A concise overview of key concepts and terminology related to construction project management. It covers various stages of the facility life cycle, from project conception to facility management, and defines roles such as the principle stakeholder, ahj, design team, contractor team, and supplier team. The document also outlines different project delivery methods, construction documents, and sustainable design practices. It serves as a quick reference guide for understanding the fundamental aspects of construction projects, including procurement, bidding, and quality control. Useful for students and professionals in architecture, engineering, and construction.
Typology: Exams
1 / 42
This page cannot be seen from the preview
Don't miss anything!



































Owner /- /correct /answer(s) / ✔✔ /Principle /stakeholder /- /initiates /project, /assumes /risk, /provides /funding AHJ /- /Authorities /Having /Jurisdiction /- /correct /answer(s) / ✔✔ /Protect /public /health, /safety /and /welfare Design /Team /- /correct /answer(s) / ✔✔ /Address /planning /issues, /determine /design /program, /identify /codes /and /regulations, /produce /procurement /and /construction /documents, /administer /construction /contract, /provide /QA/QC /procedures Contractor /Team /- /correct /answer(s) / ✔✔ /Entity /that /constructs / a /facility.
/Uses /management /abilities /to /gather /labor /forces, /subs, /and /material/product/equipment /suppliers Supplier /Team /- /correct /answer(s) / ✔✔ /Furnishes /the /materials /and /products /for /the /facility /to /be /constructed. /Fabricator, /Distributor, /Manufacturer, /Supplier. Facility /Life /Cycle /- /correct /answer(s) / ✔✔ /The /life /cycle /of /a /facility, /from /concept /through /construction /to /use /and /eventual /deconstruction. / Project /Conception Project /Delivery Design Construction /Documents Procurement /(Bidding/Negotiating/Purchasing) Construction Facility /Management
/development. /Deliverables /include /graphic /and /written /design /documents /and /estimates /of /project /cost. Schematic /Design /- /correct /answer(s) / ✔✔ /Overall /relationships /and /functions. /Site /plan /and /area, /general /size/shape/massing /of /elements, /elevations /and /exteriors /established, /conceptual /design /criteria /identified. / Deliverables /- /schematic /drawings, /probable /cost, /preliminary /schedules Design /Development /- /correct /answer(s) / ✔✔ /Technical /issues /of /constructibility /and /integration /of /systems /and /components. / Deliverables /- /Tech /information, /outline /specifications, /updated /schedule, /updated /cost /estimate. Construction /Documents /- /correct /answer(s) / ✔✔
/Defined /as /the /written /and /graphic /documents /prepared /or /assembled /by /the /A/E /for /communicating /the /project /design /for /construction /and /administering /the /construction /contract. /Construction /documents /include /two /major /types /of /documents: /Procurement /documents /and /Contract /documents. Procurement /(Bidding/Negotiating/Purchasing) /- /correct /answer(s) / ✔✔ /Acceptance /of /the /contractor's /bid /or /negotiated /sum /and /other /conditions /will /result /in /award /of /a /contract /and /commencement /of /work. Construction /- /correct /answer(s) / ✔✔ /Responsibilities: Contractor /- /perform /work, /project /coordination, /comply /with /project /documents. A/ E /- /construction /admin, /evaluation /services, /certify /application /for /payment, /final /inspection /of /work. / Owner /- /provide /information, /process /payments, /approve /contract /modifications, /accept /project /upon /completion.
