What is a statutory document? -Correct Answers>>>LEGAL - H&S at Work
Act, EAWR
What is a non statutory document? -Correct Answers>>>Not Legal - BS7671,
On-Site Guide, Guidance Note 3, GS 38
What equipment is used for safe isolation? -Correct Answers>>>
1) approved Voltage indicator
2) proving unit
3) lock and key device
4) warning notices
5) relevant PPE
Process of Safe Isolation? -Correct Answers>>>
1) identify means of isolation - determine what is to be worked on
2) obtain permission to isolate
3) switch off
4) lock off
5) secure key - keep on person
6) select approved voltage indicator
7) test voltage indicator on known source (proving unit)
8) test between all conductors (3 test for single phase, 10 tests for 3 phase)
9) re-test voltage indicator
pf2

Partial preview of the text

Download 2365-614 (Unit 304) - INSPECTION, TESTING AND INITIAL VERIFICATION and more Exams Advanced Education in PDF only on Docsity!

Page 1

2365 - 614 (Unit 304) - INSPECTION,

TESTING AND INITIAL VERIFICATION

What is a statutory document? - Correct Answers>>>LEGAL - H&S at Work Act, EAWR

What is a non statutory document? - Correct Answers>>>Not Legal - BS7671, On-Site Guide, Guidance Note 3, GS 38

What equipment is used for safe isolation? - Correct Answers>>>

  1. approved Voltage indicator

  2. proving unit

  3. lock and key device

  4. warning notices

  5. relevant PPE

Process of Safe Isolation? - Correct Answers>>>

  1. identify means of isolation - determine what is to be worked on

  2. obtain permission to isolate

  3. switch off

  4. lock off

  5. secure key - keep on person

  6. select approved voltage indicator

  7. test voltage indicator on known source (proving unit)

  8. test between all conductors (3 test for single phase, 10 tests for 3 phase)

  9. re-test voltage indicator

Page 2

Explain all supply systems - Correct Answers>>>TN-S:

Cable sheath earth (usually 2 core SWA). Zs path is via the cable sheathing. Max Ze = 0.8 ohm

TN-C-S:

Concentric cable (CNE). Middle core is line conductor, outer core is combined N and E. Zs path is through the earth into the N &E conductor in CNE cable. Max Ze = 0.35 ohm

TT:

Local earth electrode. Zs path is through general mass of earth to electrode at substation. Max Ze = 200 ohm