Method of Project Selection-Engineering Project Management-Assignment, Exercises of Software Project Management

This assignment was given by Prof. Chandni Sharma at Bengal Engineering and Science University for Engineering Project Management course. its main points are: Organizational, Factors, Culture, Project, Management, Capabilities, Operations, Research, Associate

Typology: Exercises

2011/2012

Uploaded on 07/23/2012

gannaraj
gannaraj 🇮🇳

4.4

(8)

70 documents

1 / 1

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Assignment # 1
Course: Engineering Project Management (Fall 2011)
Due Date: October 3rd, 2011 (Before 1 PM)
Max Marks: 10
Note: For this assignment you need to consult books from the library and also
consult web. Also note that assignments must be hand written only.
What is Required?
Try to explain which organizational factors (excluding organizational culture)
affect organization’s project management capabilities. Be as detailed as possible.
Differentiate between project and operations management.
In lecture 2, we had studied about the organizational culture’s influence on project
management. Can you identify at least 10 different organizational cultural aspects
that affect the project and project management function within an organization?
Use web and available literature and preferably use your own thought process.
Explain in detail at least one method of project selection that is non numeric in
nature. Your answer must be able to explain how project selection is done using
the model.
Special Notes:
Please follow the following guidelines for all of your assignments in this course:
a) PLEASE NOTE THE COPYING IN THIS ASSIGNMENT CAN RESULT IN
DIAQUALIFICATION FROM ALL THE PREVIOUS ASSIGNMNETS.
b) ONLY HAND WRITTEN ASSIGNMENTS WILL BE ACCEPTABLE.
c) Be precise & specific. Avoid writing unnecessarily.
d) No assignment will be accepted after the due date.
f) If any confusion in any regard please feel free to contact your Research Associate
as soon as possible.
g) Any assignment not according to the given rules / policies will not be accepted.
docsity.com

Partial preview of the text

Download Method of Project Selection-Engineering Project Management-Assignment and more Exercises Software Project Management in PDF only on Docsity!

Assignment # 1

Course: Engineering Project Management (Fall 2011)

Due Date: October 3

rd

, 2011 (Before 1 PM)

Max Marks: 10

Note: For this assignment you need to consult books from the library and also consult web. Also note that assignments must be hand written only.

What is Required?

  • Try to explain which organizational factors (excluding organizational culture) affect organization’s project management capabilities. Be as detailed as possible.
  • Differentiate between project and operations management.
  • In lecture 2, we had studied about the organizational culture’s influence on project management. Can you identify at least 10 different organizational cultural aspects that affect the project and project management function within an organization? Use web and available literature and preferably use your own thought process.
  • Explain in detail at least one method of project selection that is non numeric in nature. Your answer must be able to explain how project selection is done using the model.

Special Notes: Please follow the following guidelines for all of your assignments in this course:

a) PLEASE NOTE THE COPYING IN THIS ASSIGNMENT CAN RESULT IN DIAQUALIFICATION FROM ALL THE PREVIOUS ASSIGNMNETS. b) ONLY HAND WRITTEN ASSIGNMENTS WILL BE ACCEPTABLE. c) Be precise & specific. Avoid writing unnecessarily. d) No assignment will be accepted after the due date. f) If any confusion in any regard please feel free to contact your Research Associate as soon as possible. g) Any assignment not according to the given rules / policies will not be accepted.

docsity.com