A test item analysis worksheet for NRC exam questions. It includes the correct answer, percentage of candidates who answered correctly, and any additional actions taken. The questions covered include topics such as AFW pumps, circuit water pumps, charging pumps, and response to inadequate core cooling.

Typology: Lecture notes

2021/2022

Uploaded on 08/01/2022

hal_s95
hal_s95 🇵🇭

4.4

(655)

10K documents

1 / 8

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
TEST ITEM ANALYSIS WORKSHEET - L091 NRC
1of3
Analysis Results
1 - Poorly Written Question
2 - Excessive Dificulty
3 - Knowledge Weakness
4 - Open Ref Question
5 - Poor Test Taking Skills
6 - Poor Job Validity Question
7 - Outdated/Invalid Question
≤ 50% Requires Analysis
1
DD D 100% 1
2
CC C 100% 2
3
CC C 100% 3
4
AA A 100% 4
5
AA A 100% 5
6
BB B 100% 6
7
BB B 100% 7
8
BB B 100% 8
9
BB B 100% 9
10
BA B 50% 10 SI & Spray logic w/inop channel
11
CC C 100% 11
12
BB B 100% 12
13
DD A 50% 13 CFCU oper from HSDP
14
CC D 50% 14 Spray and Phase B reset
15
BB B 100% 15
16
AA B 50% 16 MFW response to MFP trip
17
BB B 100% 17
18
DD D 100% 18
19
AD C 0% 19 3 - afw pump starts
20
CC C 100% 20
21
DD D 100% 21
22
BB B 100% 22
23
BB B 100% 23
24
DD D 100% 24
25
AA A 100% 25
26
AA A 100% 26
27
BB B 100% 27
28
DD D 100% 28
29
BB B 100% 29
30
AA A 100% 30
31
DD D 100% 31
32
AD A 50% 32 how low SFP level could drain
33
AA A 100% 33
34
BB B 100% 34
35
DD D 100% 35
36
BB B 100% 36
37
AA A 100% 37
38
BA A 0% 38 3 - when to trip CWPs-high DP
39
AA A 100% 39
40
BB B 100% 40
41
CC C 100% 41
42
DD D 100% 42
43
BB B 100% 43
44
CC A 50% 44 basis for thrttling 637/638
45
BB B 100% 45
46
AB A 50% 46 load rej w/ppc control in MAN
47
DD D 100% 47
QUESTION
CORRECT
ANSWER
Charles Bowler (SRO)
Adrion Van Beurden (SR
% CORRECT
QUESTION
pf3
pf4
pf5
pf8

Partial preview of the text

Download Test Item Analysis Worksheet: NRC Exam Questions Analysis and more Lecture notes Logic in PDF only on Docsity!

TEST ITEM ANALYSIS WORKSHEET - L091 NRC

1of

Analysis Results

1 - Poorly Written Question 2 - Excessive Dificulty 3 - Knowledge Weakness 4 - Open Ref Question 5 - Poor Test Taking Skills 6 - Poor Job Validity Question 7 - Outdated/Invalid Question ≤ 50% Requires Analysis 1 D D D 100% 1 2 C C C 100% 2 3 C C C 100% 3 4 A A A 100% 4 5 A A A 100% 5 6 B B B 100% 6 7 B B B 100% 7 8 B B B 100% 8 9 B B B 100% 9 10 B A B 50% 10 SI & Spray logic w/inop channel 11 C C C 100% 11 12 B B B 100% 12 13 D D A 50% 13 CFCU oper from HSDP 14 C C D 50% 14 Spray and Phase B reset 15 B B B 100% 15 16 A A B 50% 16 MFW response to MFP trip 17 B B B 100% 17 18 D D D 100% 18 19 A D C 0% 19 3 - afw pump starts 20 C C C 100% 20 21 D D D 100% 21 22 B B B 100% 22 23 B B B 100% 23 24 D D D 100% 24 25 A A A 100% 25 26 A A A 100% 26 27 B B B 100% 27 28 D D D 100% 28 29 B B B 100% 29 30 A A A 100% 30 31 D D D 100% 31 32 A D A 50% 32 how low SFP level could drain 33 A A A 100% 33 34 B B B 100% 34 35 D D D 100% 35 36 B B B 100% 36 37 A A A 100% 37 38 B A A 0% 38 3 - when to trip CWPs-high DP 39 A A A 100% 39 40 B B B 100% 40 41 C C C 100% 41 42 D D D 100% 42 43 B B B 100% 43 44 C C A 50% 44 basis for thrttling 637/ 45 B B B 100% 45 46 A B A 50% 46 load rej w/ppc control in MAN 47 D D D 100% 47

