Download Marine Piping schematic and more Schemes and Mind Maps Marine Engineering in PDF only on Docsity! Al
NOTES:
e FOR UNIT & TANK CAPACITIES SEE
SEPARATE MACHINERY LISTS.
e FOR PIPING & VALVE MATERIALS SEE
MACHINERY SPECIFICATION SECTION J”.
¢ SYSTEM TO COMPLY WITH LLOYDS RULES
& REGULATIONS WHERE APPLICABLE.
(@>DISCH. |
OVERB FIRE, BILGE/
| BALLAST PUMP
(SELF—PRIMING) |
_
125)
NO.5 D.B. W.B. TANK. & <& FOR BUILT_IN TANKS AIR & SOUNDING
CONN. SEE DRG. NO. P/15
<> CONTD. ON DRG. NO. E/11 (S.W. SYSTEM)
<® conrp. ON DRG. NO. E/12 (BILGE SYSTEM)
<© cONTD. ON DRG. NO. E/17 (FIRE SYSTEM)
<® contp. ON DRG. NO. P/13 (BALLAST. SYSTEM)
FILLING / HIGH SUCTION an i Se
TO BE POSITIONED ABOVE , 0 sea_| | ae <> CONTD. ON DRG. NO. £/14 (F.W. SYSTEM)
TOP OF STERN TUBE | SUCTION| SUCT.
| | 100
| | y 11250
NO.6 D.B. WATER BALLAST TANK <> SO | i}
NO.6_D.B. WATER BALLAST TANK & | | L 100 NO.3 D.B (W.B) TANK(P) SUCT./FILLG
BALLAST TANK FWW65. | | “aA oN
| FILLING LINE I
AFT_PEAK I WBS8 | 400 150
i — H Ip< _ _
W.B. TANK ¢ woot \ I | we
& "e | we I WB 3 &
sooxee “shut rk he <> TO1EM. GEN | wo ft Qe te ae SS EE EE IIE SAIS
| 40 WB WB wB | (iY
| 55 pw. GEN 76 37 Fp Let LLLP Le LL LL LLL kt
\ EMERG. SUPP |
FEED. PUMP ~
|
|
|
|
|
UCTION!
© _F.Wioen. 5°] sex
|
|
W.B. TANK. &
—--y eS -
ET =F ype rinedwastoeck <>
FIRE, BILGE/ !
BALLAST PUMP |
(SELF—PRIMING)
TITLE: noe |S“ ts
DIAGRAM OF BALLAST SHEET NO: 1
SYSTEM (I.M.S.) OF _1_ SHEETS
DRAWING NO.: