A detailed analysis of traffic signal timing at an intersection, focusing on optimizing signal phases and cycle lengths to improve traffic flow. It includes calculations for saturation flow rates, lane utilization, and adjustments for heavy vehicles, pedestrians, and parking. The analysis uses various formulas to determine effective green times, delay, and level of service (los) for different lane groups and approaches. The document also considers permitted left and right turns, pedestrian crossing times, and bicycle volumes to provide a comprehensive evaluation of intersection performance. This analysis is crucial for traffic engineers to design efficient and safe intersections. (409 characters)
Typology: Exercises
1 / 16
This page cannot be seen from the preview
Don't miss anything!










◙ CBD Other Ancho de carril EB 3.3 (^) 4.5 4. WB 3. NB 4.5 grade= 0% SB 4. grade= 0% 3.3 100 20 3. 3.3 100 20 3. grade= 0% grade= 0% 4.5 4. LT TH RT¹ LT TH RT¹ LT TH RT¹ LT TH RT¹ 65 620 35 30 700 20 30 370 20 40 510 50 5 5 5 5 5 5 8 8 8 8 8 8 0.900 0.900 0.900 0. P P P P 4 2 3 3 Ø 1 Ø 2 G = 26.00 G = 36. Y = 4.00 Y = 4.
Volume and Timing Input
Cycle legth (s) =
Timing (^) Y = 0.00 Y = 0.00 Y = 0.00 Y = 0.00 Y = 0.00 Y = 0.
Signal Phasing Plan D I A G R A M
Crosswalk length L (m) 9.00^ 9.00^ 13.20^ 13. Min. timing for pedestrians,3 Gp (s) 11.2 11.2 14.7 14. Bus stopping. NB (buses/h) 0 0 0 0 Number of pedestrians crossing, Nped (p) 2 2 2 2 Parking (Y or N) N N N N Parking maneuvers, Nm (maneuvers/h) 0 0 0 0
Approach bicycle volume. Vbic (bicycles/h) 20 20 20 20 Extension of effective green tlme, e (s) Arrival ripe, AT Approach pedestrian volume,2 Vped (p/h) 100 100 100
Volume. V (veh/h) % heavy vehicle, % HV Peak- hour factor. PHF Pretimed (P) or actuated (A) Start-up lost time, I 1 (s) 100 NB
Analysis Time Period Andysis Yea Intersection Geometry SB 20 20 WB 100 Analyst Intersection Agency or Company Area Type Date Performed Jurisdiction
General Information Site Information 𝑁ௗ = 𝑉ௗ 3600 ∗^ 𝐶 𝐺 = 3.2 + (^) 𝑆𝐿 + 0.81 𝑁 𝑊ௗா 𝑃𝑎𝑟𝑎 𝑊ா > 3.0𝑚 𝐺 = 3.2 + (^) ௌು + 0.27𝑁ௗ 𝑃𝑎𝑟𝑎 𝑊ா ≤ 3.0𝑚
EB WB NB SB Cycle length, C (s) 70 70 Total actual green time for LT lane group, G (s) 26 26 Effective permitted green time for LT lane group, g (s) 26 26 Opposing effective green time, go (s) 26 26 Number of lanes in LT lane group, N 2 2 Number of lanes in opposing approach, No 2 2 Adjusted LT flow rate, VLT (veh/h) 72 33 Proportion of LT volume in LT lane group, PLT 0.090 0. Adjusted flow rate in lane group, V (Veh/h) 800 833 Adjusted flow rate for opposing approach, Vo (veh/h) 833 800 Lost time for LT lane group, tL 4 4 LT volume per cycle, LTC 1.400 0. Lane utilization adjustment factor, fLU 0.950 0. Opposing lane utilization factor, fLUo 0.950 0. Opposing flow per lane, per cycle Volc (veh/C/ln) 8.525 8. Tiempo hasta la llegada del primer vehículo que gira a la izquierda. gf 4.461 9. Platoon ratio, Rp (Tabla 16-11) 1.333 0. Opposing platoon ratio, Rpo 0.667^ 1. Opposing queue ratio, qro 0.752 0. 11.312 8. gu = g – gq if gq ≥ gf, or gu = g – gf if gq < gf 14.688 16. Effective Opposing Flow, Voe 877.000 842. EL1 se interpola para poder sacar este valor 3.3 3. 0.268 0. fmin = 2(1 + PL)/g 0.098 0. 0.521 0. Para giros a la derecha permitidos en varios carriles fLT=fm 0.716 0. Computation
Input LTC = 𝑉் 𝐶 3600 𝑉 = 𝑉𝐶 3600 𝑁𝑓 𝑔𝑓 = 𝐺𝑒 ି^.^ ଶ଼଼்^ బ.ళభళ − 𝑡 SI 𝑔 ≤ 𝑔 Para Carriles exclusivos para giros a la izquierda 𝑔𝑓 = 0 𝑞𝑟 = max 1 − 𝑅 𝑔 𝐶 , 0
𝑜
బ.లమవ
EB WB NB SB
EB WB NB SB
c = 𝑆
ଶ