Receiving job instruction and planning equipment use are part of:
a. craft data.
b. job preparation.
c. work factors.
d. leveled time.
b. job preparation
Anticipating other tasks or problems:
a. usually creates additional problems.
b. wastes time.
c. sharply reduces the number
of emergencies.
d. often is not worth the effort.
c sharply reduces the number of emergencies
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35

Partial preview of the text

Download CWEA E/I Grade 2 Exam Questions with Correct Answers| Latest Update 2026/27 and more Exams Water and Wastewater Engineering in PDF only on Docsity!

CWEA E/I 2 Exam Questions with

Correct Answers| Latest Update

Receiving job instruction and planning equipment use are part of: a. craft data. b. job preparation. c. work factors. d. leveled time. b. job preparation Anticipating other tasks or problems: a. usually creates additional problems. b. wastes time. c. sharply reduces the number of emergencies. d. often is not worth the effort. c sharply reduces the number of emergencies

Making job planning a group effort: a. wastes time. b. improves productivity. c. causes confusion. d. All the above b improves productivity Rubber safety gloves should be tested how often? a Every 12 months b. Every 9 months c. Every 6 months d. Every 4 months a Every 12 months Rubber safety blankets should be tested how often? a. Every 6 months b. Every 9 months c. Every 12 months d. Every 18 months b Every 9 months

The relationship between an electric current and a magnetic field is called: a. matter. b. atoms. c. electromagnetism. d. element c electromagnetism Electrons flowing from one place to another make a: a. current. b. track. c. circuit. d. channel a current Between two objects, the development of static charges creates a: a. potential difference.

b. battery. c. thermocouple. d. resistance a potential difference A coil of wire that carries an electric current is called a: a. conductor. b. thermocouple. c. electrocurrent. d. electromagnet d electromagnet Metals are good conductors because they have many: a. insulators. b. free electrons. c. resistors. d. inductors. b free electrons

d. Potential difference d Potential difference A rate of flow of one coulomb per second is called one: a. ampere. b. joule. c. volt. d. olhum. a ampere What is the name for the proportional relationship between potential difference and current? a. Voltage drop b. Voltmeter c. Ampmeter d. Watt meter b Voltmeter What is the unit of measurement for capacitive

reactance? a. Volts b. Ohms c. Amps d. Power factor b Ohms Power companies use AC generators because AC can be sent over long distances: a. at high cost. b. at low cost. c. slower. d. faster. b at low cost What device changes alternating current to a different combination of voltage and current? a. Generator b. Capacitor c. Alternator d. Transformer d Transformer

b. size. c. covering. d. shape. c covering. What kind of starter provides full-voltage starting? a. Across-the-line b. Synchronous start c. Reactor starter d. Reduced-voltage start a Across-the-line The choice between across-the-line starting and reduced-voltage starting depends in part on the size of the: a. starter. b. wire size. c. motor. d. breaker. c motor.

The most important requirement for good maintenance of motor starters is: a. good record keeping. b. safety of personnel. c. proper lubrication. d. clean, dry insulation c proper lubrication A reversing starter reverses a three-phase motor by interchanging: a. main contacts. b. two of the line leads. c. all of the line leads. d. control voltage. b two of the line leads What kind of protection is provided in a manual across-the-line three-phase motor control? a. Overload protection only b. Ground-fault protection only c. Short-circuit protection only

circuit with a resistance of 60 ohms, using Ohm's Law? a. 0.5 amperes b. 2.0 amperes c. 30 amperes d. 10 amperes b 2.0 amperes Solving for I: I = ER Substituting values into the equation: I = 120 volts/60 Ohms = 2 amperes What is the current for a 120-volt circuit with a 1440-watt load? a. 0.083 amperes b. 10 amperes c. 12 amperes d. 15 amperes c 12 amperes Since P = EI, current can be determined as I = P/E Substituting values into the equation: I = 1440 watts /120 volts = 12 amperes

What is the current of a circuit that consumes 625 watts through a 12.75-ohm resistor? a. 3.8 amperes b. 7 amperes c. 49 amperes d. 175 amperes b 7 amperes E = IR and P = EI Substituting the first equation into the second: P = (IR)I P = I Squared x R Solving for I: I Squared = P / R I = SqRt P/R I = SqRt 625/12. I = SqRt 49 I = 7 amps What is the ampere load of a single-phase 1/2 horsepower 115-volt motor, if the motor has an efficiency rating 92% and power factor of 80%? a. 9.5 amperes

and the set point is called the: a. gap. b. error. c. feedback. d. span. b error The signal pressure is usually directly proportional to the process: a. span. b. level. c. variable. d. loop. c variable Offset is the difference between the actual maintained value of the measured variable and: a. the set-point. b. the span. c. zero. d. the level.

a the set-point Another name for built-in error that usually occurs in a proportional control system is: a. deadband. b. offset. c. set point. d. span. b offset An automatic controller always compares a measured variable to: a. zero. b. span. c. reset. d. set point. d set point. The specific value at which an automatic control holds a process variable is called the:

The most commonly used type of diagram in process control is: a. a loop diagram. b. an installation drawing. c. a piping and instrument drawing. d. a location drawing. c a piping and instrument drawing A signal from a measuring device to the controller is called: a. zero. b. correcting. c. span. d. feedback. d feedback. In a closed loop control system, the control process of measuring, comparing, computing and connecting goes on: a. continually.

b. intermittently. c. never. d. whenever the operator takes some action. a continually A control system in which the output is regulated only by changes from outside the process is called: a. open loop. b. closed loop. c. set point. d. measuring. a open loop. A common converter used in process control is the I/P converter, which converts ________ signals to ________ signals. a. zero, span b. analog, digital c. current, pneumatic d. linear, nonlinear c current, pneumatic