The Engineering Research and Analysis (R&A) activities at NASA, the historical funding sources, and the approaches to fund and manage these activities in the future. The document proposes a new approach where each Mission Directorate funds and manages Engineering R&A activities using their existing Programs, and the creation of a Coordination Board to review and prioritize these activities. The document also lists some prioritized Engineering R&A investments.

Typology: Lecture notes

2021/2022

Uploaded on 07/05/2022

allan.dev
allan.dev 🇦🇺

4.5

(86)

1K documents

1 / 9

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
National Aeronautics and
Space Administration
Engineering
Research & Analysis
Dr. Prasun N. Desai
NAC TI&E Committee Meeting
December 5, 2017
pf3
pf4
pf5
pf8
pf9

Partial preview of the text

Download Engineering Research and Analysis Funding and Management at NASA and more Lecture notes Engineering in PDF only on Docsity!

National Aeronautics andSpace Administration

Engineering

Research & Analysis

Dr. Prasun N. Desai NAC TI&E Committee Meeting December 5, 2017

ASIP Action 3.

Action: Work with OCE and the other Mission Directorates to

develop PPBE19 SPG language for formulating engineering

research and analysis activities

  • Action was split into two paths
    • Define a model for funding/managing Engineering Research & Analysis (R&A) at the Agency
    • SPG and PRG guidance development
  • Presentation addresses first aspect for decision, then

subsequently define process for second item

Historical Funding of Engineering R&A

  • Investments have been made and continue to be made in

Engineering R&A, though not always visible and not systematically

nor strategically across the Agency

  • STMD funds Entry System Modeling and Advanced Radiation Protection activities in the Game Changing Program with approximately $9M/year
  • ARMD funds Transformational Tools and Technologies Project with approximately $20M/year in areas of CFD, materials and structures modeling, system analysis tools, and combustion modeling
  • HEOMD funds radiation environments and radiation transport modeling in the Advanced Exploration Systems Program with approximately $1.5M/yr
  • SMD, HEOMD programs/missions fund Engineering R&A for specific missions on an “as needed” basis
  • No sustained investments across all Engineering R&A technical areas

since base funding was eliminated

  • No dedicated path present to fund general Engineering R&A unlike

that for Technology

Approaches to Fund and

Manage Engineering R&A

  • Team considered many possible approaches. Examples:
    • Each Mission Directorate selects, funds, and manages activities separately
    • Each Mission Directorate selects and funds activities separately but management performed by single organization
    • Single Mission Directorate selects and manages all activities
      • Funding is provided through a tax on each Mission Directorate
    • Stand up a dedicated Program
      • Funding is provided through a tax on each Mission Directorate
    • Etc.
  • Discussed advantages/disadvantages of various approaches

Next Steps

  • Flush out next level of details of this approach
    • Number and timing of Board meetings to feed MD PPBE process
    • Leveraging of Center Engineering Director’s perspectives/priorities
    • Coordination with CLTs on list of Engineering R&A activities
    • Integration of Engineering R&A selections within existing Program processes by each MD
    • Identify forum to report out on management/performance/funding of Engineering R&A activities
  • Develop SPG and PRG guidance
    • Initiate execution of this process slowly for PPBE19 with goal to attain sustained ”steady-state” level in years thereafter

Back Up