Process Variability - Buisness Management - Lecture Slides, Slides of Business Administration

Business Management is one of the most important subject in Management Sciences.Following are the key points discussed in these Lecture Slides : Process Variability, Designed Size, Natural Variation, Theoretical Basis, Control Charts, Skewness, Lack of Symmetry, Positive Skew, Negative Skew, Kurtosis

Typology: Slides

2012/2013

Uploaded on 07/29/2013

devang
devang 🇮🇳

4.7

(14)

117 documents

1 / 20

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Process Variability and
Capability
Docsity.com
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14

Partial preview of the text

Download Process Variability - Buisness Management - Lecture Slides and more Slides Business Administration in PDF only on Docsity!

Process Variability and

Capability

Designed Size

Theoretical Basis of

Control Charts

95.5 % of values

within 2σ

Theoretical Basis of Control Charts

99.7 % of values

within 3σ

Kurtosis

 Amount of peakedness

or flatness

Kurtosis < 0 Kurtosis > 0 Kurtosis = 0

Sub-groups with different variances

Heteroskedasticity

Process Capability and 6σ

 A “capable” process has UTL and LTL 3 or more

standard deviations away from the mean, or 3σ.

 99.7% (or more) of product is acceptable to

customers

LTL UTL

3 σ 6 σ

LTL UTL

Process Capability

LTL UTL

LTL UTL

Capable Not Capable LTL UTL LTL UTL

Process Capability

Process

  •  Specs: 1.5 +/- 0.
    •  LTL = 1.5 – 0.01 = 1.
    •  UTL = 1.5 + 0.01 = 1.
  •  Mean: 1.505 Std. Dev. = 0.
    •  LCL = 1.505 - 3*0.002 = 1.
    •  UCL = 1.505 + 0.006 = 1. - 1.
      • 1.49 1. - 1. - 1. Specs

Capability Index

 Capability Index (C pk ) will tell the position of the control limits relative to the design specifications.  C pk ≥ 1.0, process is capable  C pk < 1.0, process is not capable

Process Capability

 Tells how well parts produced fit into specs

 For our example:

 C

pk

= min[ 0.015/0.006, 0.005/0.006]

 C

pk

= min[2.5,0.833] = 0.833 < 1 Process not capable

Process Capability: Re-centered

 If process were properly centered  Specs: 1.5 +/- 0.

 LTL = 1.5 – 0.01 = 1.

 UTL = 1.5 + 0.01 = 1.

 Mean: 1.5 Std. Dev. = 0.

 LCL = 1.5 - 3*0.002 = 1.

 UCL = 1.5 + 0.006 = 1.

Process Specs

What if Not Capable?

 We can’t sell everything we

make to these people

 Find less choosy customers?  Measure & sort all for them?

 Shifting the Mean

 Not trivial, may be easy  Adjust a setting?

 Reducing variability – Hard!

 Process varies over time  Find and get rid of variability  Training workers, new equip?

LTL UTL

LTL UTL

Summary

 All processes exhibit variability

 Reviewed some basic statistical concepts

 Defined process capability measurement, Cpk  Difficulties of making a process capable