Flashcard questions and complete solutions related to pjm (pjm interconnection) generation dispatch. It covers topics such as restoration process, black start restoration, system blackouts, and communication paths during restoration. The questions address various scenarios and requirements for black start units, dynamic reserves, and restoration strategies. This material is useful for individuals preparing for exams or seeking to deepen their understanding of power system restoration and dispatch operations within the pjm framework. It provides practical insights into the challenges and considerations involved in maintaining grid stability and reliability.
Typology: Exams
1 / 62
This page cannot be seen from the preview
Don't miss anything!























































Which,of,the,following,statements,is,correct,concerning,PJM,assuming,frequency,control,of,the,restorati on,process? A),PJM,assumes,control,once,an,external,transmission,tie,has,been,established. B),Once,an,Area,Control,Error,can,be,calculated,,PJM,will,assume,control. C),Whenever,it,becomes,too,much,of,a,burden,for,any,one,Transmission,Owner,within,the,RTO D),Whenever,the,Transmission,Owners,within,the,RTO,agree,to,let,PJM,control,the,process.,,ANS,- ,C),Whenever,it,becomes,too,much,of,a,burden,for,any,one,Transmission,Owner,within,the,RTO During,black,start,restoration,,priority,access,to,cranking,power,should,be,given,to: A),Hot,units,that,can,return,to,service,immediately. B),Combustion,turbines,in,areas,where,the,initial,disturbance,occurred C)Units,with,black,start,capability D),Hydro,Units,,ANS,-,A),Hot,units,that,can,return,to,service,immediately. During,a,restoration,,if,you,are,presented,with,the,opportunity,to,re- connect,with,the,Eastern,Interconnection,,you,should: A)Not,pursue,this,opportunity,because,you,may,cause,the,Eastern,Interconnection,to,become,unstable. B),Pursue,this,opportunity,only,when,you,have,adequate,Dynamic,Reserves,on,your,system C),Pursue,this,opportunity,as,quickly,as,possible D),Pursue,this,opportunity,only,if,you,need,cranking,power,for,your,generating,unity,,ANS,- ,C),Pursue,this,opportunity,as,quickly,as,possible Complete,(Total,System),Blackouts,are,characterized,by,which,of,the,following?
1 ,-,Most,common,type,of,blackout 2 ,-,May,require,coordinating,multiple,islands 3 ,-,Likely,to,result,in,Transmission,overloads,or,other,issues 4 ,-,Affects,a,very,large,geographical,area,,and,many,customers 5 ,-,Most,commonly,caused,by,human,or,switching,errors A), 1 ,&, 3 B), 2 ,&, 4 C), 3 ,&, 5 D), 1 ,,ANS,-,B), 2 ,&, 4 The,first,step,in,a,system,restoration,would,be,to: A),Immediately,notify,the,media,of,the,event B),Restore,as,much,of,the,area,load,as,possible C),Restore,as,much,under-frequency,load,as,possible D),Verify,that,communication,is,functional,with,your,neighbors,,ANS,- ,D),Verify,that,communication,is,functional,with,your,neighbors Why,would,an,offsite,power,to,generating,facilities,be,a,priority,during,the,restoration,process? A),To,provide,safe,shutdown,power,for,the,units B),To,meet,FERC,requirements C),To,provide,adequate,lighting,for,the,plant,operators,to,attempt,a,restart D),To,prepare,and,expedite,the,return,of,the,unit,,ANS,- ,D),To,prepare,and,expedite,the,return,of,the,unit Factors,that,help,determine,the,sequence,of,restoration,of,off-line,generation,include,(Pick,2):
C),1,, 3 ,and, 4 D),2,, 3 ,and, 4 ,,ANS,-,B),1,, 2 ,and, 4 During,system,restoration,,the,two,categories,of,reserves,are: A),dynamic,and,secondary B),spinning,and,quick,start C),dynamic,and,spinning D),spinning,and,primary,,ANS,-,C),dynamic,and,spinning During,a,system,restoration,you,have,400MW,of,Steam,capacity,,350MW,of,CT,capacity,and,300MW,of, Hydro,capacity,restored.,Your,largest,contingency,is,a,200MW,Steam,Unit.,You,have,also,restored,150M W,of,under-frequency,load.,What,is,your,total,dynamic,reserve?,(Load,pick- up,factors,are,5%,for,steam,,15%,for,hydro,and,25%,for,CT) A),142.5MW B),152.5MW C),285MW D),292.5MW,,ANS,-,C),285MW What,is,the,most,critical,communication,path,when,restoring,large,load,blocks,early,in,a,system,restorat ion? A),Between,the,Generating,Unit,and,the,Transmission,Owner B),Between,PJM,and,the,generating,plant C),Between,the,Generator,Owner,(or,MOC),and,the,generating,unit D),Between,the,transmission,owner,and,the,MOC,,ANS,- ,A),Between,the,Generating,Unit,and,the,Transmission,Owner
