integration final project, Essays (university) of Civil Engineering

integration final project hope and hope

Typology: Essays (university)

2020/2021

Uploaded on 03/22/2021

ldy-entertainment
ldy-entertainment 🇲🇦

5 documents

1 / 10

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download integration final project and more Essays (university) Civil Engineering in PDF only on Docsity!

Ys aa a a] S| & = —‘\ J —- oO Lt SN - 2] oO + s q nN ee) = - < S| + Z) a S| St — ° a & “7 —\—\ 99 161 121 131 410 AO] 120 20 | 90 }40 b \J 2425 | 325 L | 481 481 481 | 481 | 481 335 l Zo 461 mo 461 461 io. 461 nm 461 he 326 l 120 121 219 124 121 219 121 121 219 121 121 219 121 79 121 99 121 80 325 120 100mm thick Dressed Stone Pavement with 40: -0.30 water collector ditch W2 +0.01 120 Iron Gril down pipe HCB pillar. GENERAL STORAG AREA =39.6msq, 762 RECORD OFFICE AREA =44.3msq Wi down’pipe 100mm thick| Dressed Stone Pavement with 40cm water collector ditch 120 | 160 3 We cantilever projection W2 GENERAL be VICE HEAD AREA319.4 CORRIDOR AREA =25.2msq 492 AREAE25.6msq FINANCE OFFICE | Sanitary unit TW. down pipe 3-1 222 Wwe EA =4.7msq WC EA=4.7msq TELE |PABX 4-4 SERVER ROQM letrical duct JANITOR AREA=9.4msq AREA=9.3msq 91 0 91 130 fire protection duct D2 fire extengusher LOBBY AREA=24.5msq D2 91 ZN MAIN ENTRANCE +0.00 4 -0.30 We HCB pillar. down pipe 3 41domm thick Dressed Stone Pavement with 40cm water collector ditch down pipe 9 Steps 17780 (0 130 130 130 130. 30 130 130130130 oO down pipe -690- 326 100mm thick Dressed Stone Pavement with 40cm water collector ditch Iron Grill | 326 120 AO 181 161 121 219 121 121 219 121 121 219 121 160 161 159 40 1 7 461 1 20. 461 1 1 461 1 tg 1 461 1 44 1 461 1 20 325 1 14 4 41 ft 41 411 1 481 481 481 481 481 335 4 2425 325 f rf 1 GROUND FLOOR PLAN (Cold temprate) Sc.1:50 90 40 381 Ad 541 120 LEGEND: FINISHING SCHEDULE 41 - FLOOR FINISHING 1.1 - Cement Screed with glass crack protection 1.2 - Terrazzo Tiles 2 - WALL FINISHING 2.1 - Plastered and Painted 2.2 - Plastered and oil Painted 2.3 - Ceramic tiles up to 180cm, plastered and oil painted above 2.4- Ceramic tiles up to 45cm, plastered and oil painted above 2.5- Pointed and painted 3 - CEILING FINISHING 3.1 - Plastered & painted 3.2 - Chipwood ceiling 4-SKIRTING 4.1 - =~ SPOT HEIGHTS OF BUILDINGS: 2 3S = - oO v A | Tender 31.08.06 gS NO. REVISION DATE SIGN 2 UCBP XX-AR-DA-T2-2-EP-001-A PROJECT IMPLEMENTING AGENCY gtz’ P.0. Box 28127, Code 1000 Bole Road, Boston Building, 5th Floor Addis Ababa, Ethiopia 3 Tel: +251-011-662 22 60 3 Fax: +251-011-662 41 14 E-Mail: [email protected] 120 DESIGNED BY: MH ENGINEERING P.L.C. CONSULTING ENGINEERS AND ARCHITECTS Tel.: 633080, 633080 P.O.Box 1553 Addis Ababa - Ethiopia Fax: 627768, e-mail: [email protected] IN ASSOCIATION WITH: - Geretta Consult / - BET Consulting Architects/ UNIVERSAL Consult - Abba Architects / CLIENT: MINISTRY OF EDUCATION PROJECT: U Cc B P University Capacity ™ Building Programme Type 2 HT COLD TEMPERATE SECOND PHASE LOCATION: AX,DB,DM,DS,KB,RO,SO EARTHQUAKE ZONE: ZONE 0/1/4 CLIMATE: COLD TEMPERATE DRAWING TITLE: DA-TYPE 2 Ground Floor Plan Date of Issue: [Date of Revision:] Category: 31.08.2006 | Y.T 1:50 31.08.2006 AR Drawn by: | Scale: Drawing Number: Index: XX-AR-DA-T2-2-EP-001-A A