GCSS-Army ERPS's Course Test 1, Exams of Advanced Education

GCSS-Army ERPS's Course Test 1

Typology: Exams

2024/2025

Available from 03/22/2025

solution-master
solution-master 🇺🇸

3.2

(27)

11K documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
GCSS-Army ERPS's Course Test 1
1. A __________ is a GCSS-Army component that represents a particular Army Unit, logistics
element, or cost capturing entity. - a. Force Element (FE)
2. Which transaction code (T-Code) is used to display a Unit's Organizational structure?
(Force Element, Storage Location, Property, Personnel, and what a unit is allowed to request)
- c. /n/ISDFPS/LSP2
3. Which transaction code (T-Code) is used to identify the details associated with a DoDAAC,
MRP area, Storage Location, and supporting supply organization. - d. ZFE
4. True or False? A Technical Status is set by the User to identify the severity of a notification
(fault or shortcoming) for a piece of equipment. - a. True
5. Which operational status symbol is used to indicate the equipment non-mission due to a
maintenance requirement? - c. Red Flag
6. Work orders are created and managed from the Equipment Situation Report. Which of the
following represents a refurbishment order? - b. PM04
7. True or False? A functional location structure is a hierarchical structure representation of a
system/sub-system/end item. - a. True
8. Using the Functional Location Structure example below; which equipment is currently
NOT installed into the Functional Location Structure? - d. The transmission
9. Which notification type is used to create a one-time individual equipment dispatch? - b.
D1
10. Which transaction is used to display the workflow message indicating the approval
authority's equipment dispatch request decision? - d. SBWP
pf2

Partial preview of the text

Download GCSS-Army ERPS's Course Test 1 and more Exams Advanced Education in PDF only on Docsity!

GCSS-Army ERPS's Course Test 1

  1. A __________ is a GCSS-Army component that represents a particular Army Unit, logistics element, or cost capturing entity. - a. Force Element (FE)
  2. Which transaction code (T-Code) is used to display a Unit's Organizational structure? (Force Element, Storage Location, Property, Personnel, and what a unit is allowed to request)
  • c. /n/ISDFPS/LSP
  1. Which transaction code (T-Code) is used to identify the details associated with a DoDAAC, MRP area, Storage Location, and supporting supply organization. - d. ZFE
  2. True or False? A Technical Status is set by the User to identify the severity of a notification (fault or shortcoming) for a piece of equipment. - a. True
  3. Which operational status symbol is used to indicate the equipment non-mission due to a maintenance requirement? - c. Red Flag
  4. Work orders are created and managed from the Equipment Situation Report. Which of the following represents a refurbishment order? - b. PM
  5. True or False? A functional location structure is a hierarchical structure representation of a system/sub-system/end item. - a. True
  6. Using the Functional Location Structure example below; which equipment is currently NOT installed into the Functional Location Structure? - d. The transmission
  7. Which notification type is used to create a one-time individual equipment dispatch? - b. D
  8. Which transaction is used to display the workflow message indicating the approval authority's equipment dispatch request decision? - d. SBWP
  1. Which transaction code (T-Code) is used to create a project work order? - d. IW
  2. Which of the following work centers is never entered in the Main Work Ctr field of a work order? - d. A Commodity Shop work center being assigned work
  3. What triggers the dismantle/install process? - c. Goods movement for a work order
  4. After the technical completion button in the overall completion process is selected, how is the operational status updated? - c. The Set User Status dialog box prompts the User to update the operational status
  5. General maintenance task lists define which requirement for a maintenance task or activity? - c. Both A & B
  6. True or False? The Service schedule displays the date in which the maintenance call was completed as well as the maintenance calls that are due for processing? - a. True
  7. Which aging indicator displays in the Recoverable/Reparable Conversion by Material (YOBUX) transaction if the return (ZRL or ZRX) PR is 15 days olds? - b. Yellow
  8. True or False? When executing the MI24 transaction, you are in search of open active inventories. - a. True
  9. Which Action, Reference Document, and Movement Type posting selections are used to post goods issue bench stock material to a Unit's Cost Center? - a. A07 Goods Issue, R Other, and 201
  10. Which of the following items are not displayed in the Order Status Report? - d. The mode of shipment