Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Instructions on how to use the PRINCE2 Project Quality Plan template, including loading the file, deleting prompts, saving the document, and checking quality criteria. It also outlines the contents of the Project Quality Plan and its purpose.
Typology: Study notes
1 / 8
This page cannot be seen from the preview
Don't miss anything!





Introduction The template reflects the steps set out in the PRINCE2 Method and is designed to prompt the Project Manager and help in the creation of the Project Quality Plan. The information for the Project Quality Plan will be found within the IP Process of the PRINCE2 Manual. There is also a Product Description for the Project Quality Plan at Appendix A of the PRINCE Manual. Loading the file This template has been produced using Microsoft Word 97. To use it, load up the file directly from the directory and starting from page 1 follow the prompts (in [...] brackets). Deleting the [....] text When the template is complete, the whole Project Quality Plan document can be printed and approved. Prior to printing, you should delete all [....] prompt text. Saving the Project Quality Plan document under its own name Save the Project Quality Plan document by selecting the “SAVEAS” command; this will avoid overwriting the standard template. You must specify your own Project Directory. Once your Project Quality Plan Document is completed check the document against the following Quality Criteria:
Insert Project Name Project Quality Plan Date: 22 March 2010
Page 2
Insert Project Name Project Quality Plan Date: 22 March 2010 1 Project Quality Plan History
This document is only valid on the day it was printed. The source of the document will be found on the project's PC in location
Date of this revision: Date of Next revision: Revision date Previous revision date Summary of Changes Changes marked First issue
This document requires the following approvals. Signed approval forms are filed in the Management section of the project files. Name Signature Title Date of Issue Version
This document has been distributed to: Name Title Date of Issue Version Page 3
Insert Project Name Project Quality Plan Date: 22 March 2010 Project Quality Plan
[The Project Quality Plan is part of the Project Initiation Document (PID) The purpose is to define the quality techniques and standards to be applied and the various responsibilities for achieving the required quality levels during the project]
[Define the roles and names those responsible for ensuring that all quality aspects of the project are set up and managed. Defined areas of quality should be allocated to appropriate functions, groups or individuals both within and external to the project]
[State here the methods by which products will be tested against their quality specifications to ensure quality requirements are met. This should include all specialist, management and quality products]
[State any particular requirements that may be applicable to third party suppliers, e.g. how the contracted work will be subjected to project control. Indicate any particular lines of communication and specify method of progress reporting]
[Document the method by which Change Management will operate. Make reference to any existing Change Management Procedures and confirm that they are compatible with Page 5
Insert Project Name Project Quality Plan Date: 22 March 2010 the PRINCE2 technique of Change Control. Include any individual or group responsibilities]
[Allocate responsibilities for Configuration Management to appropriate functions, groups or individuals. Include any interfaces with existing Configuration Management systems and list those products that will come under Configuration Management Control]
[Briefly describe any tools to be used to ensure quality] Page 6