VICTOR CONSUNJI DEVELOPMENT CORPORATION
4/F DMCI Corporate Center, 1321 Apolinario Street, Bangkal, Makati City, 1233 Philippines
T +632 856.2497 F +632 856.1366 vconsunji.com
P R O G R E S S S C H E D U L E
FOR October 8, 2020 as per 3:00 pm
Site: M Residences Capitol Hills Project
LOCATION: block 5 lot 1
Committed scope of
Work
Ongoing activity
Status
Documentation
Chb laying
and
Plastering@
Oct 17, 2020
PO Doors and
Windows
PO for Glass
Railings ,
Balcony
Railings ,
Shower
Enclosure
Removal of
Formworks
With PO
No Po yet
On
Schedule
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff

Partial preview of the text

Download Report in english construction and more Lecture notes English in PDF only on Docsity!

VICTOR CONSUNJI DEVELOPMENT CORPORATION

4/F DMCI Corporate Center, 1321 Apolinario Street, Bangkal, Makati City, 1233 Philippines T +632 856.2497 F +632 856.1366 vconsunji.com

P R O G R E S S S C H E D U L E

FOR October 8, 2020 as per 3:00 pm

Site: M Residences Capitol Hills Project

LOCATION: block 5 lot 1 Committed scope of Work Ongoing activity Status Documentation

  • Chb laying and Plastering@ Oct 17, 2020
  • PO Doors and Windows
  • PO for Glass Railings , Balcony Railings , Shower Enclosure - Removal of Formworks - With PO - No Po yet - On Schedule

LOCATION: block 01 lot 01 Committed scope of Work Ongoing activity Status Documentation

  • Chb laying and Plastering @ Oct 17, 2020
  • PO for Doors and Windows
  • PO for Glass Railings , Balcony Railings , Shower Enclosure - Chb Laying for 2F and 3F on going - With PO - No Po yet - On Schedule

LOCATION: BLK 01 lot 2 Committed scope of Work Ongoing activity Status Documentation

  • Chb laying and Plastering @ Oct 17, 2020
  • PO for Doors and Windows
  • PO for Glass Railings , Balcony Railings , Shower Enclosure - Chb Laying for 2F and 3F on going - With PO - No Po yet - On Schedule

LOCATION: Roadworks Committed scope of Work Ongoing activity Status Documentation

  • Concrete Pouring for Roadworks @ Oct 15, 2020 - Installation of Manhole, Drainage , Sewer Line - Excavation of Soil - Late Schedule

LOCATION: BLK 1 lo Committed scope of Work Ongoing activity Status Documentation

  • Installation of Gypsum Board on Going