Download integration final project and more Essays (university) Civil Engineering in PDF only on Docsity!
Ys aa a a] S| & = —‘\ J —- oO Lt SN - 2] oO + s q nN ee) = - < S| + Z) a S| St — ° a & “7 —\—\ 99 161 121 131 410 AO] 120 20 | 90 }40 b \J 2425 | 325 L | 481 481 481 | 481 | 481 335 l Zo 461 mo 461 461 io. 461 nm 461 he 326 l 120 121 219 124 121 219 121 121 219 121 121 219 121 79 121 99 121 80 325 120 100mm thick Dressed Stone Pavement with 40: -0.30 water collector ditch W2 +0.01 120 Iron Gril down pipe HCB pillar. GENERAL STORAG AREA =39.6msq, 762 RECORD OFFICE AREA =44.3msq Wi down’pipe 100mm thick| Dressed Stone Pavement with 40cm water collector ditch 120 | 160 3 We cantilever projection W2 GENERAL be VICE HEAD AREA319.4 CORRIDOR AREA =25.2msq 492 AREAE25.6msq FINANCE OFFICE | Sanitary unit TW. down pipe 3-1 222 Wwe EA =4.7msq WC EA=4.7msq TELE |PABX 4-4 SERVER ROQM letrical duct JANITOR AREA=9.4msq AREA=9.3msq 91 0 91 130 fire protection duct D2 fire extengusher LOBBY AREA=24.5msq D2 91 ZN MAIN ENTRANCE +0.00 4 -0.30 We HCB pillar. down pipe 3 41domm thick Dressed Stone Pavement with 40cm water collector ditch down pipe 9 Steps 17780 (0 130 130 130 130. 30 130 130130130 oO down pipe -690- 326 100mm thick Dressed Stone Pavement with 40cm water collector ditch Iron Grill | 326 120 AO 181 161 121 219 121 121 219 121 121 219 121 160 161 159 40 1 7 461 1 20. 461 1 1 461 1 tg 1 461 1 44 1 461 1 20 325 1 14 4 41 ft 41 411 1 481 481 481 481 481 335 4 2425 325 f rf 1 GROUND FLOOR PLAN (Cold temprate) Sc.1:50 90 40 381 Ad 541 120 LEGEND: FINISHING SCHEDULE 41 - FLOOR FINISHING 1.1 - Cement Screed with glass crack protection 1.2 - Terrazzo Tiles 2 - WALL FINISHING 2.1 - Plastered and Painted 2.2 - Plastered and oil Painted 2.3 - Ceramic tiles up to 180cm, plastered and oil painted above 2.4- Ceramic tiles up to 45cm, plastered and oil painted above 2.5- Pointed and painted 3 - CEILING FINISHING 3.1 - Plastered & painted 3.2 - Chipwood ceiling 4-SKIRTING 4.1 - =~ SPOT HEIGHTS OF BUILDINGS: 2 3S = - oO v A | Tender 31.08.06 gS NO. REVISION DATE SIGN 2 UCBP XX-AR-DA-T2-2-EP-001-A PROJECT IMPLEMENTING AGENCY gtz’ P.0. Box 28127, Code 1000 Bole Road, Boston Building, 5th Floor Addis Ababa, Ethiopia 3 Tel: +251-011-662 22 60 3 Fax: +251-011-662 41 14 E-Mail:
[email protected] 120 DESIGNED BY: MH ENGINEERING P.L.C. CONSULTING ENGINEERS AND ARCHITECTS Tel.: 633080, 633080 P.O.Box 1553 Addis Ababa - Ethiopia Fax: 627768, e-mail:
[email protected] IN ASSOCIATION WITH: - Geretta Consult / - BET Consulting Architects/ UNIVERSAL Consult - Abba Architects / CLIENT: MINISTRY OF EDUCATION PROJECT: U Cc B P University Capacity ™ Building Programme Type 2 HT COLD TEMPERATE SECOND PHASE LOCATION: AX,DB,DM,DS,KB,RO,SO EARTHQUAKE ZONE: ZONE 0/1/4 CLIMATE: COLD TEMPERATE DRAWING TITLE: DA-TYPE 2 Ground Floor Plan Date of Issue: [Date of Revision:] Category: 31.08.2006 | Y.T 1:50 31.08.2006 AR Drawn by: | Scale: Drawing Number: Index: XX-AR-DA-T2-2-EP-001-A A