


Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
last assignment for this subject
Typology: Study Guides, Projects, Research
1 / 4
This page cannot be seen from the preview
Don't miss anything!



1 Caster wheels 4 11mm*22mm, black RM 10 2 Stretchable rope 1 Total length: 100 ft/ Meters. Diameter: Approximate 4mm
3 Round Strap 1 0.5 meter RM 5 TOTAL RM 30 MASTER PRODUCTION SCHEDULE(MPC): Cost for one sheet maid = RM 30 Per day * demand = RM 30 * 30 = RM 300