What is a statutory document? - Correct Answers>>>LEGAL - H&S at Work Act, EAWR
What is a non statutory document? - Correct Answers>>>Not Legal - BS7671, On-Site Guide, Guidance Note 3, GS 38
What equipment is used for safe isolation? - Correct Answers>>>
approved Voltage indicator
proving unit
lock and key device
warning notices
relevant PPE
Process of Safe Isolation? - Correct Answers>>>
identify means of isolation - determine what is to be worked on
obtain permission to isolate
switch off
lock off
secure key - keep on person
select approved voltage indicator
test voltage indicator on known source (proving unit)
test between all conductors (3 test for single phase, 10 tests for 3 phase)
re-test voltage indicator
Page 2
Explain all supply systems - Correct Answers>>>TN-S:
Cable sheath earth (usually 2 core SWA). Zs path is via the cable sheathing. Max Ze = 0.8 ohm
Concentric cable (CNE). Middle core is line conductor, outer core is combined N and E. Zs path is through the earth into the N &E conductor in CNE cable. Max Ze = 0.35 ohm
Local earth electrode. Zs path is through general mass of earth to electrode at substation. Max Ze = 200 ohm