


Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
A comprehensive overview of the key concepts and principles related to producing systems in the context of manufacturing and procurement. It covers topics such as contract changes, the 5ms of manufacturing, learning curve theory, roles and responsibilities of contracting officers, quality management, and lean manufacturing practices. The document aims to equip readers with a solid understanding of the fundamental aspects of producing systems, including their impact on cost, schedule, and performance. By studying this document, students and professionals can gain valuable insights into the effective management and optimization of manufacturing processes, which are crucial for successful project delivery and cost control.
Typology: Exams
1 / 4
This page cannot be seen from the preview
Don't miss anything!



ACQ 202 [MODULE 5] PRODUCING SYSTEM ACQ 202 [MODULE 5] PRODUCING SYSTEM EXAM WITH GUARANTEED ACCURATE ANSWERS When a contractor begin work generated by a change order that does not have a full negotiated agreement on terms of work, cost, and schedule signed by both parties, a contract change has been initiated that is _______. - ACCURATE ANSWER✅✅Undefinitized All of the five elements (5Ms) of manufacturing contribute o the cost of production. Which one of the following is NOT one of the 5Ms? - ACCURATE ANSWER✅✅Mandates. According to learning curve theory, when the quantity of an item produced doubles, the labor hours required to produce the item _______. - ACCURATE ANSWER✅✅Decreased by a fixed percentage. The ____________ has a direct line of communication with the Procuring Contracting Officer, and the __________ has a direct line of communication with the Program Manager. - ACCURATE ANSWER✅✅Administrative Contracting Officer, Program Integrator.
Personal liability for unauthorized commitments is determined by _________. - ACCURATE ANSWER✅✅The procedures of each agency. Design changes that are made after the beginning of production tend to be equal in cost to changes made prior to production. - ACCURATE ANSWER✅✅False The cost of achieving quality can be broken down into which THREE of the following areas (Select three answers): - ACCURATE ANSWER✅✅1). Appraisal 2). Failure 3). Prevention In determining the correct appropriation for funding the development of a product improvement, the first/primary consideration is: - ACCURATE ANSWER✅✅Will it increase the performance capability? Process proofing ensures that high risk areas, such as assembly methods and personnel training, are optimized _______________________. - ACCURATE ANSWER✅✅Before the start-up of full rate production Which of the following can negatively impact the learning curve, production costs, and schedule? - ACCURATE ANSWER✅✅Inconsistent product design. Manpower, measurement, methods, machinery, and materials are collectively referred to as the ___________________. - ACCURATE ANSWER✅✅5Ms of Manufacturing.
Contracting Officer on the current contract for trucks tells the contractor to install special snow tires on a shipment of trucks. The Contracting Officer does not have enough time to negotiate the price up front, but she limits the Government's risk by putting a not-to-exceed price on the work. This is an example of what kind of modification? - ACCURATE ANSWER✅✅change order that is undefinitized. Which of the following is considered to be a practice of "Lean Manufacturing?" - ACCURATE ANSWER✅✅Low levels of inventory In the cost of quality breakdown, appraisal is: - ACCURATE ANSWER✅✅Money spent looking for errors. Learning curve theory states that as the quantity of a product produced _______, the man-hours per unit expended producing the product ______. - ACCURATE ANSWER✅✅Doubles; decrease at a fixed rate. Which of the following results in a flatter learning curve? - ACCURATE ANSWER✅✅Increased automation. What is the typical impact on a program's cost and schedule when unstable requirements lead to changes late in the system's development? - ACCURATE ANSWER✅✅Significantly negative impact on cost and schedule.