An overview of Scope Management, a crucial process in project delivery. It explains the purpose of a Scope Management Plan, the role of a Project Manager, and the steps to create a Scope Management Plan, including defining the scope, creating the Scope Management Plan narrative, and creating the Major Deliverables Matrix. The document also discusses the benefits of Value Engineering and includes a class exercise.
Typology: Study notes
1 / 17
This page cannot be seen from the preview
Don't miss anything!










2
Project Delivery Plan
Risk Management
Roles & Responsibilities
3.
Scope Management
Cost Management
Schedule Management
Change Management
Procurement Management
Communications Management
Quality Management
Transition to Construction Plan
Recognize the value and purpose of a ScopeManagement Plan
Be able to prepare a Scope Management Plan
Fully defines the work to beaccomplished (Gets everyone on thesame page)
Defines deliverables needed toachieve the work
Provides a basis for estimatingschedule and budget
Collect requirements and developa Scope Management Plan.
7
Validate and control Scope.Manage Scope changes.
Initiate and leadScope definition.
8
The CDOT PM is typically handed a scope overview,with start & end mileposts, and a generaldescription of the project. It is up to the PM andteam to develop a more detailed scopedescription, within those parameters. Scopedefinition discussions are part of the DSR/ScopingMeeting. Sometimes Kick-off or pre-scopingmeetings are held in advance of the DSR Meeting.
CDOT checklists and resources include Forms 463,1048, 1299, the
Project Development Manual, etc
How do you create a Scope Management Plan?
When the Scope details have been agreed to, the PM cansolicit team input to determine the deliverables needed toaccomplish the scope.
This information will be used to customize the template tocreate a Major Deliverables Matrix.
How do you create a Scope Management Plan?
How do you create a Scope Management Plan?
V
alue Engineering (VE)
is a systematic project review conducted
during preliminary design by an independent team of experts.Projects with Total Cost > $40 million are required to have a formal ValueEngineering (VE) study.
Project Managers should consider whether a VE study
could be beneficial to a project, even when it is not required.The outcome of a VE study could impact project scope and should be conducted asearly as possible.Benefits of VE include: •^
Providing the desired functions safely, reliably, efficiently, and at the lowestoverall cost,
-^
Improving the value and quality of the project, and/or
-^
Reducing the time needed to complete the project.
For more information, visit:
https://www.fhwa.dot.gov/ve/ andhttps://www.codot.gov/business/designsupport/valueengineering
Bonus: For each box cars or snake eyes rolled, the person to the left ofthe dice roller must loudly proclaim his/her love of Justin Bieber.
A thorough definition of project scope
Description of the work and deliverables required to achievethe Scope This process of Scope Management helps a PM to keep a projecton track to meet goals and objectives.
Questions/Discussion