Pharmacy management system (synopsis), Summaries of Database Management Systems (DBMS)

synopsis for pharmacy management system

Typology: Summaries

2020/2021

Uploaded on 10/29/2021

shreyas-patil-2
shreyas-patil-2 🇮🇳

1 document

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Pharmacy Management System|1
PHARMACY MANAGEMENT SYSTEM
A synopsis submitted
If partial fulfillment of the requirements in
Project based learning
Third year
Computer science and engineering
Department of computer science and engineering
Kit’s college of engineering (autonomous), Kolhapur
Semester-v, year 2021-22
pf3
pf4

Partial preview of the text

Download Pharmacy management system (synopsis) and more Summaries Database Management Systems (DBMS) in PDF only on Docsity!

PHARMACY MANAGEMENT SYSTEM

A synopsis submitted

If partial fulfillment of the requirements in

Project based learning

Third year

Computer science and engineering

Department of computer science and engineering

Kit’s college of engineering (autonomous), Kolhapur

Semester-v, year 2021- 22

Synopsis

Title: Pharmacy Management System Team: Gr. No. Roll no. PRN no. Name Email id Phone No. 02 B47 1920000482 Patil Shreyas Sambhaji [email protected] (^9146754774) B48 1920000498 Hujare Vivek Vijay [email protected] (^9284808893) B49 1920000507 Patil Raj Irgonda [email protected] (^7249697730) B51 1920000540 Amte Smruti Sanjay [email protected] (^8459915862) Objective: The main objective of the Pharmacy Management System is to manage the details of Medicines, Stocks, Inventory, Pharmacy, Sells. The aim of this project is to develop a software for the effective management of a pharmaceutical store that will be able to achieve the following objectives:

  • To build an application program to reduce the manual work.
  • To improve accuracy and enhance safety and efficiency in the pharmaceutical store.
  • Editing, adding and updating of Records is improved which results in proper resource management of Pharmacy data.
  • To be able to generate report within a specified period of time.
  • To deal with monitoring the information and transactions of store.
  • To ensure that the system is user friendly.

Work plan: Sr. No. Phase Timeline 1 Requirement analysis 1 st^ week 2 E-R diagram and schema 2 nd^ week 3 Synopsis preparation 3 rd week 4 Database design 4 th^ week 5 Implementation 6 th^ week 6 Testing 8 th^ week 7 Poster & presentation 9 th^ week 8 Submission 10 th^ week