Michigan Hydronic and Process Piping Test Practice Exam Questions with Q&A, Exams of Engineering

Practice exam questions and answers for the michigan hydronic and process piping test. It covers topics such as boiler requirements, safety valves, water column connections, and regulations like act 230 and the skilled trades regulation act (stra). This study guide is designed to help individuals prepare for the certification exam by testing their knowledge of relevant codes, standards, and best practices in the field. It includes questions on boiler components, pressure settings, and legal requirements, making it a valuable resource for exam preparation.

Typology: Exams

2025/2026

Available from 10/22/2025

Martin-Ray-1
Martin-Ray-1 🇺🇸

4.7

(12)

9.9K documents

1 / 16

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Michigan Hydronic and Process Piping Test |
Practice Exam Questions – Verified Latest
Version with Complete Q&A.
Page 1 of 16
1. What is the minimum clearance required between a boiler, it's controls,
firing equipment, and appurtenances to building walls or other
boilers/machinery? - Answer ✔️24"
2. 133% of operating temp and 150% of operating pressure - Answer
✔️For non-vaporizing organic fluid boilers what is the thermometer and
pressure gauge graduation settings?
3. 1.5x to 4x the operating pressure - Answer ✔️A miniature hobby
locomotive boiler shall have a pressure gauge with a range between?
4. X = 10% ; Y = 1/2" - Answer ✔️A miniature hobby locomotive boiler
shall have it's water level gauge glass located so that the top nut of the
gauge glass is X% of the distance between the crown sheet and the shell
not no less than Y inches above the crown sheet.
5. True - Answer ✔️A miniature hobby locomotive shall have two safety
valves set at not more than 10% above the operating pressure, true or
false.
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff

Partial preview of the text

Download Michigan Hydronic and Process Piping Test Practice Exam Questions with Q&A and more Exams Engineering in PDF only on Docsity!

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

  1. What is the minimum clearance required between a boiler, it's controls, firing equipment, and appurtenances to building walls or other

boilers/machinery? - Answer ✔️ 24"

2. 133% of operating temp and 150% of operating pressure - Answer

✔️ For non-vaporizing organic fluid boilers what is the thermometer and

pressure gauge graduation settings?

3. 1.5x to 4x the operating pressure - Answer ✔️ A miniature hobby

locomotive boiler shall have a pressure gauge with a range between?

4. X = 10% ; Y = 1/2" - Answer ✔️ A miniature hobby locomotive boiler

shall have it's water level gauge glass located so that the top nut of the gauge glass is X% of the distance between the crown sheet and the shell not no less than Y inches above the crown sheet.

5. True - Answer ✔️ A miniature hobby locomotive shall have two safety

valves set at not more than 10% above the operating pressure, true or false.

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

6. 50 psi - Answer ✔️ A Blowdown Vessel shall have a minimum

allowable working pressure of what?

  1. A vent connection, a drain connection, a thermometer with a max scale reading of 300°F located in the water outlet, and a pressure gauge

between 0-30 psi attached to the top of the steam space - Answer

✔️ The blowdown vessel shall contain which 4 components?

8. Direct spring-loaded pop-type valves or safety relief valves - Answer

✔️ Which type of safety valves should be used on a boiler?

  1. 6% above the highest pressure to which any valve is set and in no case

more than 6% above the MAWP - Answer ✔️ What is the required

safety valve capacity for an existing Boiler? 10.One or more shall be set at or below the MAWP and then all others can be set within a range of 3% above the MAWP. The range of setting of all the safety valves on a boiler shall not exceed 10% of the highest valve setting.

  • Answer ✔️ What is the required safety valve pressure setting on an existing Boiler?

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

16.Be limited have no outlet connections with the exception of regulators, drains, and gauges. The valved drain shall be at least 3/4" diameter. -

Answer ✔️ Water column connections shall...

17.3 except for when the boiler has 2 water glasses located on the same

horizontal lines. - Answer ✔️ How many gauge cocks are required

within a visible length of the water glass? 18.1.5 times the MAWP connected to the steam space or steam connection

to the water column - Answer ✔️ Each steam boiler shall have a

pressure gauge with a range of not less than?

19.True - Answer ✔️ True or false, each steam outlet from a power boiler

shall be fitted with a stop valve located as close as practicable to the boiler

20.Stop Valve - Answer ✔️ Each Boiler supply and return pipe connection

requires a...

21.No, only a cock type valve shall be used. - Answer ✔️ Are globe valves

permitted in blowoff piping connections?

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

22.They shall be of at least XH thickness and be run full size without reducers

or bushings and shall not be galvanized. - Answer ✔️ When MAWP

exceeds 100 psig, what is a requirement for blowoff piping materials?

23.3/4" - Answer ✔️ What is the minimum size for the valve or cock

connected on blowoff piping connected at the lowest water space practicable?

24.For boilers > 36", 12". For boilers ≤ 36", 6". - Answer ✔️ Based on the

external width, what is the minimum distance between the bottom of the boiler and the floor line?

25.12" x 16" or equivalent area, the least dimension being 11" - Answer

✔️ What is the minimum size for an access door in a boiler?