QUESTION

CORRECT

ANSWER

Charles Bowler (SRO) Adrion Van Beurden (SR

% CORRECT^ QUESTION

TEST ITEM ANALYSIS WORKSHEET - L091 NRC

2of

1 - Poorly Written Question 2 - Excessive Dificulty 3 - Knowledge Weakness 4 - Open Ref Question 5 - Poor Test Taking Skills 6 - Poor Job Validity Question 7 - Outdated/Invalid Question ≤ 50% Requires Analysis

QUESTION

CORRECT

ANSWER

Charles Bowler (SROAdrion Van Beurden

% CORRECT^ QUESTION

48 B B B 100% 48

49 B C B 50% 49 Vital UPS failure 50 A A C 50% 50 EDG caution in 8A 51 C C C 100% 51 52 B B B 100% 52 53 B B B 100% 53 54 B B B 100% 54 55 D D D 100% 55 56 B B B 100% 56 57 A B A 50% 57 rod control dead band 58 C C C 100% 58 59 D D D 100% 59 60 D D D 100% 60 61 B B B 100% 61 62 B B B 100% 62 63 C C C 100% 63 64 D D A 50% 64 shutdwn equip on opp. Trains 65 C A C 50% 65 impact of fail to block MSLP SI 66 C C C 100% 66 67 D D D 100% 67 68 D D D 100% 68 69 C C C 100% 69 70 B B B 100% 70 71 A A A 100% 71 72 D D D 100% 72 73 D D D 100% 73 74 B B B 100% 74 75 D D D 100% 75 89.3% 89.3% #REF! 2

Class Average (RO Exam) Number ≤50% Correct (1-75)

All NRC Written exam questions were reviewed by the Training staff with the

candidates. The following questions were missed by more than 50% of the candidates and

remediated with the candidates. Any additional actions are documented at the end of the

question.

Unit 1 is at 18%. Motor Driven AFW pump 1-2 is out of service.

The operator trips the reactor due to loss of 12 kV bus D.

When the operator checks AFW status, steam generator narrow range levels have

lowered to 58%.

Without operator action, what is the expected status of the AFW pumps and AFW flow

indication?

A. None of the AFW pumps started; no AFW indicated to all four steam generators.

B. Only the Motor Driven AFW pump 1-3 started; AFW indicated to only the 1-

and 1-2 Steam Generators.

C. The Turbine Drive AFW pump and Motor Driven AFW pump 1-3 started; max

AFW indicated to all four steam generators.

D. Only the Turbine Driven AFW pumps started; max AFW indicated to all four

Steam Generators.

Answer: A

Missed by 100% (2 of 2)

  • 1 selected answer C
  • 1 selected answer D

Additional action: none

GIVEN:

  • A LOCA has occurred
  • The crew is performing the actions of E-1, Loss of Reactor or Secondary Coolant
  • No CCW pumps are running
  • The Work Control Lead is reviewing OP AP-11, Malfunction of Component Cooling

Water

  • All ECCS pumps and RCPs are secured due to the loss of cooling
  • Core exit thermocouples are 620°F and rising

Based on a recommendation from the Work Control Lead, the Shift Foreman considers

directing the operator to start Charging Pump 1-3.

What action should be taken by the Shift Foreman regarding starting of the 1-3 Charging

pump?

A. Do not direct the action because it is not a step in E-1.

B. Invoke 50.54x, notify the NRC and then direct the operator to start the pump.

C. Pull a step forward from E-1 forward and then direct the operator to start the 1-

CCP.

D. Direct the operator to start the pump, this is allowed by OP1.DC10, Conduct of

Operations.

Answer: D

Missed by 100% (2 of 2)

2 selected C

Additional action: none.

GIVEN:

  • The crew is performing step 19, Restore Temporary Core Cooling of FR-C.1,

Response to Inadequate Core Cooling

  • Core Exit Thermocouples are 1350°F and rising
  • RCP seal cooling was lost to all RCPs but has been re-established
  • Narrow Range Steam Generator Levels:

o 11 = 35%

o 12 = 50%

o 13 = 5%

o 14 = 0%

Per the guidance of FR-C.1, what action should the Shift Foreman take regarding starting

the RCPs?

A. Wait for an evaluation of the RCP seals to be performed prior to starting any

RCP.

B. Direct the operator to start either the 1-3 or the 1-4 RCP.

C. Direct the operator to start the 1-2 RCP.

D. Direct the operator to start the 1-1 RCP.

Answer: D

Missed by 100% (2 of 2)

1 selected C

1 selecteed B

Additional action: none