Lineman Apprentice Service Installation test
questions
- 1-1. Circle the correct answer that completes the following sentence. Service connectors come in different sizes to accommodate different sized . a) hydraulic tools b) bolts c)conductors d) services: c) conductors
- 1-2. Circle the correct answer. Which of the following are commonly used conductor materials? a) Aluminum b) Steel c)Copper d) Porcelain e) Only a and b f) Only a and c g) Only c and d: f) Only a and c
- 1-3. Circle the correct answer. Which of the following is referred to as a 'mechanical' connector? a) Single bolt b) Groove bolt c)Split bolt d) All of the above e) Only a and b f) Only a and c: f) Only a and c
- 1-4. True or False.
2 / Compression connections generally do not loosen after a period of time, and compression connectors may be removed and used again and again.: False
- 1-5. True or False. In general, compression connectors and mechanical connectors may be used interchangeably to make service connections.: False
- 1-6. Circle the correct answer. Which of the following most accurately describes a wedge connector? a) The C-body produces a spring tension maintaining the connector pressure b) The reversible wedge can be used one direction for aluminum, the other for copper c)The bolt on the C-body ensures the wedge does not loosen after installation d)The spring wedge actuator is compressed with a special tool: a) The C- body produces a spring tension maintaining the connector pressure
- 2-1. Circle the correct answer. Which of the following is NOT a factor in deciding the type of connector to use when making a service connection? a) Application b) Wire size c)Wire type d) Secondary voltage: d) Secondary voltage
- 2-2. True or False. When a copper wire comes in contact with an aluminum wire, a chemical reaction can occur that can corrode the aluminum wire.: True
- 2-3. Circle the correct answer that completes the following sentence. wire is brushed until it is shiny. a) Copper b) Aluminum c)Insulated
4 / end wedge to prevent slipping b) Check the load terminals on the meter base for load or ground continuity c)Install two meter seals for reinforced protection d) Cover the connectors to protect from accidental contact: d) Cover the connectors to protect from accidental contact
- 3-1 True or false A Service installation job site is generally looked over before a job is started to determine the best approach for the installation.: True
- 3-2 True or False A service should not be installed and energized directly to a load.: True
- 3-3 Circle the correct answer. In the video example, why was a handline used to raise the service wires to the weatherhead? a) To allow the worker to climb the ladder with both hands free for safety. b)Because the worker was not strong enough to bring the service up with him. c)It's a choice depending on the experience of the worker. d) The weatherhead was too high to reach from the roof.: a) To allow the worker to climb the ladder with both hands free for safety.
- 3-4 Circle the correct answer. Why were the service wires in the video example shaped into drip loops? a) To prevent rain water from following the conductor into the weatherhead. b) To keep birds from building nests in the weatherhead. c)To allow extra conductor in case they have to be cut later. d) To make it easier to squeeze the connectors on.: a) To prevent rain water from following the conductor into the weatherhead.
- 3-5 Circle the correct answer that completes the following sentence. When service
5 / wires are connceted, is always connected first. a) The neutral, then the hot legs. b) One hot leg to test for shorts, the neutral, then the last hot leg. c)The neutral, then the hot leg on the right side of the meter base. d) None of these are correct.: a) The neutral, then the hot legs.
- 4-1 Circle the correct answer that completes the following sentence. is often used to protect a service where it comes out of the ground to a customer's meter box. a) A type SE cable using a weather resistant sheath. b) A dog. c)A riser or service pipe, sometimes called a guard pipe. d) A guy guard placed over the wire.: c) A riser or service pipe, sometimes called a guard pipe.
- 4-2 True or False. It is possible for voltage to be present at a meter box before residential service is connected to it.: True.
