1 of 2
IFB # 2018-03073-50
Burley Learning Space Modernization Science Lab
Date: February 26, 2018
ADDENDUM NO: TWO
TO ALL BIDDERS/OFFERORS:
REFERENCE: IFB No: 2018-03073-50
Commodity: Burley Learning Space Modernization Science Lab
IFB Closing On: March 7, 2018
This addendum shall be attached to the Contract Documents and
shall be part thereof to the same extent as if it were originally included. The
contractor shall be responsible for coordinating these changes as they affect other
work in the Contract Documents. Bidders shall acknowledge receipt of this
addendum on their bid form. The Contents of this Addendum alter and amend the
original drawings and specifications and take precedence over the related items
therein.
Please see attached addendum number two:
.
2. All other terms and conditions of the solicitation remain unchanged. Sealed bids must be
received in accordance with the solicitation requirements by 3:00 p.m. EDT on
March 7, 2018. Late bids will not be considered.
pf3
pf4
pf5

Partial preview of the text

Download Please see attached addendum number two: and more Lecture notes Contract Law in PDF only on Docsity!

1 of 2 IFB # 2018-03073- Burley Learning Space Modernization Science Lab

Date: February 26, 2018

ADDENDUM NO: TWO

TO ALL BIDDERS/OFFERORS:

REFERENCE: IFB No: 2018-03073-

Commodity: Burley Learning Space Modernization Science Lab

IFB Closing On: March 7, 2018

This addendum shall be attached to the Contract Documents and

shall be part thereof to the same extent as if it were originally included. The

contractor shall be responsible for coordinating these changes as they affect other

work in the Contract Documents. Bidders shall acknowledge receipt of this

addendum on their bid form. The Contents of this Addendum alter and amend the

original drawings and specifications and take precedence over the related items

therein.

Please see attached addendum number two:

2. All other terms and conditions of the solicitation remain unchanged. Sealed bids must be

received in accordance with the solicitation requirements by 3:00 p.m. EDT on

March 7, 2018. Late bids will not be considered.

2 of 2 IFB # 2018-03073- Burley Learning Space Modernization Science Lab

3. A signed acknowledgement of this addendum must be received by this office and attached to

your bid by the bid due date and time. Signature on this addendum does not constitute your

signature on the original bid document. The original bid document must be signed also.

Sincerely,

Lisa Thomas

Lisa Thomas

Buyer I

Phone: (434-296-5854)

Name of Firm Signature/Title

Date Printed Name

creating healthy places to live + learn + work + play

ADDENDUM NO. 2

Burley Middle School Learning Space Modernization 2018

Addendum Date: 26 February, 2018

TO ALL BIDDERS

Project: Burley Middle School Learning Space Modernization 2018 IFB No. 2018-03073-

The following constitutes Addendum No. 2 to the Contract Documents dated February 05, 2018. This addendum shall be attached to the Contract Documents and shall be part thereof to the same extent as if it were originally included. The contractor shall be responsible for coordinating these changes as they affect other work in the Contract Documents. Bidders shall acknowledge receipt of this addendum on their bid form. The Contents of this Addendum alter and amend the original drawings and specifications and take precedence over the related items therein.

THERE IS NO CHANGE TO THE BID OPENING DATE OR TIME BY THIS ADDENDUM.

REVISIONS TO PROJECT MANUAL:

None.

REVISIONS TO DRAWINGS:

Sheet T002.

Item 1. Abbreviation correction. REPLACE “CBD” with “CBP”.

Sheet A101.

Item 1. Door Schedule, Door Material Clarifications. In the Door Material column,

INSERT the following:

For Door A158B, “SF”

For Door A170A, “WD”

For Door A179A, “WD”

2 | P a g e

creating healthy places to live + learn + work + play

Item 2. Door Schedule, Door Finish Clarification. In the Door Finish column:

For Doors A136B, A171D, A190A, DELETE the word “Clear.”

Item 3. Door Schedule, Door Finish Clarification. In the Comments column:

For Doors A136B, A171D, A190A, INSERT the following, “SEE SPEC FOR LAMINATE DOORS.”

Item 4. Door Schedule, Door Type Clarification. In the Door Type column:

For Doors A130A and A130B, REPLACE “HM1” with ”E”.

Item 5. Door Schedule, Frame Type Clarification. In the Frame Type column:

For Doors A171A and A171E, REPLACE the existing designation with “NOTE 1”.

Item 6. Paint and Finish Legend Clarification. In the Mark column, in the second row, REPLACE “CPB-2” with “CBP-2.”

Item 7. Paint and Finish Legend Clarification. In Paint and Finish General Note 1, REPLACE “FLAST” with “FLAT.”

Sheet E 003.

Item 1. Sheet E003 is re-issued in its entirety.

END OF ADDENDUM 02