






















Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
ICA School Test questions revised version /newest
Typology: Exams
1 / 30
This page cannot be seen from the preview
Don't miss anything!























1 / 30
2 / 30 The material used to hold bricks together. Wiring that has been subject to excessive heat.: Material that covers exposed edges of roofing where it meets chimneys or sidewalls to prevent water intrusion
4 / 30 Operating the furnace and the water heater simultaneously. Running multiple plumbing fixtures in the house simultaneously. Operating the sump pump and the ejector pump simultaneously. Running plumbing fixtures in the same bathroom simultaneously.: Running plumb- ing fixtures in the same bathroom simultaneously
5 / 30 the condition of the roofing material.: Cost of replacing the roof covering
7 / 30 Clothes dryer. Attic fan. Medium or high efficiency furnace. Bathroom exhaust fan.: Medium or high eflciency furnace
8 / 30 d. PEX.: Lead
10 / 30
11 / 30 visibility.
13 / 30
14 / 30
16 / 30 Glass will be foggy. Wire mesh. Has a rippled look.: Marked in lower corner
17 / 30 Coping. Upper membrane. Cap and finish. Casting.: Coping
19 / 30 Water line Drain line Electric conduit Unsleeved Gas pipe: Unsleeved Gas pipe
20 / 30 Inspect soil conditions. State the effectiveness of plumbing anti-siphon devices.