A comprehensive overview of the regulations governing underground storage tanks (usts) in california. It covers a wide range of topics, including the requirements for installing, repairing, and monitoring usts, as well as the various methods and systems that must be in place to prevent and detect leaks. The document also addresses the responsibilities of tank owners and operators, the role of regulatory agencies, and the penalties for non-compliance. By studying this document, readers can gain a thorough understanding of the complex regulatory framework surrounding usts, which is essential for ensuring the safe and environmentally responsible management of these critical infrastructure components.

Typology: Exams

2023/2024

Available from 08/12/2024

kelvin-smith-3
kelvin-smith-3 🇺🇸

1

(2)

3.4K documents

1 / 17

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
UST INSPECTOR TEST Questions and Answers
Latest Update 2024 100% Verified Solutions
GRADE A+
How long does an owner have to fix a significant violation that does not pose
an imminent threat to human health and safety or environment before being
issued a red tag?
a) 24 hours
b) 48 hours
c) 7 days
d) 30 days - correct answers c) 7 days; CCR 2717.1(b)
Which one of the following can perform ELD?
a) licensed tank tester
b) licensed state contractor
c) ICC certified service technician
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff

Partial preview of the text

Download Underground Storage Tank (UST) Regulations and more Exams Nursing in PDF only on Docsity!

UST INSPECTOR TEST Questions and Answers

Latest Update 2024 100% Verified Solutions

GRADE A+

How long does an owner have to fix a significant violation that does not pose an imminent threat to human health and safety or environment before being issued a red tag? a) 24 hours b) 48 hours c) 7 days d) 30 days - correct answers c) 7 days; CCR 2717.1(b) Which one of the following can perform ELD? a) licensed tank tester b) licensed state contractor c) ICC certified service technician

d) Professional Engineer - correct answers a) licensed tank tester; CCR2644.1 and 2643(f); HSC 25484. Which one contains the requirements for installing, repairing, and monitoring UST's? a) Health and Safety Code Chapter 6. b) Fire Code ABCD c) California Code of Regulations Chapter 16, Title 22 d) Code of Federal Regulations, 29 Chapter 6 - correct answers a) HSC Chapter 6.7 and CCR Title 23 A monitoring system certification includes all of the following EXCEPT a) submittal of a completed Monitoring System Certification form b) pre-notification to the local agency of scheduled Monitoring System Certification date c) affixing a tag/sticker to each monitoring equipment component that is certified, repaired, or replaced d) posting the Monitoring System Certification from a visible location at the UST facility - correct answers d) posting the Monitoring System Certification from a visible location at the UST facility; CCR 2638

c) Yes, if the tank owner can demonstrate it will provide continued containment d) Yes, if the tank is less than 10,000 gallons - correct answers c) Yes, if the tank owner can demonstrate it will provide continued containment; CCR 2660(k), HSC 25296 A tank may be repaired in the following manner: a) using a 12" x 12" fiberglass cloth centered on the repair b) using tank manufacturer approved epoxy or resin c) with self tapping bolts d) all of the above - correct answers d) all of the above; CCR 2661 Which of the following is not a confined space? a) space not designed for continuous employee occupancy b) area with limited access c) area with limited ventilation d) really deep turbine sump - correct answers c) area with limited ventilation; CCR Title 8, 5157(b)

Where is a red tag applied? a) on the turbine head b) on the fill tube c) on the dispenser hose d) on the cash register - correct answers b) on the fill tube; CCR 2717.1(a) What must pressurized piping systems have installed by November 9, 2004 a) double walled spill buckets b) hydro statically lined UDC's c) line leak detectors d) automatic tank gauging - correct answers c) line leak detectors; CCR 2636 (f)(2) The local agency inspectors shall renew the ICC certification? a) by passing the inspector exam or equivalent approved criteria b) every 36 months c) via correspondence course

b) design pressure in PSIg c) usable capacity in gallons d) identity of manufacturer - correct answers a) width of the interstitial space; CCR 2631(b) Secondary containment system shall contain what amount of a tank if only one tank is located in containment? a) 50% b)100% c) 150% d) 200% - correct answers b)100%; HSC 25291(a)(3), CCR 2631(d)(1)(A) Multiple primary containers within a single secondary containment system, the secondary containment system shall be large enough to contain 150 percent of the volume of the largest primary container within it, or 10% of the aggregate internal volume of all primary containers within the secondary containment system, whichever is greater. CCR 2631(d)(1)(B) Which of the following is exempt from secondary containment testing?

