PROCEDURES
Lifting of roof sheets & jig with the help of Telescopic 80MT, M100T, Slings, D Shackles, tag line, etc.
For the Access to height, Boom lift will be provide.
Tools & tackle should be check.
Proper instruction and training will be given to Sheeting team.
Work permit system
Emergency planning
Before starting the work job specific TBT will be conducted by engineer.
Presence of Supervisor / Engineer and safety officer.
Daily Check list of Lifting tools and machineries
Make sure crane clearance and stability.
Ensure all certificates are verified, including driver’s license.
Check load chart (boom length, radius and angle) for suitability for lifting the load
No person should enter the boom radius and signalman to be assigned and identified by the crane
operator.
Do not load in imbalanced position. Take precaution.
Make the pathway clean and free from all obstacles
Lifting of jig at site
To – PENNAR INDUSTRIES.LTD
Site: MH-2045 M/s. Godrej & Boyce Mfg. Co Ltd, Khalapur - raigad
Lifting Plan for Jig
pf3
pf4

Partial preview of the text

Download spreader bar lifting plan and more Summaries Mathematics in PDF only on Docsity!

PROCEDURES

 Lifting of roof sheets & jig with the help of Telescopic 80MT, M100T, Slings, D Shackles, tag line, etc.

 For the Access to height, Boom lift will be provide.

 Tools & tackle should be check.

 Proper instruction and training will be given to Sheeting team.

 Work permit system

 Emergency planning

 Before starting the work job specific TBT will be conducted by engineer.

 Presence of Supervisor / Engineer and safety officer.

 Daily Check list of Lifting tools and machineries

 Make sure crane clearance and stability.

 Ensure all certificates are verified, including driver’s license.

 Check load chart (boom length, radius and angle) for suitability for lifting the load

 No person should enter the boom radius and signalman to be assigned and identified by the crane

operator.

 Do not load in imbalanced position. Take precaution.

 Make the pathway clean and free from all obstacles

Lifting of jig at site

To – PENNAR INDUSTRIES.LTD

Site: MH-2045 M/s. Godrej & Boyce Mfg. Co Ltd, Khalapur - raigad

Lifting Plan for Jig

Tandem Lifting of Roof Sheet & jig

by double crane 80MT and 100MT

Machinery and Tools & Tackles required

 Number of Crane- 2 no D-shackle- 12no’s(SWL-9.5)

D-shackle- 30no’s(SWL-1 Ton)

 Crane (80 ton) – 1 no Wire rope sling-8 no’s(SWL 8Ton)

 Crane(100ton)– 1 no’s Web sling-30no(SWL 1ton)

Web slings -2nos(SWL 10ton)

mt

r

Degree 65 - Degree

5m

tr

Jig with 10 nos sheets 6 MT 80/100 ton crane 80/100 ton crane

Name

Sign

Date

Prepared By Reviewed by [PIL] Godrej client Godrej client HSE

Person responsible for reviewing

the lifting plan

Date lifting plan received by

reviewer:

Review Date:

Reviewer's Signature: