The measurement form used in construction projects to determine the quantities and costs of various items. It includes details on units of measurement and payment for earth work, concrete, brick work, stone work, roofing, flooring, finishing, painting, wood work, steel work, miscellaneous items, and materials. The form is used to maintain accounts and calculate costs for each item.

Typology: Slides

2012/2013

Uploaded on 12/31/2013

mandhata
mandhata 🇮🇳

4.5

(13)

68 documents

1 / 43

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Measurements in Estimating
docsity.com
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b

Partial preview of the text

Download Measurement Form for Construction Project: Units of Measurement & Payment and more Slides Architecture in PDF only on Docsity!

Measurements in Estimating

PROFORMAS USED IN ESTIMATE

1. Measurement form

The details of measurements of each

item of work are taken out

and quantities of each and every

item is computed in a prescribed

form known as measurement form as under :-

Cont.

2. Abstract of cost form

The cost under each item of the work is

determined from the quantities and total cost is

worked out in a prescribed form called abstract

of cost form as shown on next slide

Cont.

Cont.

item no Description quantity unit of payment Rate Amount

Cost Form :

in the account of work and

when the cost is debited to

the suspense head “Materials”, the

account is called “Material at site

account “ M.A.S. accountis maintained

monthwise in form 35 as under

Name of Work …….

Cont.

total issues to the work principal items

unit quantity

pettyitem^ total

Dated initialssub-divisional of officer

Dated initialsdivisional as token ofaccountant check

1. Mass,voluminous and thick works shall

be taken in cubic unit or

volume. the measurements of length,

width and height or depth shall

be taken to compute the volume

or cubic contents

Cont. docsity.com

2. Shallow,thin and surface works shall

be taken in square unit or

in area. the measurement of length

and width or height shall be

taken to compute the area.

UNITS OF MEASUREMENT & PAYMENT

Earth Work

PARTICULARS OF ITEMS Measure Payment

  • Earth filling under floors cu.m % cu.m
  • Rock excavation cu.m %cu.m
  • Puddle clay core cu.m %cu.m

PARTICULARS OF ITEMS Measure Payment

  • Surface dressing and leveling,etc. Sq. m per sq. m
  • cutting of trees no per no.
  • Sand filling cu m per cu m

PARTICULAR OF ITEMS measure payments

  • Precast cement concrete cu m per cu m
  • Cement concrete jali work sq. m per sq. m
  • Cement concrete bed plates cu m per cu m

PARTICULARS OF ITEMS measure payment

  • First class burnt bricks in mud

mortar in foundation and plinth cu m per cu m

  • First class burnt bricks in mud

mortar in super structure cu m per cu m

BRICK WORK

STONE WORK

PARTICULARS OF ITEMS measure payment

  • Coursed rubble masonry in mud mortar in foundation and plinth cu m per cu m
  • Coursed rubble masonry in mud mortar in super structure cu m per cu m

PARTICULARS OF ITEMS measure payment

  • Coursed rubble masonry in lime mortar 1:3 in foundation and plinth cu m per cu m
  • Coursed rubble masonry in cement mortar 1:7 in foundation and plinth cu m per cu m
  • Coursed rubble masonry in cement mortar 1:7 in super structure cu m per cu mdocsity.com