National Grid Task #71 Operator
excavation and backfilling
Soil class is type c and its the least stable - //correct answer//-What type of soil class is
used for national grid and how stable is it?
BEPM - Butane, Ethane, Propane, Methane - //correct answer//-What are the natural
gases?
for all excavations at a depth of 5 feet or more - //correct answer//-When is shoring
mandatory?
electric - powerlines, cables, conduit, and lighting cables - //correct answer//-RED utility
markings is
communication - alarm or signal lines, cables or conduits - //correct answer//-ORANGE
utility markings is
gas - oil, steam, petroleum, or gaseous materials - //correct answer//-YELLOW utility
markings is
sewer - sewers and drain lines - //correct answer//-GREEN utility markings is
water - potable water - //correct answer//-BLUE utility markings is
slurry lines - reclaimed water, irrigation or slurry lines - //correct answer//-PURPLE utility
markings is
temporary survey markings - //correct answer//-PINK utility markings is
proposed excavation - //correct answer//-WHITE utility markings is
white proposed excavation, pink temp survey and purple slurry, reclaimed and grey
water and radioactive lines - //correct answer//-Which utility markings are seen but not
as prominent?
on 6" lifts - //correct answer//-when are pneumatic tamper and pavement breaker
tamping foot used?
pf3

Partial preview of the text

Download National Grid Task Update and more Exams Engineering Science and Technology in PDF only on Docsity!

National Grid Task #71 Operator

excavation and backfilling

Soil class is type c and its the least stable - //correct answer//-What type of soil class is used for national grid and how stable is it? BEPM - Butane, Ethane, Propane, Methane - //correct answer//-What are the natural gases? for all excavations at a depth of 5 feet or more - //correct answer//-When is shoring mandatory? electric - powerlines, cables, conduit, and lighting cables - //correct answer//-RED utility markings is communication - alarm or signal lines, cables or conduits - //correct answer//-ORANGE utility markings is gas - oil, steam, petroleum, or gaseous materials - //correct answer//-YELLOW utility markings is sewer - sewers and drain lines - //correct answer//-GREEN utility markings is water - potable water - //correct answer//-BLUE utility markings is slurry lines - reclaimed water, irrigation or slurry lines - //correct answer//-PURPLE utility markings is temporary survey markings - //correct answer//-PINK utility markings is proposed excavation - //correct answer//-WHITE utility markings is white proposed excavation, pink temp survey and purple slurry, reclaimed and grey water and radioactive lines - //correct answer//-Which utility markings are seen but not as prominent? on 6" lifts - //correct answer//-when are pneumatic tamper and pavement breaker tamping foot used?

on 6" to 12" lifts - //correct answer//-When are vibratory plate compactor and percussive whacker rammer used? Tracing wire is present - //correct answer//-Why should you use caution digging in area of plastic pipes? 811 for mark out - //correct answer//-How do you notify utilities of the intent to excavate? every 25 feet - //correct answer//-When should you check for proper compaction in each trench? 200 feet - //correct answer//-anytime that excavation is planned within ___________ of a gas regulator or gate station, gas control and the instrumentation and regulation department must be notified removed or shoring will need to be installed - //correct answer//-if part of the pavement where the excavation is being performed becomes undetermined, this portion must be __________________ or _______________________ 2 feet - //correct answer//-excess spoil and material must be placed ______________ from the edge of the excavation a mark out - //correct answer//-What does the state law require prior to non-emergency excavation or digging? the excavator - //correct answer//-Who is the responsible party for preserving the mark out? 19.5% - //correct answer//-Oxygen deficient atmosphere is less than ____________ support and protection - //correct answer//-if utilities are undetermined, they will require _________ and ________ 811 - //correct answer//-Who do you call before the start of any excavation? exposing an unknown facility during any excavation - //correct answer//-811 and recheck of company records are required when


proper PPE, tools for the job, control of all energy sources and hazards associated with the job - //correct answer//-a job brief inlcudes: request a work stoppage due to code violation - //correct answer//-what do you do if a 3rd party was found to be working around transmission lines without a proper mark out?