What materials qualify as "biobased" in LEED v4? - correct answer ✔✔Materials
meeting the criteria of the Sustainable Agriculture Standard.
In LEED v4 Biobased materials are no longer defined by the harvest cycle of the raw
materials; instead, products must meet the Sustainable Agriculture Standard to
count toward certain materials and resources (MR) credits.
Which of the following materials contains pre-consumer content? - correct answer
✔✔Manufacturer overrun print publications that are converted to recycled paper.
Pre-consumer recycled content materials are generated by manufacturers and
processors, and may consist of scrap, trimmings and other by-products that were
never used in the consumer market. Examples include planer shavings, sawdust,
bagasse, walnut shells, culls, trimmed materials, overissue publications, and
obsolete inventories. The designation excludes rework, regrind, or scrap materials
capable of being reclaimed within the same process that generated them. Formerly
known as postindustrial content.
What is Albedo? - correct answer ✔✔The reflectivity of a material.
Albedo is defined as the ability of a surface to reflect sunlight, or the reflectivity, of
a material.
"Graywater" can be reused for which of the following purposes? - correct answer
✔✔Toilet flushing, cooling towers and irrigation.
Graywater is defined as "untreated household waste water which has not come into
contact with toilet waste." Graywater includes used water from bathtubs, showers,
bathroom wash basins, and water from clothes-washers and laundry tubs. It must
not include waste water from kitchen sinks or dishwashers.
Which of the following is NOT required for a project to become LEED certified? -
correct answer ✔✔On site visit from a GBCI representative prior to certification.
On site visit by representatives from USGBC and/or GBCI is not part of the LEED
Certification process.
pf3
pf4

Partial preview of the text

Download LEED Green Associate Certification and more Exams Advanced Education in PDF only on Docsity!

LEED Green Associate Certification

What materials qualify as "biobased" in LEED v4? - correct answer ✔✔Materials meeting the criteria of the Sustainable Agriculture Standard. In LEED v4 Biobased materials are no longer defined by the harvest cycle of the raw materials; instead, products must meet the Sustainable Agriculture Standard to count toward certain materials and resources (MR) credits. Which of the following materials contains pre-consumer content? - correct answer ✔✔Manufacturer overrun print publications that are converted to recycled paper. Pre-consumer recycled content materials are generated by manufacturers and processors, and may consist of scrap, trimmings and other by-products that were never used in the consumer market. Examples include planer shavings, sawdust, bagasse, walnut shells, culls, trimmed materials, overissue publications, and obsolete inventories. The designation excludes rework, regrind, or scrap materials capable of being reclaimed within the same process that generated them. Formerly known as postindustrial content. What is Albedo? - correct answer ✔✔The reflectivity of a material. Albedo is defined as the ability of a surface to reflect sunlight, or the reflectivity, of a material. "Graywater" can be reused for which of the following purposes? - correct answer ✔✔Toilet flushing, cooling towers and irrigation. Graywater is defined as "untreated household waste water which has not come into contact with toilet waste." Graywater includes used water from bathtubs, showers, bathroom wash basins, and water from clothes-washers and laundry tubs. It must not include waste water from kitchen sinks or dishwashers. Which of the following is NOT required for a project to become LEED certified? - correct answer ✔✔On site visit from a GBCI representative prior to certification. On site visit by representatives from USGBC and/or GBCI is not part of the LEED Certification process.

What are some of the requirements for a project to become LEED certified? - correct answer ✔✔- Fundamental commissioning of the building's energy systems.

  • The use of a reasonable site boundary.
  • Commitment to sharing whole building energy water data. LEED Regional Priority credits are determined by: - correct answer ✔✔USGBC regional chapters. Regional Priority credits are determined by volunteers from local USGBC chapters and the LEED International Roundtable. A project team is planning a 14 story, 200 unit apartment building in New York City. The project team wants to attempt LEED certification. Which rating system should the project use? - correct answer ✔✔LEED for New Construction. The project team should use LEED BD+C for New Construction. If a team seeks guidance on which rating system to use, the team should employ the 40/60 rule for making a decision on which rating system to use. What is Light Pollution? - correct answer ✔✔Light pollution is wasted light that produces glare or is directed up toward the sky or away from the building where it should be focused. What is "bioremediation"? - correct answer ✔✔The use of living organisms to remove pollutants from water. Bioremediation is the use of living organisms to remove pollutants from contaminated sites and water. How is the "baseline" defined in LEED? - correct answer ✔✔The amount of energy or water the building would consume if it was designed using conventional practices. The baseline is the amount of energy or water the building would consume if it used traditional practices and materials. Energy baselines are based on ASHRAE 90.1- 2010 and the water baseline from Environmental Protection Agency (EPA) Standards. Roof-mounted solar photovoltaic panels on the project site can contribute to which credits in LEED v4? - correct answer ✔✔Renewable Energy and Heat Island Reduction.

A 750 square foot LEED v4 BD+C New Construction project is attempting to earn 80 points. What LEED Certification level will it earn? - correct answer ✔✔The project cannot be certified. LEED BD+C projects must be a minimum of 1,000 sq ft according to the rating system's Minimum Program Requirements (MPRs) in LEED v4. The calculation for recycled content in a building material is based on: - correct answer ✔✔Weight. The calculation for the total recycled content in a LEED project is based on: - correct answer ✔✔Total Cost. The combination of reflectance and emittance is known as: - correct answer ✔✔Solar Reflectance Index (SRI). SRI is a gauge from 0-100, with 0 being most likely to absorb and radiate heat (such as a tar roof) and 100 being the most reflective (least likely to get hot) such as a "cool roof". What's a cool roof? - correct answer ✔✔A roof painted with white reflective paint. Which rating system requires an on-site evaluation by a Green Rater prior to certification? - correct answer ✔✔LEED for Homes