DESCRIPTION
A. EXCAVATION WORKS
A.1 Excavation Works
A.1.1 MANPOWER
FOREMAN 1 0.5 8 ₱94.10 ₱752.80
SKILLED LABORER 1 0.5 8 ₱68.01 ₱544.08
30.5 8 ₱52.50 ###
A.1.2 REQUIRED WORK (cu.m) 80 SUB-TOTAL: ###
A.2 BACKFILL AND COMPACTION
A.2.1 MANPOWER
FOREMAN 1 2 13 ₱94.10 ###
SKILLED LABORER 1 2 13 ₱68.01 ₱884.13
32 13 ₱52.50 ###
A.2.2 REQUIRED WORK (cu.m) 32 SUB-TOTAL: ###
A.3 GRAVEL BED
A.3.1 MANPOWER
FOREMAN 1 5 8 ₱94.10 ₱752.80
SKILLED LABORER 1 5 8 ₱68.01 ₱544.08
35 8 ₱52.50 ###
A.3.2 REQUIRED WORK (cu.m) 8 SUB-TOTAL: ###
B. CONCRETE WORKS
B.1
B.1.1 MANPOWER
FOREMAN 1 8.54 11 ₱94.10 ###
SKILLED LABORER 2 8.54 11 ₱68.01 ###
68.54 11 ₱52.50 ###
B.1.2 REQUIRED WORK (cu.m) 10.63 SUB-TOTAL: ###
B.2
B.2.1 MANPOWER
FOREMAN 1 8.54 4 ₱94.10 ₱376.40
SKILLED LABORER 2 8.54 4 ₱68.01 ₱544.08
NO. OF
UNITS
PRODUCT
IVITY
OUTPUT
NO. OF
HOUR/S
HOURLY
RATE
AMOUNT
(PHP)
UNSKILLED
LABORER
UNSKILLED
LABORER
UNSKILLED
LABORER
FOOTING
S
UNSKILLED
LABORER
FOOTING TIE
BEAMS
pf3
pf4
pf5
pf8
pf9
pfa
pfd

Partial preview of the text

Download Two-torey house estimation and more Exercises Mathematics in PDF only on Docsity!

DESCRIPTION

A. EXCAVATION WORKS

A.1 Excavation Works

A.1.1 MANPOWER

FOREMAN 1 0.5 8 ₱94.10 ₱752.

SKILLED LABORER 1 0.5 8 ₱68.01 ₱544.

A.1.2 REQUIRED WORK (cu.m) 80 SUB-TOTAL: ###

A.2 BACKFILL AND COMPACTION

A.2.1 MANPOWER

FOREMAN 1 2 13 ₱94.10

SKILLED LABORER 1 2 13 ₱68.01 ₱884.

A.2.2 REQUIRED WORK (cu.m) 32 SUB-TOTAL: ###

A.3 GRAVEL BED

A.3.1 MANPOWER

FOREMAN 1 5 8 ₱94.10 ₱752.

SKILLED LABORER 1 5 8 ₱68.01 ₱544.

A.3.2 REQUIRED WORK (cu.m) 8 SUB-TOTAL: ###

B. CONCRETE WORKS

B.

B.1.1 MANPOWER

FOREMAN 1 8.54 11 ₱94.10

SKILLED LABORER 2 8.54 11 ₱68.01

B.1.2 REQUIRED WORK (cu.m) 10.63 SUB-TOTAL: ###

B.

B.2.1 MANPOWER

FOREMAN 1 8.54 4 ₱94.10 ₱376.

SKILLED LABORER 2 8.54 4 ₱68.01 ₱544.

NO. OF

UNITS

PRODUCT

IVITY

OUTPUT

NO. OF

HOUR/S

HOURLY

RATE

AMOUNT

(PHP)

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

FOOTING

S

UNSKILLED

LABORER

FOOTING TIE

BEAMS

B.2.2 REQUIRED WORK (cu.m) 4.06 SUB-TOTAL: ###

B.

B.3.1 MANPOWER

FOREMAN 1 5 8 ₱94.10 ₱752.

SKILLED LABORER 2 5 8 ₱68.01

B.3.2 REQUIRED WORK (cu.m) 13.65 SUB-TOTAL: ###

B.

B.4.1 MANPOWER

FOREMAN 1 16.7 18 ₱94.10

SKILLED LABORER 2 16.7 18 ₱68.01

B.4.2 REQUIRED WORK (cu.m) 9.19 SUB-TOTAL: ###

B.5 BEAMS

B.5.1 MANPOWER

FOREMAN 1 16.7 7 ₱94.10 ₱658.

