LEVEL 4 MODULE 4 BUILDING MANAGEMENT SYSTEMS EXAM 2026 OFFICIAL QUESTIONS AND ANSWER KEY, Exams of Building Materials and Systems

LEVEL 4 MODULE 4 BUILDING MANAGEMENT SYSTEMS EXAM 2026 OFFICIAL QUESTIONS AND ANSWER KEY (UPDATED).

Typology: Exams

2025/2026

Available from 03/14/2026

N-U-R-S-E
N-U-R-S-E 🇺🇸

3.2

(9)

7.3K documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
P a g e | 1
LEVEL 4 MODULE 4 BUILDING
MANAGEMENT SYSTEMS EXAM 2026
OFFICIAL QUESTIONS AND ANSWER KEY
(UPDATED).
1. Which type of control module uses inputs from one or more
power meters to track bilding energy consumption? - correct
answer -Load-shed
2. When a DDC control system is used, the occupancy period
control is found in the - correct answer -zone controller
3. An energy-saving routine used with VAV systems that is active
in the unoccupied hours of the early morning is called the -
correct answer -night-time free cooling
4. VAV systems are capable of controlling indoor air quality (IAQ)
at the zone level by employing a control strategy called -
correct answer -demand-controlled ventilation
pf3
pf4

Partial preview of the text

Download LEVEL 4 MODULE 4 BUILDING MANAGEMENT SYSTEMS EXAM 2026 OFFICIAL QUESTIONS AND ANSWER KEY and more Exams Building Materials and Systems in PDF only on Docsity!

LEVEL 4 MODULE 4 BUILDING

MANAGEMENT SYSTEMS EXAM 2026

OFFICIAL QUESTIONS AND ANSWER KEY

(UPDATED).

  1. Which type of control module uses inputs from one or more power meters to track bilding energy consumption? - correct answer - Load-shed
  2. When a DDC control system is used, the occupancy period control is found in the - correct answer - zone controller
  3. An energy-saving routine used with VAV systems that is active in the unoccupied hours of the early morning is called the - correct answer - night-time free cooling
  4. VAV systems are capable of controlling indoor air quality (IAQ) at the zone level by employing a control strategy called - correct answer - demand-controlled ventilation
  1. To manage building pressurization, the central unit is often equipped with a - correct answer - Powered exhaust fan
  2. the seven-layer communication protocol that allows efficient operation of BMS controllers is called - correct answer - LonTalk
  3. The term interoperability refers to - correct answer - The transfer of information and commands across building systems and different protocols
  4. LonWorks can best be described as - correct answer - A DDC network
  5. Although wireless devices can significantly reduce installation costs, one of the primary problems associated with their use is
    • correct answer - the broadcast range
  6. The control point classification of a sensor used to measure the status of a pressure switch is - correct answer - Discrete input (DI)
  1. A digital controller installed on a packaged rooftop unit at the factory is called a - correct answer - product-integrated controller
  2. In a chilled-water system, the temperature of the water leaving the chiller is typically maintaned at - correct answer - 45f
  3. A BMS user interface that links two or more building client computers to a server computer is called a - correct answer - LAN
  4. Which BMS control computer front-end software function operates to provide system operators with information about monthly trends in system temperatures and pressures or energy usage? - correct answer - Data collection
  5. Which BMS-connected computer front end software function operates to collect and store files from all the controllers on a network? - correct answer - Database managment