26.One, and they should be set at or below the MAWP of the boiler -

Answer ✔️ How many pressure relief valves are required for hot

water heater boilers and what should they be set to? 27.The extra valve can be set between 6 psi up to a maximum of 60 psi or

10% of the MAWP. - Answer ✔️ When more than one pressure relief

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

34.An appointment with the Act 230 State Construction Code Commission

lasts how long? - Answer ✔️ 2 years prior to 2007 and 4 years after

35.Act 230 Building permits shall be granted in part or in whole or denied

within how long? - Answer ✔️ 10 business days

36.True or False: An enforcing agency may suspend, revoke or cancel a building permit in case of failure or neglect to comply with Act 230

requirements - Answer ✔️ True

37.Act 230 violations may require penalties not to exceed...? - Answer

✔️ $500 for each violation or day that a violation continues

38.A person / corporation / goverment official charged with unlawful conduct issuing permits who violates Act 230 may be subject to... -

Answer ✔️ Fine of not more than $500, imprisonment for no more

than 90 days, or both 39.Civil Violation of Act 230 - Failure to obtain the required license prior to

performing work will result in... - Answer ✔️ Fined no less than $

and no more than $

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

40.Act 230 became effective on what date? - Answer ✔️ January 1st,

41.Act No. 407 is also known as what? - Answer ✔️ Skilled Trades

Regulation Act (STRA) 42.Act No. 407 / Skilled Trades Regulation Act became effective as of what

date? - Answer ✔️ April 4, 2017

43.Article 1 of the Skilled Trades Regulation Act Covers... - Answer

✔️ Short title, definitions, and effects of former acts

44.Article 2 of the Skilled Trades Regulation Act Covers... - Answer

✔️ Issuance of Licenses

45.Article 3 of the Skilled Trades Regulation Act Covers... - Answer

✔️ Board Membership and Voting

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

52.Article 10 of the Skilled Trades Regulation Act Covers... - Answer

✔️ Building Officials and Inspectors

53.Article 11 of the Skilled Trades Regulation Act Covers... - Answer

✔️ Plumbers and Plumbing Contractors

54.According to STRA, Boards shall consist of... - Answer ✔️ 9 voting

members. 6 who have a license or registration in the occupation the board monitors. 3 general pubic members

55.A member of an STRA board shall be at least how old? - Answer ✔️ 18

56.STRA board membership lasts how long? - Answer ✔️ 4 years

57.Appointments to the STRA board is made by whom? - Answer ✔️ The

Governor 58.An STRA license may be renewed within 60 days after the expiration date -

True or False - Answer ✔️ True, with late renewal fee payment

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

59.A person violating Act 407 / STRA by performing work without a license is

guilty of? - Answer ✔️ A misdemeanor punishable by a fine up to

$500 or imprisonment for not more than 90 days or both. 60.A person found violating Act 407 / STRA a second time by performing

work without a license is guilty of? - Answer ✔️ A misdemeanor

punishable by a fine up to $1000 or imprisonment for not more than 1 year, or both. 61.A person found violating Act 407 / STRA a third or subsequent time by

performing work without a license is guilty of? - Answer ✔️ A felony

punishable by a fine of not more than $25,000 or imprisonment for not more than 5 years, or both. 62.A licensed person found violating Act 407 / STRA may be penalized by... -

Answer ✔️ Placement of a limitation on license, suspension of

license, denial of license or renewal, revocation of license, an administrative fine of up to $10,000, censure, probation, financial restitution.

63.STRA lists the examination fee at? - Answer ✔️ $

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

69.MAWP refers to? - Answer ✔️ Maximum allowable working pressure

which is the maximum gage pressure permissible for a boiler to operate 70.Hot Water Heating and Hot Water Supply Boilers are classified as? -

Answer ✔️ A boiler that operates at pressures not over 160 psi or

temperatures not over 250°F

71.A Miniature Boiler is defined as? - Answer ✔️ A power boiler that is

not over 16" inside shell diameter, has a working pressure of no more than 100 psig, has a gross volume of no more than 5 cu. ft, and has no more than 20 sq. ft of heating surface 72.New Boiler is defined as a boiler constructed, installed, placed in

operation, or contracted after what date? - Answer ✔️ July 1st, 1966

73.A Water Heater is defined as what? - Answer ✔️ A heater supplying

potable hot water at pressures not exceeding 160psi or temperatures not exceeding 210°F. A water heater does not exceed 200,000 BTU/hr or a capacity of more that 120 gallons

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

74.May a single manually-operated remote shutdown switch be used in a multiple boiler installation that shares a common boiler room? -

Answer ✔️ Yes

75.True or False, if multiple contractors are performing separate work on the same boiler only one contractor is required to be licensed and obtain a

permit? - Answer ✔️ False, all contractors must be licensed and

obtain a permit for the work to be performed

76.Boiler installer license class 1B allows for... - Answer ✔️ Installation of

a low-pressure boiler or group of modular boilers not to exceed 1,000, BTU/hr

77.Boiler installer license class 2B allows for... - Answer ✔️ Installation of

a low-pressure boiler of any capacity or firing rate and any class 1B work

78.Boiler installer license class 3B allows for... - Answer ✔️ Installation of

a power boiler that has a capacity of no more than 5,000 pounds of steam/hr and install non-boiler external piping as defined by ASME B31.

Practice Exam Questions – Verified Latest

Version with Complete Q&A.

85.A Boiler repairer license class III allows for... - Answer ✔️ Repair of

high pressure boilers and repair/replacement of non-boiler external piping

86.A Boiler repairer license class IV allows for... - Answer ✔️ Repair of

field-erect boilers of any pressure with the exception of nuclear heat source boilers or their parts

87.A Boiler repairer license class V allows for... - Answer ✔️ Erection and

repair of a boiler that has a nuclear heat source or it's parts, appurtenances, or system components