a) monitored turbine sumps b) UDC's c) secondary piping d) hydrostatically monitored annulars - correct answers d) hydro statically monitored annulars; CCR 2637(g) How long does the local agency have to notify the tank owner that a red tag has been issued? a) 12 hours b) 24 hours c) 48 hours d) 5 days - correct answers b) 24 hours; CCR 2717.1(a) How long must cathodic protection maintenance records be maintained? a) 1 year b) 5 years c) 6.5 years d) 7 years - correct answers c) 6.5 years; CCR 2712(b)

According to CCR Title 23, UST Regulations, a person who performs a monitoring system certification must possess all of the following, EXCEPT a) a tank tester or contractor license b) a 40 hour OSHA Hazwoper Certificate c) an equipment manufacturer certification d) an ICC certification as California UST Service Technician - correct answers b) a 40 hour OSHA Hazwoper Certificate; CCR 2638(b) and 2715(i) An automatic shut-off device must stop the flow into the tank when the: a) tank is 90% full b) delivery truck is 95% empty c) tank is filled to no more than 95% capacity d) fuel level is 48 inches from the bottom of the tank - correct answers c) tank is filled to no more than 95% capacity; CCR 2635(b)(2)(C) A designated operator must train the employees about all of the following except: a) best management practices b) monitoring plan

c) permit conditions d) leak response plan - correct answers c) permit conditions; CCR 2715(f)(1) Secondary containment is not required on suction piping which meets all of the following, EXCEPT... a) check valve located directly below suction pump b) operating under less than atmospheric pressure c) piping is sloped to drain back to a monitored sump d) check valve located at tank bottom - correct answers d) check vale located at tank bottom; CCR 2636(a)(3) Which of the following is required to be reported to the local agency? a) release of fuel to secondary containment which able to be cleaned in 8 hours or less b) release of fuel to the environment c) presence of water in annular space d) presence of fuel in spill buckets - correct answers b) release of fuel to the environment; CCR 2650

A violation that is causing, or threatens to cause a liquid release of petroleum from an underground storage tank system is a _________ type of violation: a) Minor b) Major c) Significant d) Class II - correct answers c) Significant; CCR 2717(a) No owner or operator of a facility may deposit or allow the deposit of petroleum into an underground storage tank system that has a red tag affixed to the system's______. a) fill pipe b) dispenser c) monitoring panel d) overfill - correct answers a) fill pipe; CCR 2717.1(2) An automatic shutoff device must stop the flow into the tank when the: a) tank is 90% full b) delivery ruck is 95% empty

c) tank is filled to no more than 95% of capacity d) fuel level is 48 inches from the bottom of the tank - correct answers c) tank is filled to no more than 95% of capacity; CCR 2635(b)(2) An automatic line leak detector is required for all pressurized piping. The automatic line leak detector must be tested: a) monthly b) annually c) every 3 years d) every 5 years - correct answers b) annually; CCR 2636(f)(4) and CCR 2643(c)(3) According to Title 23, CCR, UST Regulations, results of the tank tightness testing must be retained for what period of time? a) For a period of 3 years b) For the life of the facility c) Until the next tightness test is conducted d) Until you are sure a release has not occurred - correct answers a) For a period of 3 years; CCR 2712(b)

c) the life of the tank d) the life of the warranty - correct answers c) the life of the tank; CCR 2712(b) A tank may be repaired using the interior lining method: a) twice b) once c) never d) as many times as needed - correct answers b) once; CCR 2661(c) Before affixing a red tag to an underground storage tank system, the local agency shall document the: a) date and time b) name of the attendant c) dispenser meter readings d) level of product stored in tank - correct answers d) level of product stored in tank; CCR 2717.1(c)

The secondary containment system shall be equipped with a collection system to accumulate, temporarily store, and ______ within the system. a) permit entry b) permit removal of any liquid c) permit storage of any liquid d) permit access to any liquid - correct answers b) permit removal of any liquid; CCR 2631(d)(4)