A valuable set of questions and answers related to nerc transmission practices. it covers key concepts in power system operation, including relay operation, load shedding, voltage control, and emergency procedures. The questions test understanding of system stability, coordination, and operational strategies. This resource is suitable for university students and professionals in power systems engineering.

Typology: Exams

2024/2025

Available from 04/22/2025

Your-Exam-Plug
Your-Exam-Plug 🇺🇸

5

(2)

10K documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NERC Transmission Practice Test
Questions and Correct Answers
Which type of relay operates on the premise of comparing the flow in and out of the area of protection?
- Correct Answer: Differential relay
Underfrequency load shedding is set-up so that which of the following does NOT occur? - Correct
Answer: Uncontrolled separation
Who is responsible to make sure that the operation of voltage control equipment is coordinated with
other impacted entities? - Correct Answer: Transmission Operator
The coordination of voltage schedules by system operators would be utilized to reduce all of the
following EXCEPT - Correct Answer: Reactive inadvertent
What should a system operator expect to see if the generator increases its excitation? - Correct Answer:
An increase in MVAR output
A transmission line between Bus A and Bus B has MW flow from Bus B to Bus A. After the tripping of a
parallel line, the line flow from Bus B to Bus A exceeds the lines thermal rating. Which of the following
actions would assist the operator in correcting the problem? - Correct Answer: Increase generation at
Bus A
What is a major concern for a System Operator during emergency conditions? - Correct Answer: System
remains connected to the Interconnection
If your system has lost a large amount of customer load due to a system disturbance, but has remained
connected to all of your neighbors, what is the best solution to consider? - Correct Answer: Coordinate
with the neighbors
You report for work on a peak summer day with expected high temperatures and load. What can you do
to maintain an adequate system voltage profile? - Correct Answer: Get under the voltage by placing
capacitors in service while maintaining operating limits
pf2

Partial preview of the text

Download NERC Transmission Practice Test: Questions and Answers and more Exams Environmental Science in PDF only on Docsity!

NERC Transmission Practice Test

Questions and Correct Answers

Which type of relay operates on the premise of comparing the flow in and out of the area of protection?

  • Correct Answer: Differential relay Underfrequency load shedding is set-up so that which of the following does NOT occur? - Correct Answer: Uncontrolled separation Who is responsible to make sure that the operation of voltage control equipment is coordinated with other impacted entities? - Correct Answer: Transmission Operator The coordination of voltage schedules by system operators would be utilized to reduce all of the following EXCEPT - Correct Answer: Reactive inadvertent What should a system operator expect to see if the generator increases its excitation? - Correct Answer: An increase in MVAR output A transmission line between Bus A and Bus B has MW flow from Bus B to Bus A. After the tripping of a parallel line, the line flow from Bus B to Bus A exceeds the lines thermal rating. Which of the following actions would assist the operator in correcting the problem? - Correct Answer: Increase generation at Bus A What is a major concern for a System Operator during emergency conditions? - Correct Answer: System remains connected to the Interconnection If your system has lost a large amount of customer load due to a system disturbance, but has remained connected to all of your neighbors, what is the best solution to consider? - Correct Answer: Coordinate with the neighbors You report for work on a peak summer day with expected high temperatures and load. What can you do to maintain an adequate system voltage profile? - Correct Answer: Get under the voltage by placing capacitors in service while maintaining operating limits

If a Balancing Authority is unable to calculate ACE for more than _________ minutes it shall notify its Reliability Coordinator. - Correct Answer: 30 Your system configuration presents you with a situation of having two parallel lines between two stations. The lines have different ratings. Line A has a rating of 250 MVA, while line B has a rating of 200 MVA. Based on the line ratings, what is the first contingency transfer capability between the two stations? - Correct Answer: 200 MVA