2365-614 (Unit 304) - INSPECTION, TESTING AND INITIAL VERIFICATION What is a statutory document? - LEGAL - H&S at Work Act, EAWR What is a non statutory document? - Not Legal - BS7671, On-Site Guide, Guidance Note 3, GS 38 What equipment is used for safe isolation? - 1) approved Voltage indicator
Concentric cable (CNE). Middle core is line conductor, outer core is combined N and E. Zs path is through the earth into the N &E conductor in CNE cable. Max Ze = 0.35 ohm TT: Local earth electrode. Zs path is through general mass of earth to electrode at substation. Max Ze = 200 ohm