Systems are created to solve problems. One can think of the sys- tems approach as an organized way of dealing with a problem. In this dynamic world, the subject System Analysis and Design (SAD), mainly deals with the software development activities.
1.2 OBJECTIVES
After going through this lesson, you should be able to
l define a system
l explain the different phases of system development life cycle
l enumerate the components of system analysis
l explain the components of system designing
1.3 DEFINING A SYSTEM
A collection of components that work together to realize some objec- tives forms a system. Basically there are three major components in every system, namely input, processing and output.
Fig. 1.1: Basic System Components
Input (^) Processing Output
2 :: Computer Applications
In a system the different components are connected with each other and they are interdependent. For example, human body represents a complete natural system. We are also bound by many national systems such as political system, economic system, educational sys- tem and so forth. The objective of the system demands that some output is produced as a result of processing the suitable inputs. A well-designed system also includes an additional element referred to as ‘control’ that provides a feedback to achieve desired objectives of the system.
1.4 SYSTEM LIFE CYCLE
System life cycle is an organizational process of developing and main- taining systems. It helps in establishing a system project plan, be- cause it gives overall list of processes and sub-processes required for developing a system.
System development life cycle means combination of various activi- ties. In other words we can say that various activities put together are referred as system development life cycle. In the System Analy- sis and Design terminology, the system development life cycle also means software development life cycle.
Following are the different phases of system development life cycle:
l Preliminary study l Feasibility study l Detailed system study l System analysis l System design l Coding l Testing l Implementation l Maintenance
The different phases of system development life cycle is shown in Fig. 1.2 below.
Fig. 1.2: Phases of System Development Life Cycle
System Study
Feasibility Study
System Analysis
System Design
Maintenance
Implementation
Testing
Software Development Life Cycle
Coding
4 :: Computer Applications
next phase is to examine the feasibility of the system. The feasibility study is basically the test of the proposed system in the light of its workability, meeting user’s requirements, effective use of resources and of course, the cost effectiveness. These are categorized as tech- nical, operational, economic and schedule feasibility. The main goal of feasibility study is not to solve the problem but to achieve the scope. In the process of feasibility study, the cost and benefits are estimated with greater accuracy to find the Return on Investment (ROI). This also defines the resources needed to complete the de- tailed investigation. The result is a feasibility report submitted to the management. This may be accepted or accepted with modifica- tions or rejected. The system cycle proceeds only if the manage- ment accepts it.
(c) Detailed System Study
The detailed investigation of the system is carried out in accordance with the objectives of the proposed system. This involves detailed study of various operations performed by a system and their rela- tionships within and outside the system. During this process, data are collected on the available files, decision points and transactions handled by the present system. Interviews, on-site observation and questionnaire are the tools used for detailed system study. Using the following steps it becomes easy to draw the exact boundary of the new system under consideration:
l Keeping in view the problems and new requirements l Workout the pros and cons including new areas of the system
All the data and the findings must be documented in the form of detailed data flow diagrams (DFDs), data dictionary, logical data struc- tures and miniature specification. The main points to be discussed in this stage are:
l Specification of what the new system is to accomplish based on the user requirements.
l Functional hierarchy showing the functions to be performed by the new system and their relationship with each other.
l Functional network, which are similar to function hierarchy but they highlight the functions which are common to more than one procedure.
l List of attributes of the entities – these are the data items which need to be held about each entity (record)
Introduction to System Analysis and Design :: 5
(d) System Analysis
Systems analysis is a process of collecting factual data, understand the processes involved, identifying problems and recommending fea- sible suggestions for improving the system functioning. This involves studying the business processes, gathering operational data, un- derstand the information flow, finding out bottlenecks and evolving solutions for overcoming the weaknesses of the system so as to achieve the organizational goals. System Analysis also includes sub- dividing of complex process involving the entire system, identifica- tion of data store and manual processes.
The major objectives of systems analysis are to find answers for each business process: What is being done, How is it being done, Who is doing it, When is he doing it, Why is it being done and How can it be improved? It is more of a thinking process and involves the creative skills of the System Analyst. It attempts to give birth to a new effi- cient system that satisfies the current needs of the user and has scope for future growth within the organizational constraints. The result of this process is a logical system design. Systems analysis is an iterative process that continues until a preferred and acceptable solution emerges.
(e) System Design
Based on the user requirements and the detailed analysis of the existing system, the new system must be designed. This is the phase of system designing. It is the most crucial phase in the develop- ments of a system. The logical system design arrived at as a result of systems analysis is converted into physical system design. Normally, the design proceeds in two stages:
l Preliminary or General Design
l Structured or Detailed Design
Preliminary or General Design: In the preliminary or general de- sign, the features of the new system are specified. The costs of imple- menting these features and the benefits to be derived are estimated. If the project is still considered to be feasible, we move to the de- tailed design stage.
Structured or Detailed Design: In the detailed design stage, com- puter oriented work begins in earnest. At this stage, the design of the system becomes more structured. Structure design is a blue print of a computer system solution to a given problem having the
Introduction to System Analysis and Design :: 7
gram specifications into computer instructions, which we refer to as programs. It is an important stage where the defined procedures are transformed into control specifications by the help of a computer language. The programs coordinate the data movements and con- trol the entire process in a system.
It is generally felt that the programs must be modular in nature. This helps in fast development, maintenance and future changes, if required.
(g) Testing
Before actually implementing the new system into operation, a test run of the system is done for removing the bugs, if any. It is an important phase of a successful system. After codifying the whole programs of the system, a test plan should be developed and run on a given set of test data. The output of the test run should match the expected results. Sometimes, system testing is considered a part of implementation process.
Using the test data following test run are carried out:
l Program test
l System test
Program test: When the programs have been coded, compiled and brought to working conditions, they must be individually tested with the prepared test data. Any undesirable happening must be noted and debugged (error corrections)
System Test: After carrying out the program test for each of the programs of the system and errors removed, then system test is done. At this stage the test is done on actual data. The complete system is executed on the actual data. At each stage of the execu- tion, the results or output of the system is analysed. During the result analysis, it may be found that the outputs are not matching the expected output of the system. In such case, the errors in the particular programs are identified and are fixed and further tested for the expected output.
When it is ensured that the system is running error-free, the users are called with their own actual data so that the system could be shown running as per their requirements.
(h) Implementation
After having the user acceptance of the new system developed, the
8 :: Computer Applications
implementation phase begins. Implementation is the stage of a project during which theory is turned into practice. The major steps in- volved in this phase are:
l Acquisition and Installation of Hardware and Software
l Conversion l User Training
l Documentation
The hardware and the relevant software required for running the system must be made fully operational before implementation. The conversion is also one of the most critical and expensive activities in the system development life cycle. The data from the old system needs to be converted to operate in the new format of the new system. The database needs to be setup with security and recovery procedures fully defined.
During this phase, all the programs of the system are loaded onto the user’s computer. After loading the system, training of the user starts. Main topics of such type of training are:
l How to execute the package
l How to enter the data
l How to process the data (processing details) l How to take out the reports
After the users are trained about the computerized system, working has to shift from manual to computerized working. The process is called ‘Changeover’. The following strategies are followed for changeover of the system.
(i) Direct Changeover: This is the complete replacement of the old system by the new system. It is a risky approach and requires comprehensive system testing and training.
(ii) Parallel run: In parallel run both the systems, i.e., computerized and manual, are executed simultaneously for certain defined period. The same data is processed by both the systems. This strategy is less risky but more expensive because of the following:
l Manual results can be compared with the results of the com- puterized system.
10 :: Computer Applications
(d) _____________ is a blue print of a computer system. (e) In ___________ run the new system installed in parts.
(f) In parallel run computerized and ____________ systems are executed in parallel.
In this lesson a systematic approach to solve any given problem is explained. Phases of system such as preliminary system study, detailed system study, system analysis, design, coding, testing, implementation and maintenance are explained. Computer based systems are defined. System development life cycle is discussed in detail. The different phases of the development of system are explained in detail.
1.7 TERMINAL QUESTIONS
(d) structure design (e) pilot (f) manual