Your,entire,system,has,blacked,out,due,to,an,event.,You,receive,word,from,PJM,that,the,entire,region,is ,affected,as,well.,Your,blackstart,generation,resources,are,spread,throughout,your,system,,which,cover, a,large,area.,Which,restoration,strategy,would,be,the,best,for,you,to,implement? A),Combination,approach B),Bottom-up,Core,Island,approach C),Top-down,approach D),Bottom-up,Multiple,Island,approach,,ANS,-,D),Bottom-up,multiple,island,approach During,a,system,restoration,,which,entity,directs,the,loading,of,generation,,to,match,the,load,restored? A),PJM B),The,Generating,Unit C),The,Transmission,Owner D),The,Generation,Owner,(or,MOC),,ANS,-,C),The,Transmission,Owner Your,entire,system,has,blacked,out,due,to,an,event.,You,receive,information,the,your,neighboring,syste ms,are,also,blacked,out.,Your,main,urban,load,center,restoration,strategy,would,be,the,best,for,you,to,i mplement? A),Combination,approach B),Bottom-up,Core,Island,approach C),Top-down,approach D),Bottom-up,Multiple,Island,approach,,ANS,-,B),Bottom-up,Core,Island,approach Select,the,statement,that,best,describes,why,Minimum,Source,Requirements,have,been,established: A),To,ensure,system,stability,prior,to,interconnecting,with,another,entity B),To,reduce,major,frequency,fluctuations,when,energizing,load C),To,prevent,or,reduce,the,effects,of,line,changing,when,energizing,EHV,transmission
B), 8 ,hours C), 16 ,hours D), 24 ,hours,,ANS,-,D), 24 ,hours During,a,restoration,process,,Generation,Owners,are,required,to,update,their,progress,by,submitting,a,r eport: A),On,an,hourly,basis B),Every,1/2,hour C),For,every,unit,returning,to,service D),As,conditions,on,the,system,change,,ANS,-,A),On,an,hourly,basis Concerning,PJM,requirements,for,critical,start,generation,,which,of,the,following,statements,applies,to,t he,units,capability,to,maintain,frequency?,() A),Dynamic,offline,testing,of,the,units,voltage,controls B),Picking,up,an,isolated,block,of,loads C),Producing,leading,and,lagging,VARs D),Dynamic,Off-line,testing,of,the,units,governor,control,,ANS,-,B),Picking,up,an,isolated,block,of,loads D),Dynamic,Off-line,testing,of,the,units,governor,control During,system,restoration,,a,generator,should,not,be,loaded,above,the,level,of,available A),operating,reserve B),synchronized,reserve C),primary,reserve D),dynamic,reserve,,ANS,-,D),dynamic,reserve Dynamic,Reserves,consist,of
D),PJM,,ANS,-,B),The,Transmission,Owner While,progressing,through,your,system,restoration,plan,,you,come,across,a,transmission,line,that,has,b oth,of,its,breakers,closed.,The,line,is,far,removed,from,any,generation,sources.,Which,of,the,following,st atements,describes,the,best,course,of,action,you,should,take? A),The,line,is,clearly,faulted,and,should,not,be,re-energized,until,all,other,facilities,are,in,service. B),The,line,is,not,faulted,and,can,be,re-energized,immediately. C),Clear,the,remaining,breakers,on,the,bus,and,test,energize,it,with,a,remote,line D),Have,field,personnel,check,the,relay,targets,at,both,terminals,to,determine,if,the,line,is,faulted,,ANS,- ,D),Have,field,personnel,check,the,relay,targets,at,both,terminals,to,determine,if,the,line,is,faulted Using,the,following,information,,determine,the,maximum,amount,of,load,that,should,be,restored,(assu me,a,5%,governor,droop). Generation,Capacity,on-line,=,1000MW System,Load,=,800MW System,Frequency,=,60.5,Hz A),50MW B),90MW C),120MW D),150MW,,ANS,-,A),50MW Do,not,restore,load,blocks,that,exceed,5%,of,the,synchronized,gen,capacity Which,of,the,following,would,be,considered,as,the,'final,step',in,determining,the,status,of,generation,af ter,a,disturbance,or,event,has,occurred? A),Determine,the,status,of,generation,that,was,off-line,prior,to,the,event
