Paving Level 1 Study Guide (2026/2027)
Verified Exam Questions + Accurate
Solutions
What is the Standard Lot size? - correct answer-2,000 - 4,000 Tons
How many cores are in a sub-lot? - correct answer-5 cores = a full sublot
minimum of 3 cores required.
How many sub-lots make up a lot? - correct answer-Lots are split into 4 sub-lots
How many tons in a sub-lot? - correct answer-500 - 1,000 tons per sublot
depending on Lot size.
A standard lot is composed of what? - correct answer-4 sub-lots with 5 cores per
sub lot
Where in the lane do you pull the Rolling Straight Edge? - correct answer-The
outside wheel path
pf3
pf4

Partial preview of the text

Download Paving Level 1 Study Guide (2026/2027) – Verified Exam Questions + Accurate Solutions and more Exams Construction in PDF only on Docsity!

Paving Level 1 Study Guide (2026/2027)

– Verified Exam Questions + Accurate

Solutions

What is the Standard Lot size? - correct answer- 2,000 - 4 ,000 Tons How many cores are in a sub-lot? - correct answer- 5 cores = a full sublot minimum of 3 cores required. How many sub-lots make up a lot? - correct answer- Lots are split into 4 sub-lots How many tons in a sub-lot? - correct answer- 500 - 1,000 tons per sublot depending on Lot size. A standard lot is composed of what? - correct answer- 4 sub-lots with 5 cores per sub lot Where in the lane do you pull the Rolling Straight Edge? - correct answer- The outside wheel path

The "Zero Point" on the Rolling Straight Edge is checked for calibration by? - correct answer- Placing the manual straight edge next to the rolling straight edge to ensure the surface is flat. What is the objective of the Rolling Straight Edge? - correct answer- Check the smoothness/Rideability of the roadway & ensure no deficiencies outside 3/16's Density coring for acceptance is required for? - correct answer- Mainline paving where thickness is 1 inch or greater & shoulders greater than 5 feet in width. When filling core holes in the pavement, you should? - correct answer- fill the hole in lifts with asphalt and tamp each lift. Which target master mix temperature do you use in the field? - correct answer- Roadway (Compaction Temperature) What unit of measurement is the tack distributor stick divided in? - correct answer- Inches / Sixteenth of an inch Who is responsible for cutting the density cores in the field? - correct answer- The contractor A full LOT is composed of 5 sub lots and 4 cores per LOT, True or False? - correct answer- False. there should be 4 sub lots with 5 cores in each one. What is most important factor when trying to maintain consistent compaction of the asphalt mix? - correct answer- Mix Temperature.

When calibrating the Rolling Straight Edge, to check your highs, you would: - correct answer- Place shims (3/16's & 6/16's) under the center wheel.