- 4-3 Circle the correct answer. Which of the following is the BEST reason to cover and tamp the UG service cable trench before making connections? a) If the cable terminations are made first, movement or strain on the cable during backfill could put a hazardous strain on the terminations in the meter base. b) Dirt fill helps to cool the cable for the current flow, minimizing resistance. c)The backfill acts as insulation, protecting the public and pets from electrical exposure. d) If the dirt is filled after connections are made, the digging equipment may fall in the trench.: a) If the cable terminations are made first, movement or strain on the cable during backfill could put a hazardous strain on the terminations in the meter base.
- 4-4 Circle the correct answer that completes the following sentence.
7 / c)Check that there is 120 volts from line-to-load on both sides. d) Check the meter switch on the of the meter for continuity.: b) Check that there is isolation between each hot leg terminal and ground.
- 5-3 Circle the correct answer. Which of the following is the BEST action to take if voltmeter tests indicate a load is connected in the house and no one is home? a) If there is a Main outside, open the Main, set the meter, and leave a note for the homeowner about the issue. Never set a meter on a load with no outside Main to open. b) If the meter check shows load is equal on both sides, the load is probably a range, gas water heater, or AC. Set the meter and check the AC. If it comes on, there is no risk. c)Customers know you are coming and are unlikely to leave things on the stove. The load is probably AC or water they need when they get home. Set the meter. d) Leave the meter on the ground with an extra seal, the customer will know how to set the meter.: a) If there is a Main outside, open the Main, set the meter, and leave a note for the homeowner about the issue. Never set a meter on a load with no outside Main to open.
- 5-4 Circle the correct answer. In a typical meter base, how many terminals are energized on the line side? a) 3 b) 2 c) 1 d) None of the above: b) 2
- 5-5 True or False. Customer back feed voltage checks are always made at the load terminals and the neutral terminal.: True.
- 5-6 Circle the correct answer that completes the following question. A voltage check between the left line terminal and the left load terminal will show whether there is a jumper in the load circuit.
8 / If there is a jumper, the voltage tester should indicate about volts. a) 0 b) 120 c) 240 d) None of these are correct.: c) 240
- 6-1 Circle the correct answer. What is the main difference between installing a single-phase service and installing a three-phase service? a) There are eight sockets to plug into a three-phase service. b) The rotation or phase sequence must be checked. c)There are two extra wires to connect to. d)Two employees should always be present when setting three-phase meters.- : b) The rotation or phase sequence must be checked.
- 6-2 Circle the correct answer. In the video demonstration, why was the phase sequence checked at the weatherhead instead of at the transformers? a) The transformer connections were too large. b) The transformer connections were too high. c)The weatherhead provided an easier way to switch phase if the phase sequence was incorrect. d) The weatherhead was shorter, so the wires could be raised to get the proper phase sequence.: c) The weatherhead provided an easier way to switch phase if the phase sequence was incorrect.
- 6-3 Circle the correct answer. In the video demonstration, what did the crew do to protect the ends of the new service at the weatherhead, once the transformer was energized? a) Squeezed connectors on the ends. b) Taped the conductors together to ensure continuity. c)Taped the ends of each condutor to protect once energized.
10 / b) blankets and line hose. c)insulated conductor sheets. d) Line hose and insulator hoods.: b) blankets and line hose.
- 7-3 Circle the correct answer that completes the following sentence. In the video example, a was used to pull up the slack in the service, to ensure that it had the proper sag. a) Set of rope blocks. b) Handline. c)Hoist. d) Truck winch.: c) Hoist.
- 7-4 True or False. As the phase connections in the example were made, only the connection being worked on was uncovered.: True.
- 7-5 Circle the correct answer that completes the following sentence. In the video example, the lineworker had to the new service phases to the existing service phases to avoid a phase-to-phase short. a) Unwind. b) Wind and tape. c)Match. d) Sag.: c) Match.
- 7-6 Circle the correct answer that completes the following sentence. In the video example, a voltage reading of volts indicated properly matched phases. a) 240 b) 208 c) 120 d) Zero (0) e) None of the above.: d) Zero (0)