Load calculations- branch and feeder circuits
1.
What is the demand load for one household range with a nameplate rating
of
11.75kW, 240V, 1Ø?: 8kW.
2. What is the load center length for a branch circuit with noncontinuous loads of
20A at 60' from the source and 50A at 125' from the source?: 106.43'
3.
What is the required circuit ampacity of a noncontinuous, single-phase load
of
8.5kW at 277V?: 30.69A
4.
What is the lighting load on a 120V circuit for six 100W incandescent lights and
four fluorescent fixtures with a ballast rating of 1.5A, all operating continuously for
8 hours per day?:
13.75A
5.
What is the total ampacity for a 120V branch circuit consisting of four duplex
receptacles rated noncontinuous duty and six duplex receptacles rated
continuous
duty?: 17.25A
6.
The load for 10' of multi-outlet assembly used to supply several loads
simul
taneously is: 1,800VA
7. Conductors must be derated when installed in conduit: on or above
rooftops
8.
What is the total load required by the NEC® for two appliance branch circuits
pf3

Partial preview of the text

Download Load Calculations -Branch and Feeder Circuits and more Exams Electrical Engineering in PDF only on Docsity!

1 /

Load calculations- branch and feeder circuits

  1. What is the demand load for one household range with a nameplate rating of 11.75kW, 240V, 1Ø?: 8kW.
  2. What is the load center length for a branch circuit with noncontinuous loads of 20A at 60' from the source and 50A at 125' from the source?: 106.43'
  3. What is the required circuit ampacity of a noncontinuous, single-phase load of 8.5kW at 277V?: 30.69A
  4. What is the lighting load on a 120V circuit for six 100W incandescent lights and four fluorescent fixtures with a ballast rating of 1.5A, all operating continuously for 8 hours per day?: 13.75A
  5. What is the total ampacity for a 120V branch circuit consisting of four duplex receptacles rated noncontinuous duty and six duplex receptacles rated continuous duty?: 17.25A
  6. The load for 10' of multi-outlet assembly used to supply several loads simultaneously is: 1,800VA
  7. Conductors must be derated when installed in conduit: on or above rooftops
  8. What is the total load required by the NEC® for two appliance branch circuits

2 / plus a laundry branch circuit?: 4,500VA

  1. Continuous loads are calculated at what percentage of the maximum cur- rent rating of the overcurrent device?: 80%
  2. The maximum size dual-element fuse for a 40hp, 3Ø, 460V motor with a Design Letter D is: 100A
  3. What is the motor full-load current for a motor with a nameplate rating of 50hp, 460V, 3Ø?: 65A
  4. Air conditioning overcurrent protective devices can never exceed what percentage of the motor-rated load current or the branch circuit selection current (whichever is greater)?: 225%
  5. A sign load cannot exceed: 80% of the branch circuit rating
  6. What is the feeder load (in VA) for three small appliance branch circuits?: - 4.500VA
  7. What is the ampacity of a water heater with a nameplate rating of 7,200VA at 240V?: 37.5A .When space heating equipment uses electric resistance heating elements, protection for the resistance elements must not exceed: 60A
  8. A noncontinuous load of two 120V outlets for heavy-duty lamp holders would have a load of: 1,200VA