An advanced rigging test with correct answers and complete solutions, designed to help individuals pass rigging exams with a guaranteed a+ grade. It covers essential topics such as two blocking, bridle sling angles, multiple crane lifts, lift plan deviations, and more. The test includes questions on crane operations, rigging hardware, load control, and safety procedures, providing a comprehensive review of rigging principles and practices. This resource is ideal for riggers, crane operators, and safety professionals seeking to enhance their knowledge and skills in advanced rigging techniques.

Typology: Exams

2025/2026

Available from 10/14/2025

PerfectScholar
PerfectScholar 🇺🇸

1

(1)

7.5K documents

1 / 12

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
P a g e | 1
ADVANCED RIGGING TEST 2 WITH
CORRECT ANSWERS 100% WITH
COMPLETE SOLUTIONS PASS
GUARANTEED | GRADED A+ |
1) What is meant by the term "two blocking - correct answer -The
load block contacts the boom point sheaves.
2) lifting 20,000lbs, with a 2-leg bridle sling at a 30 horizontal sling
angle, what is force applied to each leg? - correct answer -20,000
3) In multiple crane lifts using an equalizer beam, the weight of
the beam should be considered: - correct answer -Part of the load
weight
4) What is required if there is a deviation in the lift plan? - correct
answer -A new lift plan
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download Advanced Rigging Test with Correct Answers and Complete Solutions and more Exams Construction in PDF only on Docsity!

ADVANCED RIGGING TEST 2 WITH

CORRECT ANSWERS 100% WITH

COMPLETE SOLUTIONS PASS

GUARANTEED | GRADED A+ |

  1. What is meant by the term "two blocking - correct answer - The load block contacts the boom point sheaves.
  2. lifting 20,000lbs, with a 2-leg bridle sling at a 30 horizontal sling angle, what is force applied to each leg? - correct answer - 20,
  3. In multiple crane lifts using an equalizer beam, the weight of the beam should be considered: - correct answer - Part of the load weight
  4. What is required if there is a deviation in the lift plan? - correct answer - A new lift plan
  1. On level ground using skids and rollers, what percent of the weight of the load should yield the required line pull as a general rule of thumb? - correct answer - 5%
  2. All of the following are results of unbalanced reeving of the hook block EXCEPT: - correct answer - Wear on the hook
  3. Before a spreader bar or beams can be used they MUST have been: - correct answer - Tested and approved
  4. When materials are being hoisted to an upper level, a tag line is used to: - correct answer - Help control the load
  5. Two cranes are lifting 100 tons. If crane A has 40 % of the load , how much weight will crane B have on its hook? - correct answer - 120,000 Ibs.
  6. To confirm the rated capacity of a specific sling, consult the manufacturer's: - correct answer - Sling tag
  1. Before performing pick and carry operations with any mobile crane, it is important to: - correct answer - Refer to the manufacturer's capacity chart 17 ) According to ASME B30.5 , a two crane lift is signaled by - correct answer - One designated person
  2. How much force would be required to move an object up an inclined plane compared to lifting it vertically? - correct answer - Less force
  3. All of the following are reasons for stopping personnel lifting operations EXCEPT - correct answer - There are no tag lines
  4. The point of any object's weight can be assumed to be concentrated at: - correct answer - Center of gravity
  5. In a spur-gear chain hoist with a two chain system, the endless chain is used to - correct answer - Raise and lower the load
  1. In an emergency situation, what is the rigger's FIRST priority?
  • correct answer - To prevent injury or loss of life
  1. All of the following conditions exert dynamic loading on a crane EXCEPT: - correct answer - Static boom angle
  2. Proper lead sheave placement as it relates to the hoisting drum location is: - correct answer - Proper spooling of wire rope
  3. The most important information to consider when planning a lift is: - correct answer - weight of the load
  4. Prior to use, all new, altered, modified, or repaired rigging hardware shall be inspected by whom? - correct answer - designated person
  5. An unsafe condition that riggers should be aware of when dealing with a multi part load block is: - correct answer - Twisting multi part lines
  1. Location of electrical hazards on the job site should be documented on a: - correct answer - Lift plan
  2. When forming a lift plan, a PRIMARY concern for the person doing the rigging is: - correct answer - Capacity of rigging
  3. When using a wedge socket, the dead end of the rope is secured in the socket by the: - correct answer - Wedge
  4. When erecting or stowing a swing-away lattice extension, what should be used to control the movement of the extension? - correct answer - Tag line
  5. Planning for rigging is required: - correct answer - Only when lifting any load
  6. A lift plan MUST be completed by a: - correct answer - Supervisor
  1. Anchorage points for fall arrest harness for a single person MUST be able to hold: - correct answer - 5000 lbs.
  2. Which of the following items are used for heavy rigging? - correct answer - Slings, shackles, and spreader beam
  3. If the jacket of a synthetic round sling is damaged, that sling should be: - correct answer - Removed from service immediately
  4. Which of the following is NOT a factor when making submerged lifts? - correct answer - Water temperature
  5. When a tugger is mounted where the operator can NOT see the load, the signal person most uses - correct answer - Signals used for cranes
  6. Who can design a personnel platform? - correct answer - A qualified personnel
  1. When lifting 100,000 pounds, the main load block must be reeved with how many parts of line? - correct answer - 4
  2. What standard hand signal is being communicated in the illustration? - correct answer - Travel (one track)
  3. What Standard hand signal is being communicated in the illustration? - correct answer - Use whip line
  4. Using the chart, how many parts of line are needed to lift a load weighing 265,000 pounds? - correct answer - 9
  5. What is the PRIMARY concern when working with high boom angles? - correct answer - Backward stability
  6. On multiple crane lifts, the load on each crane should NOT exceed what percentage of capacity? - correct answer - 75%
  1. What are lifting lungs? - correct answer - Eyelets welded to a steel plate for lifting 60)The formula for determining stress on a snatch block performing a vertical lift is: line pull block factor block load. What must be done to calculate the formula? - correct answer - Multiply the load weight by the coefficient of friction to determine pull, and then the standard formula
  2. If both fists are placed in front of your body with your thumbs pointed outward, the crane operator should: - correct answer - Extend the boom sections
  3. what is the MAXIMUM percent of the rated capacity of a crane that can be used to litft personnel? - correct answer - 50%
  4. When does lightening present the greatest hazard to the crane and rigging personnel? - correct answer - When thunder and lightning are apparent