A series of multiple-choice questions and answers related to crane and rigging operations. It covers various aspects of crane safety, lift planning, rigging techniques, and load handling. The questions are designed to test knowledge of industry standards, regulations, and best practices in crane and rigging operations.

Typology: Exams

2024/2025

Available from 01/02/2025

Achieverr
Achieverr ๐Ÿ‡บ๐Ÿ‡ธ

4.2

(14)

20K documents

1 / 9

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Advanced Crane & Rigging Test questions
with correct answers
When should an approved lift plan be re-approved? - ....๐Ÿ”ฐVERIFIED
ANSWERS.... โœ”โœ”D. If there is any deviation from the original lift plan.
Electrical hazards in the lift area and swing direction and degree are factors
to consider in preparing which portion of a lift plan? - ....๐Ÿ”ฐVERIFIED
ANSWERS.... โœ”โœ”D. Crane Placement
Capacities for crawler cranes that have outrigger extensions may not
exceed ________. - ....๐Ÿ”ฐVERIFIED ANSWERS.... โœ”โœ”D. 85 perfect of tipping
When planning a lift involving two cranes, calculate the lowest net
capacities that both cranes will have during the lift. The next step is to
______. - ....๐Ÿ”ฐVERIFIED ANSWERS.... โœ”โœ”A. Make sure that the sum of the
lowest rated net capacities of the cranes exceeds the load weight.
A lift plan should be discussed ______. - ....๐Ÿ”ฐVERIFIED ANSWERS.... โœ”โœ”D. At
a pre-lift meeting where all personnel in the lift are present.
What is meant by the term "two blocking?" - ....๐Ÿ”ฐVERIFIED ANSWERS....
โœ”โœ”B. The load block contacts the boom point sheaves
Lifting 20,000 lbs with a 2-leg bridle sling at a 30ยฐ horizontal sling angle,
what is the force applied to each leg? - ....๐Ÿ”ฐVERIFIED ANSWERS....
โœ”โœ”20,000 lbs.
In multiple crane lifts using an equalizer beam, the weight of the beam
should be considered: - ....๐Ÿ”ฐVERIFIED ANSWERS.... โœ”โœ”Part of the load
weight
pf3
pf4
pf5
pf8
pf9

Partial preview of the text

Download Crane and Rigging Test Questions and Answers and more Exams Nursing in PDF only on Docsity!

Advanced Crane & Rigging Test questions

with correct answers

When should an approved lift plan be re-approved? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” D. If there is any deviation from the original lift plan. Electrical hazards in the lift area and swing direction and degree are factors to consider in preparing which portion of a lift plan? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” D. Crane Placement Capacities for crawler cranes that have outrigger extensions may not exceed ________. - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” D. 85 perfect of tipping When planning a lift involving two cranes, calculate the lowest net capacities that both cranes will have during the lift. The next step is to ______. - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” A. Make sure that the sum of the lowest rated net capacities of the cranes exceeds the load weight. A lift plan should be discussed ______. - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” D. At a pre-lift meeting where all personnel in the lift are present. What is meant by the term "two blocking?" - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” B. The load block contacts the boom point sheaves Lifting 20,000 lbs with a 2-leg bridle sling at a 30ยฐ horizontal sling angle, what is the force applied to each leg? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 20,000 lbs. In multiple crane lifts using an equalizer beam, the weight of the beam should be considered: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Part of the load weight

What is required if there is deviation from the lift plan? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” A new lift plan On level ground using skids and rollers, what percent of the weigh of the load should yield the required line pull as a general rule of thumb? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 5% All of the following are results of unbalanced reeving of the block except:

  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Wear on the hook Before a spreader bar or beams can be used they MUST have been: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Tested and approved When materials are being hoisted to an upper level, a tag line is used to:
  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Help control the load Two cranes are lifting 100 tons. If crane A has 40% of the load, how much weight will crane B have on its hook? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 120,000 lbs To confirm the rated capacity of a specific sling, consult the manufacturer's:
  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Sling tag OSHA regulations require hook replacement if the opening exceeds what percentage of it's original throat opening? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 15% At what percentage of increase in length should a chain sling be removed from service? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 5%

If both fists are placed in front of your body with your thumbs pointed outward, the crane operator should: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Extend the boom sections. What is the maximum percent of the rated capacity of a crane that can be used to lift personnel? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 50% When does lightning present the greatest hazard to crane and regging personnel? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” When thunder and lightning are apparent. What force would be required to move an object up an inclined plane compared to lifting it vertically? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 1 1/ times more. Personnel platforms shall NOT be used to lift: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Tools and materials without employees All of the following are reasons for stopping personnel lifting operations EXCEPT: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” There are no tag lines. When working in close quarters, the main concern is: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Safety The point of any objects weight can be assumed to be concentrated at: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Center of gravity In a spur-gear chain hoist with a two chain system, the endless chain is used to: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Raise and lower the load

All of the following conditions exert dynamic loading on a crane except:

  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Static boom angle Proper lead sheave replacement as it relates to the hoisting drum location is: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Proper spooling of wire rope The most important information to consider when planning a lift is: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Weight of the load Prior to use, all new, altered, modified, or repaired rigging hardware shall be inspected by whom? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” A designated person An unsafe condition that riggers should be aware of when dealing with a multi part load block is: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Twisting multi part lines Most cranes in duty cycle operation require : - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Load test The only personnel allowed to have their body parts outside of the suspended personnel platform during hoisting and lowering operations are:
  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Signal Persons When is the most important reason rigging hardware should not be modified? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” It could negatively affect its capacity In the term D/d ratio, the d is an abbreviation for? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Diameter

When of the following items are used for heavy rigging? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Slings, shackles and spreader beam If the jacket of a synthetic round sling is damaged, that sling should be:

  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” removed from service immediately Which of the following is not a factor when making submerged lifts? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” water temperature When a tugger is mounted where the operator can NOT see the load, the signal person must use: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Signals used for cranes Who can design a personnel platform? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Qualified personnel A one inch, 3 leg bridle wire rope sling rigged at 45ยฐ angle is good for 18 tons. The addition of a fourth leg will increase your capacity by: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 0 lbs After any structural repair or modification, a personnel lifting platform shall be tested to what percentage of the platform rating? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 150% All of the following statements about crane contact to power lines are true EXCEPT: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” The operator should leave the cab as quickly as possible Loads introduced into the machine or its components due to accelerating or decelerating force is called: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Dynamic loading

When lifting 100,000 lb, the main load block must be reeved with how many parts of line? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” 4 In a multiple-crane lift using an equalizer, the weight of the equalizer is considered part of the - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” load weight To read a lattice boom crawler crane load/capacity chart, the operator must first know the - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” boom length and load radius Equipment condition is categorized under which part of a lift plan? - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Weight The person in charge of planning a critical lift is the: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” Rigging superintedant During a critical lift, the only person(s) who may give signals to the crane operator is/are the: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” designated, qualified signalers Sling lengths need to be long enough to ensure that the horizontal angle is greater than: - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” The device used as an alternative to a freestanding tower crane where lower erection height allows its use is a - .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” On multiple-crane lifts, the load on each crane should be no more than:

  • .... ๐Ÿ”ฐ VERIFIED ANSWERS.... โœ”โœ” The net capacity of crane one is 130,000 lbs. The net capacity of crane two is 90,000 lbs. The weight of the load is 145,000 lbs. The weight of the equalizer beam is 3000 lbs. The distance between the hook blocks is 25 ft.