SKILLED LABORER 2 16.7 7 ₱68.01 ₱952.

B.5.2 REQUIRED WORK (cu.m) 3.68 SUB-TOTAL: ###

B.6 CONCRETE STAIRS

B.5.1 MANPOWER

FOREMAN 1 16.7 4 ₱94.10 ₱376.

SKILLED LABORER 2 16.7 4 ₱68.01 ₱544.

B.5.2 REQUIRED WORK (cu.m) 1.93 SUB-TOTAL: ###

B.7 COLUMNS

B.7.1 MANPOWER

FOREMAN 1 16.7 18 ₱94.10

UNSKILLED

LABORER

GROUND

SLAB

UNSKILLED

LABORER

SUSPEND

ED SLAB

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

B.4.2 REQUIRED WORK (cu.m) 8.75 SUB-TOTAL: ###

B.5 BEAMS

B.5.1 MANPOWER

FOREMAN 1 3.28 13 ₱94.10

SKILLED LABORER 2 3.28 13 ₱68.01

B.5.2 REQUIRED WORK (cu.m) 35.21 SUB-TOTAL: ###

B.6 CONCRETE STAIRS

B.5.1 MANPOWER

FOREMAN 1 3.28 6 ₱94.10 ₱564.

SKILLED LABORER 2 3.28 6 ₱68.01 ₱816.

B.5.2 REQUIRED WORK (cu.m) 14.22 SUB-TOTAL: ###

B.7 COLUMNS

B.7.1 MANPOWER

FOREMAN 1 3.28 26 ₱94.10

SKILLED LABORER 2 3.28 26 ₱68.01

B.7.2 REQUIRED WORK (cu.m) 70.08 SUB-TOTAL: ###

B.8 ROOF DECK SLAB

B.8.1 MANPOWER

FOREMAN 1 2.54 3 ₱94.10 ₱282.

SKILLED LABORER 2 2.54 3 ₱68.01 ₱408.

B.8.2 REQUIRED WORK (SQ.m) 8.75 SUB-TOTAL: ###

D. FORMWORKS STRIPPING

B.

B.1.1 MANPOWER

FOREMAN 1 1 4 ₱94.10 ₱376.

SKILLED LABORER 2 1 4 ₱68.01 ₱544.

B.1.2 REQUIRED WORK (cu.m) 27.90 SUB-TOTAL: ###

B.

B.2.1 MANPOWER

FOREMAN 1 1 4 ₱94.10 ₱376.

SKILLED LABORER 2 1 4 ₱68.01 ₱544.

B.2.2 REQUIRED WORK (cu.m) 30.81 SUB-TOTAL: ###

B.

B.3.1 MANPOWER

FOREMAN 1 1 2 ₱94.10 ₱188.

SKILLED LABORER 2 1 2 ₱68.01 ₱272.

B.3.2 REQUIRED WORK (cu.m) 13.00 SUB-TOTAL: ###

B.

B.4.1 MANPOWER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

FOOTING

S

UNSKILLED

LABORER

FOOTING TIE

BEAMS

UNSKILLED

LABORER

GROUND

SLAB

UNSKILLED

LABORER

SUSPEND

ED SLAB

FOREMAN 1 1 1 ₱94.10 ₱94.

SKILLED LABORER 2 1 1 ₱68.01 ₱136.

B.4.2 REQUIRED WORK (cu.m) 8.75 SUB-TOTAL: ₱545.

B.5 BEAMS

B.5.1 MANPOWER

FOREMAN 1 1 4 ₱94.10 ₱376.

SKILLED LABORER 2 1 4 ₱68.01 ₱544.

B.5.2 REQUIRED WORK (cu.m) 35.21 SUB-TOTAL: ###

B.6 CONCRETE STAIRS

B.5.1 MANPOWER

FOREMAN 1 1 2 ₱94.10 ₱188.

SKILLED LABORER 2 1 2 ₱68.01 ₱272.

B.5.2 REQUIRED WORK (cu.m) 14.22 SUB-TOTAL: ###

B.7 COLUMNS

B.7.1 MANPOWER

FOREMAN 1 1 8 ₱94.10 ₱752.

SKILLED LABORER 2 1 8 ₱68.01

B.7.2 REQUIRED WORK (cu.m) 70.08 SUB-TOTAL: ###

B.8 ROOF DECK SLAB

B.8.1 MANPOWER

FOREMAN 1 1 1 ₱94.10 ₱94.

SKILLED LABORER 2 1 1 ₱68.01 ₱136.

