A series of multiple-choice questions and answers related to crane and rigging operations. It covers various aspects of crane safety, lift planning, rigging techniques, and load handling. The questions are designed to test knowledge of industry standards, regulations, and best practices in crane and rigging operations.
Typology: Exams
1 / 9
This page cannot be seen from the preview
Don't miss anything!






When should an approved lift plan be re-approved? - .... ๐ฐ VERIFIED ANSWERS.... โโ D. If there is any deviation from the original lift plan. Electrical hazards in the lift area and swing direction and degree are factors to consider in preparing which portion of a lift plan? - .... ๐ฐ VERIFIED ANSWERS.... โโ D. Crane Placement Capacities for crawler cranes that have outrigger extensions may not exceed ________. - .... ๐ฐ VERIFIED ANSWERS.... โโ D. 85 perfect of tipping When planning a lift involving two cranes, calculate the lowest net capacities that both cranes will have during the lift. The next step is to ______. - .... ๐ฐ VERIFIED ANSWERS.... โโ A. Make sure that the sum of the lowest rated net capacities of the cranes exceeds the load weight. A lift plan should be discussed ______. - .... ๐ฐ VERIFIED ANSWERS.... โโ D. At a pre-lift meeting where all personnel in the lift are present. What is meant by the term "two blocking?" - .... ๐ฐ VERIFIED ANSWERS.... โโ B. The load block contacts the boom point sheaves Lifting 20,000 lbs with a 2-leg bridle sling at a 30ยฐ horizontal sling angle, what is the force applied to each leg? - .... ๐ฐ VERIFIED ANSWERS.... โโ 20,000 lbs. In multiple crane lifts using an equalizer beam, the weight of the beam should be considered: - .... ๐ฐ VERIFIED ANSWERS.... โโ Part of the load weight
What is required if there is deviation from the lift plan? - .... ๐ฐ VERIFIED ANSWERS.... โโ A new lift plan On level ground using skids and rollers, what percent of the weigh of the load should yield the required line pull as a general rule of thumb? - .... ๐ฐ VERIFIED ANSWERS.... โโ 5% All of the following are results of unbalanced reeving of the block except:
If both fists are placed in front of your body with your thumbs pointed outward, the crane operator should: - .... ๐ฐ VERIFIED ANSWERS.... โโ Extend the boom sections. What is the maximum percent of the rated capacity of a crane that can be used to lift personnel? - .... ๐ฐ VERIFIED ANSWERS.... โโ 50% When does lightning present the greatest hazard to crane and regging personnel? - .... ๐ฐ VERIFIED ANSWERS.... โโ When thunder and lightning are apparent. What force would be required to move an object up an inclined plane compared to lifting it vertically? - .... ๐ฐ VERIFIED ANSWERS.... โโ 1 1/ times more. Personnel platforms shall NOT be used to lift: - .... ๐ฐ VERIFIED ANSWERS.... โโ Tools and materials without employees All of the following are reasons for stopping personnel lifting operations EXCEPT: - .... ๐ฐ VERIFIED ANSWERS.... โโ There are no tag lines. When working in close quarters, the main concern is: - .... ๐ฐ VERIFIED ANSWERS.... โโ Safety The point of any objects weight can be assumed to be concentrated at: - .... ๐ฐ VERIFIED ANSWERS.... โโ Center of gravity In a spur-gear chain hoist with a two chain system, the endless chain is used to: - .... ๐ฐ VERIFIED ANSWERS.... โโ Raise and lower the load
All of the following conditions exert dynamic loading on a crane except:
When of the following items are used for heavy rigging? - .... ๐ฐ VERIFIED ANSWERS.... โโ Slings, shackles and spreader beam If the jacket of a synthetic round sling is damaged, that sling should be:
When lifting 100,000 lb, the main load block must be reeved with how many parts of line? - .... ๐ฐ VERIFIED ANSWERS.... โโ 4 In a multiple-crane lift using an equalizer, the weight of the equalizer is considered part of the - .... ๐ฐ VERIFIED ANSWERS.... โโ load weight To read a lattice boom crawler crane load/capacity chart, the operator must first know the - .... ๐ฐ VERIFIED ANSWERS.... โโ boom length and load radius Equipment condition is categorized under which part of a lift plan? - .... ๐ฐ VERIFIED ANSWERS.... โโ Weight The person in charge of planning a critical lift is the: - .... ๐ฐ VERIFIED ANSWERS.... โโ Rigging superintedant During a critical lift, the only person(s) who may give signals to the crane operator is/are the: - .... ๐ฐ VERIFIED ANSWERS.... โโ designated, qualified signalers Sling lengths need to be long enough to ensure that the horizontal angle is greater than: - .... ๐ฐ VERIFIED ANSWERS.... โโ The device used as an alternative to a freestanding tower crane where lower erection height allows its use is a - .... ๐ฐ VERIFIED ANSWERS.... โโ On multiple-crane lifts, the load on each crane should be no more than: