Construction Management Guide: Specs, Scheduling, & Cost Control, Exams of Biology

This study guide provides a comprehensive overview of key concepts in construction management, focusing on technical specifications, scheduling, and cost control. It includes a series of questions and answers designed to test understanding of essential principles and practices. The guide covers topics such as contract administration, project management, safety regulations, and cost estimation, making it a valuable resource for students and professionals in the construction industry.

Typology: Exams

2024/2025

Available from 11/03/2024

tutor-lee-1
tutor-lee-1 🇺🇸

4.3

(3)

11K documents

1 / 33

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
AC exam- New
Study Guide with
complete
verified
solutions
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21

Partial preview of the text

Download Construction Management Guide: Specs, Scheduling, & Cost Control and more Exams Biology in PDF only on Docsity!

AC exam- New

Study Guide with

complete

verified

solutions

In Part 1 of each Section of a Technical Specification Division - answer Which document explicitly tells the reader the specific shop drawings, product data, and reference standards required on a project? Subcontractors and Vendors - answer Which party is the primary developer of the shop drawings? Poured 75 CY Concrete Placed Rebar, Stripped Forms for Columns D1 -D4 - answer Which of the following descriptions provides the BEST example of how to report progress on the job site? Fire Marshall, Mechanical Inspector, Electrical Inspector and

Fair Labor Standards - answer Which of the following posters describes the regulations for wage payment and hours of work for all industries and must be posted at the job site? W-4 - answer When hiring employees, which form must they fill out requesting their marital status, number of exemptions and their social security number? Project Manager - answer Which party typically obtains the building permits? Assembles and aligns rotating equipment - answer Which of the following activities does a Millwright perform?

Project Manager - answer Which position typically writes the subcontract agreements? 2% discount can be deducted if paid within 10 days of the invoice date. Full payment due in thirty days - answer Which of the following descriptions defines the term 2/10 Net 30? Passes at time of pickup by carrier - answer The terms on the purchase order indicate F.O.B. Factory; at which point does the responsibility for the goods change? Labor - answer Which of the following items must never be agreed upon utilizing a form titled

100 Feet - answer What is the maximum horizontal travel distance to retrieve a fire extinguisher in a Building Area? Pipefitting Sub, Excavator, and General Contractor - answer The Pipefitting Subcontractor is required to lay pipe in a trench that is 10 feet deep and 3 feet wide with vertical walls and no sloping or other protection. The trench was dug by the Excavator. The General Contractor supervised the work, but had no employees in the trench. The Concrete Sub told the General Contractor and Excavator that the trench needed to be sloped or shored before their employees could work in the trench. During the OSHA inspection, OSHA observed the General at the trench supervising the pipefitter in the trench.

Which Contractor(s) would receive a citation for an unsafe trench? Willful Violation - answer According to OSHA violations, what is the name of the violation where the firm or designated person is aware that a hazardous condition exists, knows that the condition violates a standard and makes no effort to eliminate the safety hazard? February 1 - April 1 and accessible to all employees at the jobsite - answer When and Where must the OSHA Summary (OSHA 300A) be posted? OSHA's Injury and Illness Incident Report (OSHA's Form 301) - answer According to OSHA, which document must

10, what is the total float for activity B? A, C, F, G - answer Using the information provided in figure 10, what are the critical activities for this logic network? 14 - answer Using the information provided in figure 10, what is the total number of days to complete this sequence of activities? A time scaled with owner-furnished items and planned weather losses each month - answer For a Design-Build Schedule to be admissible evidence in court, it must contain the Design Activity Sequence, Procurement Activity Sequence and the Construction Activity sequence. Which of the following

must also be on the preliminary schedule? The amount of slack within a path (series) of activities - answer How is Total Float defined? Technical Specifications - answer What is the best source for developing the activity descriptions for the logic network and schedule? Resource Leveling - answer What is the name of the term for shifting the activities within their available free floats in order to produce a uniform work force and reduce the maximum resource usage requirements? Overlapping execution of the design, procurement and

for the quantities in Vertical Lineal Feet (VLF)? 338.00 - answer Using the information provided in figure 9a, 9b, and 9c, what is the projected gain or loss in Labor Dollars for the Concrete Footings? 5,150.72 - answer Using the information provided in figure 9a, 9b, and 9c, what is the Total Projected Labor cost at Completion for the Concrete Footings? 20.12 - answer Using the information provided in figure 9a, 9b, and 9c, what is the To Date Labor Unit Cost in Dollars per unit for the Concrete Footings?

14.60 - answer Using the information provided in figure 9a, 9b, and 9c, what is the Week Labor Unit Cost in Dollars per unit for the Concrete Footings? 21.45 - answer Using the information provided in figure 9a, 9b, and 9c, what is the Budgeted Labor Unit Cost in Dollars per unit for the Concrete Footings? (174) - answer Using the information provided in figure 9a, 9b, and 9c, what is the projected gain or loss in Workhours for the Column Forms? 602 - answer Using the information provided in figure

0.241 - answer Using the information provided in figure 9a, 9b, and 9c, what is the To Date Unit Workhours in Whr per Unit for the Column Forms? 356.60 - answer Using the information provided in figure 8a and 8b, how many cubic yards of soil must be excavated? 8.92 - answer Using the information provided in figure 8a and 8b, what is the total depth of the cut in feet for the building excavation? 25,565 - answer Given the information provided in figure 7 for a cofferdam that is 60 feet wide by 100 feet long and 10 feet deep enclosed

with a 3 foot toe; approximately how many total board feet (BF) for all of the cofferdam components including the waste? VLF=320lf/(13"/12") = 296PCS o 296PCS x 13' long = 3,848VLF

  • Piling = 3,848VLF x (3" x 13")/12 = 12,506BF
  • Wales = 3 lines x 320ft = 960lnft o 960lnft x (3"x12" /12") = 3,
  • Braces = 3 lines x 12PCS/line x 60'long = 2,160lnft o 2,160lnft x (6" x 6" /12") = 6,
  • Subtotal = 12,506 + 3,840 + 6, = 22,826BF
  • Waste = 22,826BF x 12% = 2,739BF
  • Total Board Fee = 22,826 + 2,739 =

S.F.C.A. per Day, what is the Productivity Rate expressed in Workhours per Unit (Whr/Unit)? 60 - answer The plans call for the contractor to Drive, Pull and Salvage Steel Sheet Piling, 15 feet deep. The Estimated quantity is 12,000 Square Feet of Contact Area (S.F.C.A.). Given the Crew Makeup and hourly rates based upon an 8-hour work day found in figure 6 and given the Crew Daily output and unit of measure are 545 S.F.C.A. per Day, how many total crew workhours are expended per day? One thousand Board Feet - answer What does the R.S. Mean's book unit of measure abbreviation M.B.F. stand for?

$21,966 - answer Given the bond premium schedule below, what is the Bond Premium for a $2,755,000 Project? First $5,000 = $12.00 per M Next $2,000,000 = 6,000 + $7.25 per M Next $2,500,000 = $20,500 + $5.75 per M ..... 20500+((5.75/1000)*255000) = 21966 .... 2755000 - 2500000 = 255000 Yes, they will lose the amount of their Bid Bond Face Value - answer The Contractor submits a bid for $1,303,071 with the appropriate forms. They receive a Notice of Award letter indicating that their bid has been selected. The Contractor decides not to accept the contract. Will the Contractor lose anything? Performance Specification - answer A specification reads as follows: "Furnish,