B.8.2 REQUIRED WORK (SQ.m) 8.75 SUB-TOTAL: ₱545.

D.9 COLUMNS

D.9.1 MANPOWER

FOREMAN 1 1 1 ₱94.10 ₱94.

SKILLED LABORER 2 1 1 ₱68.01 ₱136.

D.9.2 REQUIRED WORK (sq.m) 1 SUB-TOTAL: ₱545.

E. MASONRY

E.1 CHB LAYING (4")

E.1.1 MANPOWER

FOREMAN 1 10 72 ₱94.10

SKILLED LABORER 2 10 72 ₱68.01

E.1.2 REQUIRED WORK (cu.m) 64.5 SUB-TOTAL: ###

E.2 CHB LAYING (6")

E.2.1 MANPOWER

FOREMAN 1 9 220 ₱94.10

SKILLED LABORER 2 9 220 ₱68.01

E.2.2 REQUIRED WORK (cu.m) 219.58 SUB-TOTAL: ###

E.3 PLASTERING(4")

E.3.1 MANPOWER

FOREMAN 1 10 72 ₱94.10

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

UNSKILLED

LABORER

B.7.1 MANPOWER

FOREMAN 1 0.8 202 ₱94.10

SKILLED LABORER 2 0.8 202 ₱68.01

B.7.2 REQUIRED WORK (kgs) 2264.40 SUB-TOTAL: ###

B.8 ROOF DECK SLAB

B.8.1 MANPOWER

FOREMAN 1 0.8 40 ₱94.10

SKILLED LABORER 2 0.8 40 ₱68.01

B.8.2 REQUIRED WORK (kgs) 444.72 SUB-TOTAL: ###

UNSKILLED

LABORER

UNSKILLED

LABORER

Productivity Output

STRUCTURAL EXCAVATION

HAND 6

MACHINE 0.

STRUCTURAL BACKFILL

BY HAND 5

BY MACHINE 2

TRENCHING

BY HAND 6

BY MACHINE 0.

EXCAVATION-MANUAL

COMMON EARTH 8

LOAM OF SOIL 1.

ROCK 2.

EXCAVATION-MECHANICAL

COMMON EARTH 6.

BACKFILLING

COMMON MANUAL 0.

CONCRETING

GRADE MEMBERS

FORMWORKS 2.

CONCRETING 8.

REBAR 0.

FINISHING 0.

SUSPENDED MEMBERS

COMMON

EXCAVATION

MAN

HR /

CU.M.

MAN

HR /

CU.M.

ROCK

EXCCAVATION

MAN

HR /

CU.M.

HAULING OF

SPOILS

MAN

HR /

CU.M.

MAN

HR /

CU.M.

MAN

HR /

CU.M.

MAN

HR /

CU.M.

MAN

HR /

CU.M.

MAN

HR /

CU.M.

MAN

HR /

CU.M.

CLAY OR HEAVY

SOIL

MAN

HR /

CU.M.

MAN

HR /

CU.M.

MAN

HR /

CU.M.

ROCK WITH JACK

HAMMER

MAN

HR /

CU.M.

MAN

HR /

CU.M.

GRAVEL FILL

MANUAL

MAN

HR /

CU.M.

MAN

HR /

SQ.M.

MAN

HR /

CU.M.

MAN

HR /

KGS

MAN

HR /

SQ.M.

FORM WORKS FABRICATION

STRIPPING OF FORMS

WALL ON GROUND 1

WALL ABOVE 10" 1

BEAMS 1

COLUMNS 1

SUSPENDED SLAB

FINISHING AND MASONRY

4" CHB

LAYING 8-

TOOLING 11-

PLASTERING 8-

6" CHB

LAYING 7-

TOOLING 11-

PLASTERING 8-

8" CHB

LAYING 6-

TOOLING 11-

PLASTERING 8-

WOOD WALL AND

PARTITION

MAN

HR /

SQ.M.

FORMWORKS

FABRICATION

MAN

HR /

SQ.M.

MAN

HR /

SQ.M.

MAN

HR /

SQ.M.

MAN

HR /

SQ.M.

MAN

HR /

SQ.M.

SUSPENDED SLAB

MAN

HR /

SQ.M.

SUSPENDED SLAB

10-36" UP

MAN

HR /

SQ.M.

ELEVATED &

SHORED SLAB

FORMING - STRIP

OF FORMS

MAN

HR /

SQ.M.

FLOOR SLAB AT

GRADE - STRIP

OF FORMS

MAN

HR /

SQ.M.

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY

SQ.M /

DAY