B),Stabilize,surviving,on-line,generation C),Determine,what,generation,survived,the,event,and,is,still,in,service D),Determine,the,status,of,generation,that,was,off-line,prior,to,the,event,,ANS,- ,C),Determine,what,generation,survived,the,event,and,is,still,in,service According,to,PJM,,how,many,critical,Blackstart,Unit,outages,may,there,be,per,station? A), 3 B), 2 C), 4 D), 1 ,,ANS,-,D), 1 2,are,allowed,per,zone,but,must,be,at,different,stations Which,of,the,following,are,considered,as,'critical,load',by,PJM? A)Two,independent,feeds,into,each,nuclear,facility,for,station,start-up B),Power,to,pumping,plants,for,underground,cables C),Gas,infrastructure,equipment D),Light,and,power,to,critical,substations,,ANS,-,C),Gas,infrastructure,equipment During,system,restoration,operations,,a,member,company,has,a,steam,capacity,of,600MW,,combustion, turbine,capacity,of,200MW,and,100MW,of,hydro,capacity.,The,load,factors,(governor,response),are,5%, ,25%,,and,15%,respectively.,Also,,50MW,of,load,with,underfrequency,load,shedding,enabled,has,been,r estored.,What,is,the,total,governor,reserve,capability,of,the,company's,steam,,combustion,turbine,and, hydro,units?,,ANS,-,95MW During,system,restoration,prior,to,synchronization,of,a,unit,,the,dispatcher,should,ensure,sufficient,load ,is,available,to A),economize,unit,operation
,the,capability,of,each,generation,resource,to,meet,the,restoration,plan,requirements.,Under,this,proce ss,,each,generator,shall,be,tested,at,least,every A),Year B),Three,years C),Five,years D),Seven,years,,ANS,-,B),Three,years When,connecting,islands,,how,do,you,know,if,your,system,is,stable?,(Pick,2)
Which,of,the,following,is,not,a,goal,of,the,PJM,Market,Monitor?
Operating,Reserves,,ANS,-,T,<=,30min Primary,+,Secondary Offline,+,Online Offline,=,lesser,of:,spin,max,,spin,ramp,rate,(30min,-,TTS) Online,=lesser,of:,ramp,rate,*, 30 ,min,,spin,max,-,current,MW,level Supplemental,Reserves,,ANS,-,=,operating,reserve,-,primary,reserve primary,reserve,=,synchronized,+,quick,start Reliability,Analysis When,does,it,happen? What,is,the,rebid,period?,,ANS,-,Second,commitment,to,ensure,that,their,is,enough,gen,to,meet,real- time,load,forecast Schedule: 1600 ,-,Day,ahead,results,posted 1600 - 1800 ,- ,Rebid,period,(Gives,units,not,picked,up,in,the,day,ahead,an,opportunity,to,change,offers/parameters) 1800 ,-,Reliability,analysis What,is,the,difference,between,Dynamic,Reserve,and,Synchronized,Reserve?,,ANS,-,Dynamic,Reserve,- ,(automatic),reserve,on,generators,that,is,available,via,governor,action,and,load,w/,under,frequency,rel aying Synchronized,Reserve,-,(manual),spinning,online,gen What,are,the,two,types,of,reserves,monitored,during,a,restoration?,,ANS,- ,Synchronous,and,Dynamic,reserves
Which,of,the,following,equipment,controls,generator,shaft,speed,,controls,frequency,,and,adjusts,gener ation,for,small,changes,in,load? A),Output,terminal,voltage,of,the,generator B),Governor C),Automatic,Voltage,Regulator,(AVR) D),Exciter,,ANS,-,B),Governor A,500MW,generator,is,following,economic,dispatch,and,is,currently,loaded,at,400MW.,This,units,ramp,r ate,is,3MW/min.,How,much,Spinning,Reserve,is,available,on,the,unit? A),10MW,Tier,1,,90MW,Tier, 2 B),30MW,Tier,1,,70MW,Tier, 2 C),0MW,Tier,1,,100MW,Tier, 2 D),30MW,Tier,1,,0MW,Tier, 2 ,,ANS,-,D),30MW,Tier,1,,0MW,Tier, 2 What,is,the,deadline,for,a,self-scheduling,unit,for,spinning,reserve? A), 1800 ,on,the,day,before B), 120 ,minutes,before,the,operation,hour C), 60 ,minutes,before,the,operation,hour D), 20 ,minutes,before,the,operation,hour,,ANS,-,C), 60 ,minutes,before,the,operation,hour To,whom,does,the,Market,Monitor,Report? A),The,largest,PJM,member B),NERC C),Organization,of,PJM,Inc,(OPSI) D),PJM,Board,of,Members,,ANS,-,D),PJM,Board,of,Members
When,is,an,IRC,requested?,What,types,of,reserves,does,it,request?,,ANS,- ,An,IRC,is,typically,requested, 30 - 45 ,min,prior,to,a,peak.,Types,of,reserves,on,the,check: