The mechanics of calculating velocity is easy. ▫ Velocity is measured from the average of the last three sprints. • Only use the completed stories.
Typology: Schemes and Mind Maps
1 / 5
This page cannot be seen from the preview
Don't miss anything!




SWEN-610 Foundationsof Software Engineering Department of Software EngineeringRochester Institute of Technology
Velocity is the last piece of the Scrum process.
At this point in the course, you've seen all of theScrum processes, except for measuring velocity. Velocity is what determines the maximum storypoints to be included in the next sprint. Recall our Sprint planning lesson: 2 S (5) S (13) S (21) S (3) S (3) ProductBacklog Sprint Backlog S (2) S (13) S (5) The velocity is used to determinehow many (and which) stories toadd to the Sprint Backlog. In thiscase, the team's velocity was 25story points.
Velocity is specific to one team working on oneproject.
This assumes that sprint length and teammembership remain consistent.^ • If either of these two change, then velocitymeasurement must start over with a new runningaverage. Velocity is only measured for a single project,single team.^ • Story points are level of effort estimates
Story points are determined by the team, for theteam - Thus you cannot compare velocity's between teams Management cannot set a team's velocity. 4
Velocity is not the same as the team's overallcapacity.
Velocity is only a measure of effort for working onuser stories.^ • It does not include company meetings, emailcommunication, small "outside" tasks
For class, it does not include most pre- and post-class activities What about these issues?^ • Holidays or vacations - Members given large, outside tasks Normally these issues can be ignored beingsmoothed out by the averaging process. In extreme cases, the team can make adjustmentsto the calculated velocity usually by lowering it. 5