assignment technopreneurship, Study Guides, Projects, Research of Entrepreneurship

last assignment for this subject

Typology: Study Guides, Projects, Research

2019/2020

Uploaded on 02/23/2020

syaw-werdas
syaw-werdas 🇲🇾

1 document

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
6.1: THE TRANSFORMATION OF B.I.O SDN.BHD
A big
company that
produce a lot
of product
and hire
more workers
(B.I.O
Holding)
Peak stage
Small
company that
hire some
workers to
advance the
rate of
production
(B.I.O
Sdn.Bhd)
Middle stage
A group
which
consists of 10
members
Earlier stage
pf3
pf4

Partial preview of the text

Download assignment technopreneurship and more Study Guides, Projects, Research Entrepreneurship in PDF only on Docsity!

6.1: THE TRANSFORMATION OF B.I.O SDN.BHD

A big

company that

produce a lot

of product

and hire

more workers

(B.I.O

Holding)

Peak stage

Small

company that

hire some

workers to

advance the

rate of

production

(B.I.O

Sdn.Bhd)

Middle stage

A group

which

consists of 10

members

Earlier stage

6.2: PROCESS PLANNING

6.4: MATERIAL REQUIREMENT PLANNING (MRP)

BILL OF MATERIALS(BOM):

NO. PARTS QTY DESCRIPTION COST

1 Caster wheels 4 11mm*22mm, black RM 10 2 Stretchable rope 1 Total length: 100 ft/ Meters. Diameter: Approximate 4mm

RM 15

3 Round Strap 1 0.5 meter RM 5 TOTAL RM 30 MASTER PRODUCTION SCHEDULE(MPC): Cost for one sheet maid = RM 30 Per day * demand = RM 30 * 30 = RM 300