2ND STAGE APPRENTICE LINEMAN
STUDY GUIDE WITH COMPLETE
SOLUTIONS
When are rubber blankets due for retesting? - Correct Answers -Annually
What are the three glove tests that must be performed? - Correct Answers -Physical,
mechanical and visual
Class 2 (yellow) rubber gloves are tested at _____v and rated use is ____v - Correct
Answers -20,000VAC and 17,000 rated volts
Rubber gloves are due for testing ____ days after the test date - Correct Answers -90
days
When are you able to leave the the radio after calling for help? - Correct Answers -After
the dispatcher verifies your information
Name the steps of pole top rescue - Correct Answers -1. Evaluate the situation
2. call for help
3. provide for your protection
4. Climb to rescue position
5. Determine injureds condition (conscious or unconscious and are they breathing/ heart
beating)
6. give first aid if needed
7. lower man (position handline)
8. give follow up care
When installing cover over secondaries, which conductor shall be covered first? -
Correct Answers -Conductor nearest to employee
What are two major types of fuse switches? - Correct Answers -Enclosed and open
What type of switch has a fused clip and holder mounted completely within a porcelain
box or casting? Where are these typically found? - Correct Answers -Enclosed
switches, 4kv areas
600 amp disconnect switches make it possible to? - Correct Answers -1. Isolate
sections of a line to locate trouble
2. de-Energize a section while maintaining normal service on the remainder
pf3
pf4
pf5

Partial preview of the text

Download 2ND STAGE APPRENTICE LINEMAN STUDY GUIDE WITH COMPLETE SOLUTIONS and more Exams Advanced Education in PDF only on Docsity!

2ND STAGE APPRENTICE LINEMAN

STUDY GUIDE WITH COMPLETE

SOLUTIONS

When are rubber blankets due for retesting? - Correct Answers - Annually What are the three glove tests that must be performed? - Correct Answers - Physical, mechanical and visual Class 2 (yellow) rubber gloves are tested at _____v and rated use is ____v - Correct Answers - 20,000VAC and 17,000 rated volts Rubber gloves are due for testing ____ days after the test date - Correct Answers - 90 days When are you able to leave the the radio after calling for help? - Correct Answers - After the dispatcher verifies your information Name the steps of pole top rescue - Correct Answers - 1. Evaluate the situation

  1. call for help
  2. provide for your protection
  3. Climb to rescue position
  4. Determine injureds condition (conscious or unconscious and are they breathing/ heart beating)
  5. give first aid if needed
  6. lower man (position handline)
  7. give follow up care When installing cover over secondaries, which conductor shall be covered first? - Correct Answers - Conductor nearest to employee What are two major types of fuse switches? - Correct Answers - Enclosed and open What type of switch has a fused clip and holder mounted completely within a porcelain box or casting? Where are these typically found? - Correct Answers - Enclosed switches, 4kv areas 600 amp disconnect switches make it possible to? - Correct Answers - 1. Isolate sections of a line to locate trouble
  8. de-Energize a section while maintaining normal service on the remainder
  1. provide emergency feeds from adjacent lines
  2. disconnect equipment from a line Pole grounds are potential hazards and should always be avoided or ____? - Correct Answers - Covered What are three groups of factors that contribute to reducing the risk of falls? - Correct Answers - Personal, environmental and engineering controls When should you wear your personal fall protection equipment? - Correct Answers - When exposed to a fall greater than 4 feet Free fall must be limited to how many feet? - Correct Answers - 6 feet or less A tie off using a knot in the lanyard or lifeline can reduce the strength of the line by? - Correct Answers - 80% or more To operate the controls it a bucket truck you must first depress the ____? - Correct Answers - Safety interlock trigger The safety interlock trigger can only be depressed and released if the control lever is in what position? - Correct Answers - Neutral position Which boom should be raised first? - Correct Answers - Upper boom Which boom should be lowered into its travel cradle first? - Correct Answers - Lower boom What is the most common roller used at ameren? - Correct Answers - Sherman and Reilly Model XS- 100 A stringing roller mounted on a cross arm may be positioned at how many different angles? - Correct Answers - Five When a roller is suspended from a horizontal line post insulator you must first install a ___? - Correct Answers - Ball Clevis What type of grip has been developed to provide a safe and convenient means of joining the pulling rope and conductor for stringing operations? - Correct Answers - Kellems grip Which type of kellems grip are used on rope? - Correct Answers - Single braid Which type of kellems grip is used for conductors and is triple braided for 1/3 if their length, double braided for the middle 1/3 and single braided for the final 1/3 of it's length at its open end? - Correct Answers - Conductor grip

What bolt combination is used to mount a 600amp disconnect switch? - Correct Answers - (4) 7 1/2" carriage bolts, flat washers, lock washer and nuts When positioning a 600 amp switch, which way should it open in relation to a lightening arrester? - Correct Answers - Away from the lightening arrester Normally, 600amp switches open in which direction with relation to the normal feed direction? - Correct Answers - Opposite (open switch hangs dead) Switch lead sizes are related to their corresponding _____? - Correct Answers - Conductor size To keep your distance between you and the car ahead, you must maintain? - Correct Answers - At least one car length for each 10mph of speed What are the three positions of the directional control on a winch? - Correct Answers - Take up, neutral and pay out What type of transformers are connected to the primary phase conductors THROUGH protective devices including; a primary fuse cutout and surge (lightening) arrester? - Correct Answers - Conventional Transformer What type of transformer is also connected to the primary phase wire through protective devices and installed AS PART OF the transformer? - Correct Answers - Protected Transformer What transformer has a built in internal primary fuse link and secondary breaker for protection against secondary overloads and faults? - Correct Answers - Completely Self Protected Transformer What are four basic components common to all transformers? - Correct Answers - 1. Core

  1. Coils
  2. Oil
  3. Tank Where is the x1 bushing on a transformer with additive polarity located? - Correct Answers - On the right side I.e. X3, X2, X What type of transformer is used to step-down high electrical values and used for metering purposes? - Correct Answers - Instrument Transformer What type of transformer is used to reduce high amperage down to a value that can be safely handled by metering devices and instruments? - Correct Answers - Current Transformer

What are the two types of CT's used on secondary circuits? - Correct Answers - Window (donut) and Bar type CT's must be _____ before energizing the service? - Correct Answers - Shunted Each CT has a polarity marking (painted white dot on one end) and must be facing which direction? - Correct Answers - Same direction At what location should phase rotation be taken? - Correct Answers - Where there will be no changes made What must be performed prior to attaching the rotation meter to a service? - Correct Answers - A voltage check To change direction of rotation on a three phase 3-wire delta service, you should swap?

  • Correct Answers - The two ungrounded phase legs on the secondary side To change direction of rotation on a three phase 4 wire wye service, you should swap? - Correct Answers - Any two phases on the secondary side One luminous energy occurrence on one square foot of area produces an illumination of? - Correct Answers - One foot candle (FC) What must be performed to a customers main/breaker switch (when practical) and meter base before energizing the service? - Correct Answers - A visual check What are the 5 tests to verify if a meter can be installed in an energized meter socket? - Correct Answers - 1. Source Voltage (phase to ground) line side
  1. Source Voltage (phase to phase) line side
    1. Back-feed, load side
    2. Grounds/load
  2. Customer Shorts (Shunted)
  • set meter and check that voltage goes through meter