Download IV Start - Medication Administration. and more Study notes Medicine in PDF only on Docsity!
lOMoAR cPSD| 30970899
IV Start - Medication
Administration
1 st^ Medication Check
Check PCP orders Use Chart (EMR) & Medication Record (MAR)
- Right medication
- Right dose
- Right time
- Right route
- Right patient
- Right documentation Assess allergies Use the EMR Gather supplies IV kit angiokit (20ga & 22ga) Medication label Tape saline flush X2 alcohol pads Primary tubing Medications Dosage Calculation IV Push – need to read off the label and convert IV Piggyback- need to know the ggt factor to figure the ggt rate Hand Hygiene
2 nd^ Medication Check
Prepare Medications for Administration
- Right medication
- Right dose
- Right time
- Right route
- Right patient
- Right documentation Check expiration dates Draw up medications
- IV Push
- Clean the vial with an alcohol pad 30 seconds
- Connect needle and syringe
- Pull the syringe back with the amount of air for the solution
- Inject the air into the vial
- Invert the vial
- Withdrawl the amount of medication ordered
- Use the safety device for the needle
- Label the medication with: Name, mg/ml, Date, Time Intravenous
3 rd^ medication
check
- Right medication
- Right dose
- Right time
- Right route
- Right patient
- Right documentation
- Allergies have been checked and medication has not expired
- Explain the medication: o Why is medication giveno How long it will take to be effective o Nursing considerations o Safety o Contraindications
- Hand sanitizer
- Place on clean gloves
- Remove NS flush
- Attach medication and administer
- Flush the IC line with 1-3 cc NS afterwards
Intravenous Piggyback
3 rd^ Medication
check
- Right medication
- Right dose
- Right time
- Right route
- Right patient
- Right documentation
- Allergies have been checked and medication has not expired
- The prescribed medication is compatible with continuous IVF
- Connect IV solution (medication) to IV secondary tubing
- Slide roller clamp 2 inches below the drip chamber and roll the clamp closed
- Pull off the cover from the port on the IV medication
- Insert the spike into the port using a sterile technique
- Squeeze the drip chamber and fill half-full
- Prime the tubing with solution
- Remove cap on the end of the tubing (maintain sterility)
- Slowly open the clamp
- Prime the tubing with solution
- Replace cap on tubing
- Clean the injection port with alcohol swab for 30 seconds
- Connect IVP tubing to maintenance IV tubing
Post-procedure
Ask Pain level Can I get you anything before I leave Perform 1. Lower the bed to the lowest position
- Ensure 3 side rales are up
- Put the call bell within reach
- Perform Hand hygiene Say Let the patient know when you will be back I am going to document the medication administration