A comprehensive set of questions and answers related to pjm generation dispatch, covering topics such as system restoration, black start procedures, reserve requirements, and communication protocols. It is a valuable resource for individuals preparing for exams or seeking to deepen their understanding of pjm's generation dispatch processes.

Typology: Exams

2024/2025

Available from 03/06/2025

Academician
Academician šŸ‡ŗšŸ‡ø

3.8

(21)

5K documents

1 / 78

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
PJM Generation Dispatch Exam
Questions And Answers Latest Update
Save
Terms in this set (219)
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f
pf40
pf41
pf42
pf43
pf44
pf45
pf46
pf47
pf48
pf49
pf4a
pf4b
pf4c
pf4d
pf4e

Partial preview of the text

Download PJM Generation Dispatch Exam: Questions and Answers and more Exams Advanced Education in PDF only on Docsity!

PJM Generation Dispatch Exam

Questions And Answers Latest Update

Save

Terms in this set (219)

Which of the following statements is correct concerning PJM assuming frequency control of the restoration process?

A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let

C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO

During a restoration, if you are presented with the opportunity to re-connect with the Eastern Interconnection, you should:

A)Not pursue this opportunity because you may cause the Eastern Interconnection to become unstable. B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system C) Pursue this opportunity as quickly as possible D) Pursue this opportunity only if you need cranking power for your generating unity

C) Pursue this opportunity as quickly as possible

Complete (Total System) Blackouts are characterized by which of the following?

1 - Most common type of blackout 2 - May require coordinating multiple islands 3 - Likely to result in Transmission overloads or other issues 4 - Affects a very large geographical area, and many customers 5 - Most commonly caused by human or switching errors

A) 1 & 3

B) 2 & 4

C) 3 & 5

D) 1

B) 2 & 4

Why would an offsite power to generating facilities be a priority during the restoration process?

A) To provide safe shutdown power for the units B) To meet FERC requirements C) To provide adequate lighting for the plant operators to attempt a restart D) To prepare and expedite the return of the unit

D) To prepare and expedite the return of the unit

Factors that help determine the sequence of restoration of off- line generation include (Pick 2):

-Generation Type -Unloaded Capacity -Unit Availability -Stability of the Generator

-Generation Type -Unit Availability

Which of the following statements are true concerning delays in restoring auxiliary power to off-line generation?

1 - The unit could suffer turbine shaft damage 2 - The fuel oil for the unit could congeal 3 - The startup time for the unit will be reduced 4 - The battery life used to maintain critical systems may run out

A) 1, 2 and 3 B) 1, 2 and 4 C) 1, 3 and 4 D) 2, 3 and 4

B) 1, 2 and 4

During system restoration, the two categories of reserves are:

A) dynamic and secondary B) spinning and quick start C) dynamic and spinning D) spinning and primary

C) dynamic and spinning

What is the most critical communication path when restoring large load blocks early in a system restoration?

A) Between the Generating Unit and the Transmission Owner B) Between PJM and the generating plant C) Between the Generator Owner (or MOC) and the generating unit D) Between the transmission owner and the MOC

A) Between the Generating Unit and the Transmission Owner

Your entire system has blacked out due to an event. You receive word from PJM that the entire region is affected as well. Your blackstart generation resources are spread throughout your system, which cover a large area. Which restoration strategy would be the best for you to implement?

A) Combination approach B) Bottom-up Core Island approach C) Top-down approach D) Bottom-up Multiple Island approach

D) Bottom-up multiple island approach

Your entire system has blacked out due to an event. You receive information the your neighboring systems are also blacked out. Your main urban load center restoration strategy would be the best for you to implement?

A) Combination approach B) Bottom-up Core Island approach C) Top-down approach D) Bottom-up Multiple Island approach

B) Bottom-up Core Island approach

Select the statement that best describes why Minimum Source Requirements have been established:

A) To ensure system stability prior to interconnecting with another entity B) To reduce major frequency fluctuations when energizing load C) To prevent or reduce the effects of line changing when energizing EHV transmission D) To ensure that adequate Dynamic Reserves exist prior to interconnection with another entity

C) To prevent or reduce the effects of line changing when energizing EHV transmission

For each transmission zone that has a critical load requirement PJM will ensure at a minimum the allocation of how many Black Start resources?

A) 1

B) 2

C) 3

D) 4

B) 2

During a restoration process you have 6,000MW of customer demand restored and frequency drop by 1 Hz how much load needs to be shed to restore frequency back to where it was prior to the disturbance?

A) 180MW to 360MW B) 300MW to 480MW C) 360MW to 600MW D) 480MW to 720MW

C) 360MW to 600MW