2 / 27 line and at full output : D. Immediately upon receipt of dispatch instructions
4 / 27 A. Identification of the transmission line to tie areas together B. Recalculation of reserves C. Provide updated hydroelectric capability D.Ensure reliable communications are available for all entities involved in the interconnection process: A. Identification of the transmission line to tie areas together D. Ensure reliable communications are available for all entities involved in the interconnection process
5 / 27
A. Efficiency opportunities B. GO requirement C. Reliability requirements D. TO requirement: A. Eflciency opportunities C. Reliability requirements
7 / 27 what timeframe would the report need to be submitted?: A. 1 hour
8 / 27 defined as a:: C. Interchange Transaction
10 / 27
11 / 27 and low impact BES Cyber Systems and the cyber security policies for those systems at least once every:: D. 15 months
13 / 27
14 / 27 communication capa-bilities with each: TOP
16 / 27 percentage of the largest or most single severe contingency of the day?: 80%
17 / 27
19 / 27
20 / 27 Hz Block of load to be restored = 25 MW: .125 Hz eq: (25MW)/ (1000MW) *.(5%)