A comprehensive set of questions and answers for the nc heating h3 class 1 certification exam. It covers various topics related to heating systems, fuel gas codes, refrigeration systems, and mechanical appliance installations. The questions are designed to test knowledge of the 2018 nc energy code, smacna standards, and other relevant regulations. This resource is valuable for students and professionals preparing for the certification exam, offering practical insights into code compliance and best practices in the field. It includes topics such as duct systems, refrigerant piping, ventilation, combustion air, and appliance installation requirements. The document serves as a study guide, helping users understand and apply the necessary codes and standards for heating systems.
Typology: Exams
1 / 16
This page cannot be seen from the preview
Don't miss anything!










discharge to ________
shall be of an approved type and installed in accordance with the nc ________code
large mercantile occupancies are defined as those facilities where more than _____ persons congregate to purchase personal merchandise.
passageways around all sides of boilers shall have a minimum unobstructed width of _____ inches unless otherwise approved.
permanents type shall be
incorporates a common condensing unit, a variable capacity compressor and multiple indoor fan coils with independent refrigerant piping is refered to in the code as a
operating at static pressures in excess of ______ inches w.g. must be leak rested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual.
piping applications is limited to a maximum size of ____ inches in diameter.
to be cut or notched to a maximum depth of _____ percent of the stud depth.
gravity outdoor air intake openings provided for ventilation shall be located a minimum of _______ feet horizontally from any noxious contaminant source.
system require the installation of insulation when an AC coil and outdoor unit is installed when the duct is in a ventilated crawlspace?
through a return grill
refrigerant containing parts may be performed with ______ or ______
envelope in a commercial building it shall be _________?
the operation of gas fired appliance ____________ is required.
space providing indoor combustion air requires a minimum volume of _________ cubic feet per 1000 btu/hr of the appliance input rating.
located not less than ________ inches from the top and bottom of the joist.
opening the mesh size shall not be smaller than _________ inch.
located in attics and crawlspaces are?
3/4 " CPVC tubing shall not exceed _______ feet.
dwelling unit shall be accessed by an opening or door and an unobstructed passageway measuring a minimum of ________ inches in width.
exterior a permanently installed means of access is required where an appliance is installed on a roof that is located more than ______ feet above grade.
coating metallic underground ducts shall be completely encased in a minimum of ________ inches of concrete
through any wall, floor or ceiling.
______ feet from the draft hood of another appliance located in the same room.
for cooling towers shall be _____ connected to an approved disposal system.
the edge of the stud? must have a float switch to off cycle the equipment in the event of a pump failure, can be used with or without gravity drainage possibilities, can be used only if the pump is installed in an emergency drain pan protected with a float switch that will off-cycle the equipment in the event of a pump failure if
following describe the code restrictions on condensate pump usage?
locker room in educational occupancies is _______?
the installation of a permanent fixed means of access in the form of a ladder or roof hatch when the access height exceeds?
space in residences in climate zone 4 requires what r-value insulation?
cubic feet per hour for a 5000 square foot general office building when using the 2018 NCMC?
colored commercial roof sitting on structural framing with a suspended ceiling below dead airspace if the roof deck is made of 1.5" wood with R-20 insulation board and r-13 on the suspended ceiling. the roof is 65'x65' in wilmington, nc on a summer design day with an indoor temperature of 75 degrees F.
saturated temperature is said to be?
delivering 2000 cfm of air will be operating at a velocity of ________feet per minute
field-erected systems shall be made of copper tubing either hard or annealed. What is the largest size of annealed tubing allowed by the code?
which of the following is an approved procedure for commercial duct design?
to be connected with mechanical fittings is?
the summer design conditions in greensboro, nc?
390 cfm diffuser must be? assume the duct is unlined galvanized sheet metal.
when 1450 cfm flow down the duct if the duct is wrapped?
24"x24" filter grill when 75% of the grill is free area and the volume of air is 2000 cfm?
_____________ permanent openings when gas fired appliances are installed and indoor combustion air is used?
worker compensation insurance premiums to the covered employee?
performance bond is required for any federal project above __________ dollars in value.
and must have a flame spread index of not more than?
40 shall be used for group A1 and B1 refrigerants for lines 6" and smaler. what refrigerant groups can use this pipe material for liquid lines between 2" and 6" and all suction and discharge lines 6" and smaller?
clearance from grade of not less than _____ inches.
provided with _______.
filed within a 120 days of furnishing labor or materials at a project. which of the following is not a requirement for filing a lien?
furnaces and a 65,000 btu/hr input water heater in the same area. the appliances are 65 feet from the gas meter and are the only appliances in the structure. assume you have gas supplied to the structure witha specific density of 0.6 and the delivery pressure from the meter is 2 psi. what size type K semi- rigid copper gas line would be required if the total equivalent feet of piping is 65' and the design pressure drop was 1.0 psi?
the design friction rate for a residential duct system according to ACCA manual D?
____C degrees?
room when twenty fluorescent fixtures with standard ballasts and 2-48" t- 12 fluorescent bulbs
notice and a claim of lien with __________?
pump that changes liquid refrigerant into vapor when heat is absorbed into the system in the heating cycle.
gas-fired forced air warm air furnace 120,000 btu/hr when applied in a commercial building?
with pipe insulation that is at least _____thick?
oil supply line?
an 1800sqft residential structure with 8 foot high ceilings of average construction in greensboro, nc?
120,000 btu/hr rooftop heat pump required if the job is in guildford county, north carolina
failure a ______ pound concentrated load on a 2 inch diameter disc applied to the most critical area of the exposed face.
adjusted and tested by _________?
expansion tank, which of the following criteria is not required?
hydronic piping system, it shall be supported at maximum intervals of ___________.
______ refrigerant of refrigerant in systems using positive displacement compressors shall have stop valves installed.