The contractor shall be responsible for coordinating these changes as they affect other work in the Contract Documents. Bidders shall ...
Typology: Lecture notes
1 / 5
This page cannot be seen from the preview
Don't miss anything!




1 of 2 IFB # 2018-03073- Burley Learning Space Modernization Science Lab
Please see attached addendum number two:
2 of 2 IFB # 2018-03073- Burley Learning Space Modernization Science Lab
Lisa Thomas
Burley Middle School Learning Space Modernization 2018
Addendum Date: 26 February, 2018
Project: Burley Middle School Learning Space Modernization 2018 IFB No. 2018-03073-
The following constitutes Addendum No. 2 to the Contract Documents dated February 05, 2018. This addendum shall be attached to the Contract Documents and shall be part thereof to the same extent as if it were originally included. The contractor shall be responsible for coordinating these changes as they affect other work in the Contract Documents. Bidders shall acknowledge receipt of this addendum on their bid form. The Contents of this Addendum alter and amend the original drawings and specifications and take precedence over the related items therein.
None.
Sheet T002.
Item 1. Abbreviation correction. REPLACE “CBD” with “CBP”.
Sheet A101.
Item 1. Door Schedule, Door Material Clarifications. In the Door Material column,
INSERT the following:
For Door A158B, “SF”
For Door A170A, “WD”
For Door A179A, “WD”
2 | P a g e
Item 2. Door Schedule, Door Finish Clarification. In the Door Finish column:
For Doors A136B, A171D, A190A, DELETE the word “Clear.”
Item 3. Door Schedule, Door Finish Clarification. In the Comments column:
For Doors A136B, A171D, A190A, INSERT the following, “SEE SPEC FOR LAMINATE DOORS.”
Item 4. Door Schedule, Door Type Clarification. In the Door Type column:
For Doors A130A and A130B, REPLACE “HM1” with ”E”.
Item 5. Door Schedule, Frame Type Clarification. In the Frame Type column:
For Doors A171A and A171E, REPLACE the existing designation with “NOTE 1”.
Item 6. Paint and Finish Legend Clarification. In the Mark column, in the second row, REPLACE “CPB-2” with “CBP-2.”
Item 7. Paint and Finish Legend Clarification. In Paint and Finish General Note 1, REPLACE “FLAST” with “FLAT.”
Sheet E 003.
Item 1. Sheet E003 is re-issued in its entirety.