SAP Project Systems User Training Manual, Study Guides, Projects, Research of Project Management

A brief user training manual for sap project systems, focusing on purchase requisition processes within the sap environment. It outlines the steps for changing network activities, creating external services, and purchasing external materials from vendors outside ptcl. The manual includes instructions for entering transaction codes, navigating tabs, inputting service details, and releasing activities to generate purchase requisitions. It is a concise guide for users involved in sap project management and procurement processes, offering step-by-step instructions for specific tasks within the system. Intended to aid users in efficiently managing project-related purchases and services within the sap environment, ensuring accurate and timely processing of requisitions.

Typology: Study Guides, Projects, Research

2025/2026

Available from 12/29/2025

islam0307
islam0307 🇵🇰

4 documents

1 / 10

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
User Training Manual
Purchase Requisition for Project
SAP Project systems
By:
Ghazala Saleem
Manager SAP -PS
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download SAP Project Systems User Training Manual and more Study Guides, Projects, Research Project Management in PDF only on Docsity!

User Training Manual

Purchase Requisition for Project

SAP Project systems

By: Ghazala Saleem Manager SAP - PS

1 - Enter T-code CN22 to change of network 2 - Enter the Network number 3 - Press Activity overview Tab to change/create network activities

5 - Write the description of the External Activity and keep the Services Check Box on in case of services

6 - Enter the Material group number and Purchasing group number 7 - Enter the respective WBS Element of the network and press enter.

10 - Press the Back button to go to the main form 11 - On pressing Back Button, a screen will pop up showing the details of the activities. The PR is not created yet as Requisition tab is still void. Activity is on Created status, You have to release the Activity to get system auto generated PR. Press the check sign, and save the External service. (You can again press the Service view Tab to go in services entry data form)

12 - Select the line item; go to MENU BAR-->EDIT-->STATUS-->RELEASE, and SAVE this.

14 - System is on Release status and PR is auto generated. END