time used and contract amount earned exceeds 15%. Explanation: This ensures financial protection near project completion. How are work orders funded?
Answer: From the initial contingency amount (999- 25 - XX) or via a Contingency Supplemental Agreement (CSA), which requires ≥ 50% of initial contingency pay item funds expended. Explanation: Ensures contingency usage is monitored and justified. What defines a Unilateral Payment? Answer: Issued when the Department and contractor disagree on terms or contractor fails to timely execute a Work Order or Supplemental Agreement. Explanation: Used to advance payments in disputed or noncompliant situations. Can liquidated damages be refunded on a monthly progress estimate? Answer: True. Explanation: Applied or credited back in progress estimates depending on project circumstances. How is ‘error in plan quantity’ calculated? Answer: Difference between original plan quantity and final quantity exceeds 5%. Explanation: Flags significant deviations (> 5%) for review.
Answer: Pay quantity (capped at 105% of adjusted PQ), Fuel Adjustments, Bituminous Adjustments. Explanation: These components ensure fair compensation for materials and conditions. How is Composite Pay Factor (CPF) adjustment calculated? Answer: (CPF – 1) × unit price. Explanation: Reflects reward or penalty for asphalt quality/compliance. What is a Resolution Test? Answer: An independent test performed when QC and VT samples do not agree. Explanation: Ensures objective validation of conflicting test results. Where is the Resolution Test accomplished? Answer: At an independent la Explanation: Ensures unbiased and accredited results. Name typical Plan Quantity pay items. Answer: Regular excavation, Lateral ditch excavation, Embankment. Explanation: These are specified in plans and measured as part of design. Name common Final Measure items. Answer: Borrow excavation, Subsoil excavation, Channel excavation.
Explanation: Measured based on actual construction, not just plans. When might check surveys be waived? Answer: In milling/resurfacing where elevation’s uniform, earthwork around box culvert extensions only, or restoring eroded sections. Explanation: Reduces unnecessary survey work on simple or repetitive projects. What is the Final Measurement Miscellaneous Form used for? Answer: Original/final check stations, documenting temporary benchmarks, survey notes, field notes. Explanation: Consolidates miscellaneous but essential measurement data. Which end areas are NOT payable? Answer: Borrow above grading template, subsoil excavation beyond limits (A-8 muck, A- 7 plastic), channel excavation below template. Explanation: Excludes unintended excavation beyond contract boundaries. When is a structure considered a bridge by FDOT? Answer: When box culvert span ≥ 20 ft along center line. Explanation: Span size determines classification and pay method. Why is contract time important?
Explanation: Visual clarity in revisions ensures accurate review. Which manual outlines FDOT methods and procedures for preparing/checking final estimates? Answer: Preparation & Documentation Manual (PDM). Explanation: The PDM provides official guidance for estimate preparation. Which manual includes procedures for running check levels and cross-sections? Answer: Preparation & Documentation Manual and Location & Survey Manual. Explanation: Cover surveying and level checking protocols. Which of the following is NOT a contract document? Answer: Notebooks and Estimates Procedure Manual. Explanation: Administrative, not contractual. What is published between Spec printings to signal changes? Answer: Supplemental Specifications. Explanation: Updates issued between full releases. What should be included with final measurements for interpreting non-standard data? Answer: Sketches. Explanation: Helps clarify irregular measurements in make-shift situations.
What is used to document computations and summarize quantities? Answer: Computation Book. Explanation: Structured forms for detailed calculations and summaries. What report does the Paving Quality Control Technician use? Answer: Asphalt Roadway – Daily Report of Quality Control. Explanation: Tracks daily QC metrics for asphalt paving. Which item is a Plan Quantity Pay Item? Answer: Embankment. Explanation: Precalculated and specified in project plans. What must be summarized on preprinted forms or summary sheets? Answer: Pay items. Explanation: Ensures clarity in billing items. What responsibilities does FDOT management include? Answer: Planning, programming, design, contract administration, contractor payments, design and contract management. Explanation: Highlights breadth of oversight.
Explanation: Holding current Level 2 maintains both qualifications. How long is the Level 2 written exam? Answer: 2 hours. Explanation: Standard exam duration. What minimal passing score is typically required? Answer: 70%. Explanation: FDOT standard for passing Level 2. Name key materials focus in Level 2 regarding asphalt. Answer: Fuel and Bituminous records/adjustments. Explanation: Important for accurate billing and adjustments. What structural documentation skills are part of Level 2? Answer: Estimating and documenting structural elements. Explanation: Ensures final estimates reflect built structures. Which plans are reviewed in Final Estimates training? Answer: Final as-built plans. Explanation: Critical for validating completed work.
Name one non-earthwork pay item area covered in training. Answer: Signalization and highway lighting items. Explanation: Reflects diverse scope beyond grading and asphalt. What essential outcome does Level 2 training aim to provide? Answer: Ability to prepare accurate progress and final estimates timely and accurately. Explanation: Core objective of the qualification