Practice exam questions and answers for the michigan hydronic and process piping test. It covers topics such as boiler requirements, safety valves, water column connections, and regulations like act 230 and the skilled trades regulation act (stra). This study guide is designed to help individuals prepare for the certification exam by testing their knowledge of relevant codes, standards, and best practices in the field. It includes questions on boiler components, pressure settings, and legal requirements, making it a valuable resource for exam preparation.
Typology: Exams
1 / 16
This page cannot be seen from the preview
Don't miss anything!










pressure gauge graduation settings?
locomotive boiler shall have a pressure gauge with a range between?
shall have it's water level gauge glass located so that the top nut of the gauge glass is X% of the distance between the crown sheet and the shell not no less than Y inches above the crown sheet.
valves set at not more than 10% above the operating pressure, true or false.
allowable working pressure of what?
safety valve capacity for an existing Boiler? 10.One or more shall be set at or below the MAWP and then all others can be set within a range of 3% above the MAWP. The range of setting of all the safety valves on a boiler shall not exceed 10% of the highest valve setting.
16.Be limited have no outlet connections with the exception of regulators, drains, and gauges. The valved drain shall be at least 3/4" diameter. -
17.3 except for when the boiler has 2 water glasses located on the same
within a visible length of the water glass? 18.1.5 times the MAWP connected to the steam space or steam connection
pressure gauge with a range of not less than?
shall be fitted with a stop valve located as close as practicable to the boiler
requires a...
permitted in blowoff piping connections?
22.They shall be of at least XH thickness and be run full size without reducers
exceeds 100 psig, what is a requirement for blowoff piping materials?
connected on blowoff piping connected at the lowest water space practicable?
external width, what is the minimum distance between the bottom of the boiler and the floor line?
26.One, and they should be set at or below the MAWP of the boiler -
water heater boilers and what should they be set to? 27.The extra valve can be set between 6 psi up to a maximum of 60 psi or
34.An appointment with the Act 230 State Construction Code Commission
35.Act 230 Building permits shall be granted in part or in whole or denied
36.True or False: An enforcing agency may suspend, revoke or cancel a building permit in case of failure or neglect to comply with Act 230
38.A person / corporation / goverment official charged with unlawful conduct issuing permits who violates Act 230 may be subject to... -
than 90 days, or both 39.Civil Violation of Act 230 - Failure to obtain the required license prior to
and no more than $
Regulation Act (STRA) 42.Act No. 407 / Skilled Trades Regulation Act became effective as of what
members. 6 who have a license or registration in the occupation the board monitors. 3 general pubic members
Governor 58.An STRA license may be renewed within 60 days after the expiration date -
59.A person violating Act 407 / STRA by performing work without a license is
$500 or imprisonment for not more than 90 days or both. 60.A person found violating Act 407 / STRA a second time by performing
punishable by a fine up to $1000 or imprisonment for not more than 1 year, or both. 61.A person found violating Act 407 / STRA a third or subsequent time by
punishable by a fine of not more than $25,000 or imprisonment for not more than 5 years, or both. 62.A licensed person found violating Act 407 / STRA may be penalized by... -
license, denial of license or renewal, revocation of license, an administrative fine of up to $10,000, censure, probation, financial restitution.
which is the maximum gage pressure permissible for a boiler to operate 70.Hot Water Heating and Hot Water Supply Boilers are classified as? -
temperatures not over 250°F
not over 16" inside shell diameter, has a working pressure of no more than 100 psig, has a gross volume of no more than 5 cu. ft, and has no more than 20 sq. ft of heating surface 72.New Boiler is defined as a boiler constructed, installed, placed in
potable hot water at pressures not exceeding 160psi or temperatures not exceeding 210°F. A water heater does not exceed 200,000 BTU/hr or a capacity of more that 120 gallons
74.May a single manually-operated remote shutdown switch be used in a multiple boiler installation that shares a common boiler room? -
75.True or False, if multiple contractors are performing separate work on the same boiler only one contractor is required to be licensed and obtain a
obtain a permit for the work to be performed
a low-pressure boiler or group of modular boilers not to exceed 1,000, BTU/hr
a low-pressure boiler of any capacity or firing rate and any class 1B work
a power boiler that has a capacity of no more than 5,000 pounds of steam/hr and install non-boiler external piping as defined by ASME B31.
high pressure boilers and repair/replacement of non-boiler external piping
field-erect boilers of any pressure with the exception of nuclear heat source boilers or their parts
repair of a boiler that has a nuclear heat source or it's parts, appurtenances, or system components