/or /sequence /on /the /basis /of /systems /or /assemblies. /Particularly /useful /in /conceptual /design. /Element /Identification. MasterFormat /- /correct /answer(s) / ✔✔ /Arranges /related /construction /practices, /logical /groupings /of /work /results, /into / a /series /of /divisions. / 50 /division /format. /Used /for /Specifications, /data /organization, /and /cost /classification. MasterFormat /Groups /- /correct /answer(s) / ✔✔ / 00 /Procurement /and /Contracting /Requirement /Group Specifications /Group
Green /Buildings /- /correct /answer(s) / ✔✔ /Reduce /overall /impact /of /the /built /environment /by /protecting /occupant /health /and /improving /employee /productivity. National /CAD /standard /- /correct /answer(s) / ✔✔ /CSI /Uniform /Drawing /System Autonomy /to /Contract /- /correct /answer(s) / ✔✔ /Two /parties /are /mutually /free /to /determine /the /terms /of /an /agreement /for /a /specific /purpose. Trade /Customs /- /correct /answer(s) / ✔✔ /If /contract /document /don't /adequately /establish /intent, /court /may /rely /on /customs /of /an /industry. Preliminary /Project /Description /- /correct /answer(s)
/Method /of /describing /aspects /of /the /schematic /design /in /written /form. /Describe /physical /requirements /the /logical /grouping /of /systems /assemblies /and /components. Dual /Nature /of /Design /- /correct /answer(s) / ✔✔ /Aesthetic /and /Technical /Design Quality /Control /- /correct /answer(s) / ✔✔ /Procedures /for /evaluating /completed /activities /and /elements /of /design /for /conformance. Quality /Assurance /- /correct /answer(s) / ✔✔ /Procedures /for /guarding /against /defects /and /deficiencies /before /and /during /execution /of /work. Allowance /- /correct /answer(s) / ✔✔
Construction /Budget /- /correct /answer(s) / ✔✔ /Prepared /by /several /methods. /Systems /(CSI /UniFormat), /cost /per /measured /units, /component /costs. Project /Schedule /- /correct /answer(s) / ✔✔ /Succession /of /steps, /script /of /interactions, /milestone /dates. Six /Project /Delivery /Methods /- /correct /answer(s) / ✔✔ /Design-Bid-Build Design-Negotiate-Build CMA Design-Build Owner-Build Integrated /Project /Delivery Total /Project /Commissioning /- /correct /answer(s) / ✔✔ /Quality /process /utilizing /an /independent /company /providing
/services. /Commissioning /continues /through /the /construction /stage /of /the /project /to /provide /QA/QC. Life /Cycle /Costs /- /correct /answer(s) / ✔✔ /Total /cost /of /ownership. /Initial /construction /costs /as /well /as /renovation, /remodeling, /and /improvements. Alternate /- /correct /answer(s) / ✔✔ /Portion /of /the /work /that /is /priced /separately /and /thus /provides /and /option /for /owner /in /determining /final /scope. /Additive /or /deductive /work /item. Unit /Price /- /correct /answer(s) / ✔✔ /Type /of /work /is /defined, /but /extent /is /unknown /of /likely /to /change.
/Various /types /of /information /should /be /made /available /to /bidders/proposers/contractors, /however, /they /are /not /contract /documents. /Reference /documents /that /do /not /belong /in /contract /documents. Bid /Form /- /correct /answer(s) / ✔✔ /Project /Identification Name /and /address /of /addressed /party Entity /submitting /bid Acknowledgements Amount /of /time /bid /is /open Identification /of /addenda Prices Combined /bids Alternates Allowances Unit /Prices Completion /Time Liquidated /damages Supplements
Closing Conditions /of /the /Contract /- /correct /answer(s) / ✔✔ /Define /basic /rights, /responsibilities, /and /relationships /of /parties /involved. /Inherent /part /of /owner- contractor /agreement. /General /and /Supplementary General /Conditions /- /correct /answer(s) / ✔✔ /Standard /documents /that /establish / a /baseline /of /which /exceptions, /modification, /and /additions /of /the /supplementary /conditions /are /identified. Supplementary /Conditions /- /correct /answer(s) / ✔✔ /Requirements /of
Certificates Drawing /- /correct /answer(s) / ✔✔ /Graphic /and /textual /information /in /2D /format. /Conveys /design /intent. Construction /Drawings /- /correct /answer(s) / ✔✔ /Consist /of /contract /drawings /and /resource /drawings. Contract /Drawings /- /correct /answer(s) / ✔✔ /Legally /enforceable /drawings. /Could /show /deconstruction, /alteration, /new /construction. Record /Drawings /- /correct /answer(s) / ✔✔ /Marked- up /or /corrected /contract /drawings /that /identify /changes /incorporated /into /the /work /during /construction. Scaled /Views /- /correct /answer(s) / ✔✔ /Plans /- /Horizontal /Planes Elevations /- /Vertical /Planes Sections /- /Vertical /Cut Detail /- /may /be /a /plan, /elevation, /or /section /view Nonscaled /Views /- /correct /answer(s) / ✔✔ /Diagrams, /Key /Plans, /Schedules, /Perspectives, /Isometric, /Title /Sheet
Two /methods /for /preparing /written /changes /- /correct /answer(s) / ✔✔ /Narrative /Method /and /Revised /Page /Method Addenda /- /correct /answer(s) / ✔✔ /Written /or /graphic /instruction /to /clarify, /revise, /add /to, /or /delete /information /in /the /procurement /documents. /Clarifies /questions /raised /by /bidders, /issue /new /requirements, /and /correct /errors/omissions. /Usually /prior /to /receiving /bids. Contract /Document /Modifications /- /correct /answer(s) / ✔✔ /Change /Orders Construction /Change /Directive